Chiller Plant Design

Considerations

Jon R. Haviland, P.E., CEM


Assistant Vice President
Marx/Okubo Associates
jon_haviland@marxokubo.com
z Plantdesign options
z Equipment options
z New plant design considerations
z Retrofit design considerations
z Retrofit project case study

Better Buildings by
Chiller Plant Design 2
Design 2005
Plant Design Options

Better Buildings by
Chiller Plant Design 3
Design 2005
Single Chiller System

Tower

TWP

Chiller

CWP

Loads

Better Buildings by
Chiller Plant Design 4
Design 2005
Single Chiller System
z Advantages
– Lower first cost
– Simple system for installation and control
z Disadvantages
– Inefficient at low load conditions
– Lack of back-up and redundancy

Better Buildings by
Chiller Plant Design 5
Design 2005
Parallel Chiller System
Tower

TWP1

CWP1 Chiller 1

TWP2

CWP2 Chiller 2

Loads
Better Buildings by
Chiller Plant Design 6
Design 2005
Parallel Chiller System
z Advantages
– More efficient at low load conditions
– Provides back-up and/or redundancy
z Disadvantages
– Increased first cost
– More difficult to control effectively, especially with
different size chillers (should have computerized
system)
– More equipment to maintain

Better Buildings by
Chiller Plant Design 7
Design 2005
Series Chiller System
Tower

TWP

Chiller 2 Chiller 1

CWP

Loads

Better Buildings by
Chiller Plant Design 8
Design 2005
Series Chiller System
z Advantages
– Easier to control with simple control systems
– Effective with different size chillers
– Utilize one stand-by pump
– Good for large temperature differential systems
z Disadvantages
– Increased pumping requirements for chilled water
– Chillers may not be interchangeable

Better Buildings by
Chiller Plant Design 9
Design 2005
Primary-Secondary Chilled
Water Systems

Better Buildings by
Chiller Plant Design 10
Design 2005
Primary-Secondary Chilled
Water Systems
z Advantages
– Uncouples chillers and loads to allow variable flow in
loads
– Can be used with large temperature differential systems
– Can be used with thermal storage systems
– Can be used with water-side economizer systems
– Improved control
– Reduced operating costs

Better Buildings by
Chiller Plant Design 11
Design 2005
Primary-Secondary Chilled
Water Systems
z Disadvantages
– Higher first costs
– Requires more, sophisticated equipment
– Requires sophisticated control system

Better Buildings by
Chiller Plant Design 12
Design 2005
Variable Flow Primary
z New chillers can operate with variable flow
z Simplifies system design
z Bypass with modulating control valve
required to maintain minimum flow
z System can be parallel or series design

Better Buildings by
Chiller Plant Design 13
Design 2005
Equipment Options

Better Buildings by
Chiller Plant Design 14
Design 2005
Electric Chillers
z Reciprocating chillers
z Rotary screw chillers
z Centrifugal chillers
z Air-cooled chillers

Better Buildings by
Chiller Plant Design 15
Design 2005
Non-electric Chillers
z Absorption chillers
– Single-effect absorption chiller
z Low pressure steam
z Hot water
z Use in CHP applications
– Double-effect absorption chillers
z Medium pressure steam

z Direct-fired

z Heat recovery

Better Buildings by
Chiller Plant Design 16
Design 2005
Non-electric Chillers
z Centrifugal or screw chiller without electric
motor
– Natural gas engine
– Steam turbine
– Dual drive – engine and electric motor

Better Buildings by
Chiller Plant Design 17
Design 2005
Other Cooling Sources
z Air-sideeconomizer
z Water-side economizer
z Thermal energy storage

Better Buildings by
Chiller Plant Design 18
Design 2005
New Plant Design
Considerations
z Determine requirements
z Design process
z After construction considerations

Better Buildings by
Chiller Plant Design 19
Design 2005
Determine Requirements
z Capacity required
– Current load
– Potential future loads
– Redundancy requirement
– Provisions for special loads

Better Buildings by
Chiller Plant Design 20
Design 2005
Determine Requirements
z Operating profile
– Hours per day
– Days per week
– Continuous loads
– Load diversity

Better Buildings by
Chiller Plant Design 21
Design 2005
Design Process
z Schematic design of possible options
– Chiller sizing
– Chiller Performance
– Cooling sources
– Operating temperatures
– Cooling tower selection
– Basic plant layout

