Handing over/ Taking over Shift:

CHARGE REPORT:

Morning Shift:
 Instruction related to PTW noted
 All important equipment checked found normal.
 AC & DC supply checked found ok
 PTW on VIP & remain in force
 Complete charge hand over to next shift

Night shift:
 Instruction related to PTW noted.
 All important equipment checked found normal.
 AC & DC supply checked found ok.
 No load on AL nor
 PTW on VIP & TARLAI remain in force
 Complete charge hand over to next shift

Evening Shift:
 Instruction related to PTW noted
 All important equipment checked found normal.
 AC & DC supply checked found ok
 PTW on VIP & remain in force
 Complete charge hand over to next shift
Percentage losses:

Sr. No. Unit Unit Sent Difference %Losses


Received Out
1 479000 479509 -509 -0.11%

2 468000 469485 -1485 -0.32%

3 495000 496216 -1216 -0.25%

4 477000 476319 681 0.14%

5 516000 517323 -1323 -0.25%

6 397000 397560 -560 -0.14%

7 418000 419103 -1103 -0.26%

8 448000 448619 -619 -0.13%

9 497000 497575 -575 -0.11%

10 482000 482974 -974 -0.20%

11 466000 466563 -563 -0.12%

12 457000 458372 -1372 -0.30%

13 372000 371940 60 0.016%

14 440000 441163 -1163 -0.26%

15 489000 490457 -1457 -0.29%

16 515000 517320 -2520 -0.45%

17 445000 446270 -1270 -0.28%


Maintenance Schedule For Grid Station Equipment

Recommended
Maintenance or Test Interval Reference
Review equipment rating NERC Planning Standard
5 years
FAC-009-1
Visual inspection with Quarterly to semi- NFPA 70B, 8.9.2.1
binoculars annually Annex I Table I.1
Clean insulator and check 3-6 years Manufacturer’s instruction
connections Ambient dependent manuals
Doble test (power fre- 3-6 years Doble Test Data Reference
quency dielectric loss, Ambient dependent Book
direct current [DC] NFPA 70B, 8.9.2.2
insulation resistance, Annex I Table I.1
power factor)
Replace all silicon As soon as possible PEB No. 12
carbidearresters with Manufacturer’srecommendati
metal oxidevaristor type on
Infrared scan Annually NFPA 70B, 20.17

Maintenance Schedule for Arresters

Recommended
Maintenance or Test Interval Reference
Review equipment rating NERC Planning Standard
5 years
FAC-009-1
Visual inspection with Quarterly to semi- NFPA 70B, 8.9.2.1
binoculars annually Annex I Table I.1
Clean insulator and check 3-6 years Manufacturer’s instruction
connections Ambient dependent manuals
Doble test (power fre- 3-6 years Doble Test Data Reference
quency dielectric loss, Ambient dependent Book
direct current [DC] NFPA 70B, 8.9.2.2
insulation resistance, Annex I Table I.1
power factor)
Replace all silicon As soon as possible PEB No. 12
carbidearresters with Manufacturer’srecommendati
metal oxidevaristor type on
Infrared scan Annually NFPA 70B, 20.17
Maintenance Schedule- Flooded, Wet cell Lead Acid Batteries
Maintenance Schedule- Valve Regulated , Lead Acid (Gel Cell) Batteries
Maintenance Schedule-Vented Nickel Cadmium Batteries

Maintenance Schedule- Battery Chargers


Maintenance Schedule for Oil filled Power Transformers
Transformer Tests

 Transformers Turns Ratio Test:


It is the ratio of the turns between the windings of transformer. It determines the ratio of high
voltage winding to all other windings at no load.

Tap No. (R/Y)/rn (Y/B)/yn (B/R)/bn Calculated

1 21.928 21.937 21.952 21.942


2 21.867 21.879 21.892 21.881
3 21.731 21.732 21.765 21.763
4 21.525 21.523 21.519 21.530
5 21.401 21.413 21.426 21.421
6 20.942 20.933 20.931 20.935
7 20.848 20.853 20.852 20.853
8 20.752 20.762 20.778 20.765
9 20.405 20.415 20.405 20.422
10 20.320 20.339 20.320 20.345
11 20.111 20.105 20.116 20.114
12 19.885 19.890 19.885 19.880
13 19.865 19.868 19.873 19.872
14 19.677 19.685 19.652 19.654
15 19.442 19.449 19.452 19.447
16 19.267 19.265 19.265 19.267
17 19.024 19.027 19.031 19.022
18 18.955 18.952 18.943 18.941
19 18.633 18.631 18.622 18.626
20 18.552 18.549 18.555 18.543
21 18.271 18.265 18.274 18.275
22 18.139 18.135 18.178 18.143
23 18.031 18.034 18.055 18.041
 VOLTAGE RATIO TEST:
It is the ratio of voltage between the windings of transformer. 3 phase AC supply voltage is
applied to high voltage winding and by changing.

Tap no HV SIDE LV SIDE CALCULATED


1 132 10.45 12.25
2 132 10.53 12.36
3 132 10.25 12.25
4 132 10.26 12.85
5 132 10.85 12.98
6 132 10.26 12.58
7 132 11 12.35
8 132 11.96 12.58
9 132 11.47 11.36
10 132 11.85 11.25
11 132 11.36 11.48
12 132 11.25 11.54
13 132 11.55 11.85
14 132 11.58 11.64
15 132 11.65 11.75
16 132 11.85 11.85
17 132 11.36 10.36
18 132 11.25 10.98
19 132 11.36 10.85
20 132 12.25 10.26
21 132 12.32 10.78
22 132 12.26 10.78
23 132 12.36 10.25

Capacitance and Dissipation Factor ( C&DF) Tests:

Mode mA watt %DF C/L

HT/LT
GST-GNDRB 32.94 1.35 0.41 10481
GST-GARRB 9.346 1.102 1.17 2976
UST-USTRB 18.16 2.317 1.27 5798

LV/HV
GST-GNDRB 48.16 6.557 1.36 15333
GST-GARRB 30.04 4.254 1.41 9528
UST-USTRB 18.35 2.322 1.26 5798
HV+LV+body
GST-GNDRB 39.18 5.334 1.36 12517

 Winding Resistance Test:


Transformer winding resistance measurement is carried out as a type test, routine test and
also as a field test.In the factory, it helps in determining the following

1. Calculation of the I2R losses in transformer.


2. Calculation of winding temperature at the end of temperature rise test of transformer.
3. As a benchmark for assessing possible damages in the field.
 HV SIDE
TAP NO. RY YB BR
1 1.37 ohm 1.39 ohm 1.37 ohm
2 1.22 ohm 1.22 ohm 1.22 ohm
3 1.36 ohm 1.37 ohm 1.37 ohm

 LV SIDE
Tap no. Ry Yb br
1 7.67 m ohm 7.63 m ohm 7.66 m ohm

2 rn Yn bn
3 3.90 m ohm 3.88 m ohm 3.88 m ohm

 C & DF TEST:
This test is used to separate the total values of a GST into separate parts for better analysis.
Often this test is used with the GST to confirm the test readings made using the UST.
The C&DF Test Sets can perform excitation-current tests ontransformer windings or other
insulated coil windings.

HV-LV
Mode 3 Mode 4 Mode 5
C= 5925PF 8892PF 2968PF
DF 0.16% 0.36% 0.27%
LV-HV
C= 5924 PF 15825 PF 9886 PF
DF 0.425% 0.34% 0.3 %
HV-LV BODY
Mode 5
C= 12854 PF
DF 0.28%
COMMISSION REPORT:
1. All oil valves are in correct position closed position or opened as required.
2. All air pockets are cleared.
3. Thermometer pockets are filled with oil.
4. Oil is at correct level in the bushing, conservator tank, diverter switch tank etc.
5. Arcing horn of the bushing is set correctly
6. Ct polarity is correct when bushing mounted CTs are provided.
7. Test checked the differential relay with secondary current set pickup alarm and tripping
through set found okay
8. Test checked the O/C & E/F with secondary current set pickup alarm and tripping
through set found okay.
9. Alarm and tripping verified through main Bucholz relay found okay.
10. Alarm and tripping verified through tap changer Bucholz relay found okay.
11. Alarm and tripping verified through oil and winding temp gauges Bucholz relay found
okay.
12. All the terminal in RP&CP are tightened.