Better Buildings by
Chiller Plant Design 22
Design 2005
Chiller Sizing
z Benefits of different size chillers
– Fewer total operating hours
– More operation above 50% load
z Depends on load profile

Better Buildings by
Chiller Plant Design 23
Design 2005
Even Chillers - 8,463 operating hours

Better Buildings by
Chiller Plant Design 24
Design 2005
Uneven Chillers - 7,624 operating hours

Better Buildings by
Chiller Plant Design 25
Design 2005
Chiller Sizing
z Use of different size chillers may eliminate
need for pony chiller
z Variable speed chillers provide improved
part load performance and minimum
capacity

Better Buildings by
Chiller Plant Design 26
Design 2005
Chiller Performance Ratings
z American Refrigeration Institute Standard
550/590-98
z Standard conditions
– Full load
– Chilled water temperatures - 54 F to 44 F
– Condenser water temperatures - 85 F to 95 F
z Efficiency rating - kW/Ton

Better Buildings by
Chiller Plant Design 27
Design 2005
Chiller Performance Ratings
z Part load efficiency
– Integrated Part Load Value (IPLV)
z Standard temperature conditions

z Weighted average of kW/ton at various loads

– Non-standard Part Load Value (NPLV)


z Specific application temperatures

z Same weighting as IPLV

Better Buildings by
Chiller Plant Design 28
Design 2005
Chiller Performance Ratings
z IPLV/NPLV rating scale
– A = kW/ton at 100% load
– B = kW/ton at 75% load
– C = kW/ton at 50% load
– D = kW/ton at 25% load
z ARI Standard 550-98
– IPLV = 1/(0.01/A + 0.42/B + 0.45/C + 0.12/D)

Better Buildings by
Chiller Plant Design 29
Design 2005
Cooling Sources
z Use of different fuel sources provides
flexibility and reliability
z Types to be considered depend on several
factors
– Utility rates and structure
– Load profile
– Air quality considerations
– Maintenance considerations

Better Buildings by
Chiller Plant Design 30
Design 2005
Cooling Sources
z Economizer cycle
– Air-side generally most effective
– Water-side use
z Building configuration does not allow air-side

z Cooling for special load requirements

z Climatic considerations

Better Buildings by
Chiller Plant Design 31
Design 2005
Operating Temperatures
z Chilled water supply temperature
– Lower supply temperature
z Reduced air flow requirements

z Improved dehumidification

z Increased chiller operating cost versus reduced fan

operating costs, especially with a VAV system

Better Buildings by
Chiller Plant Design 32
Design 2005
Operating Temperatures
z Chilled water ∆T
– Higher ∆T means reduced pipe size and
pumping requirement, increased coil size, and
reduced fan energy
– Optimum temperature depends on amount of
piping in system

Better Buildings by
Chiller Plant Design 33
Design 2005
Chilled Water ∆T
Comparison

Better Buildings by
Chiller Plant Design 34
Design 2005
Operating Temperatures
z Condenser water supply temperature
– Lower supply temperature improves chiller
efficiency
– Approach temperature can be 6 – 10 ºF above
design wet bulb
– Use 0.4% design temperature data

Better Buildings by
Chiller Plant Design 35
Design 2005
Operating Temperatures
z Condenser water ∆T
– Normal 10ºF works well in most cases
– Larger ∆T common with absorption chillers
due to higher load and should be considered for
large systems or when the cooling tower is
remote from the chiller plant
– Reduced chiller efficiency versus smaller pipes
and reduced pumping horsepower

Better Buildings by
Chiller Plant Design 36
Design 2005
Cooling Tower Selection
z Selection should be based on required water
flow, optimum approach temperature and
∆T
z Allowance for potential tenant equipment
load
z Selection should based on water-side
economizer conditions if that is part of
system
Better Buildings by
Chiller Plant Design 37
Design 2005
Cooling Tower Selection
z Increasing size of the cooling tower is
generally the least expensive way to
improve the efficiency and provide some
safety margin in the system
z Use of variable speed drive on the fan
motor minimizes any operating cost penalty

Better Buildings by
Chiller Plant Design 38
Design 2005
Determine Basic Plant
Layout
z Select system that will best fit needs of
project
z For simpler systems, parallel system with
different size chillers is probably best
choice

Better Buildings by
Chiller Plant Design 39
Design 2005
Determine Basic Plant
Layout
z Systems with different occupancy schedules
or load requirements need more complex
system
– Primary-secondary plant offers most flexibility
– Variable primary flow works with new electric
chillers with less complexity than a primary-
secondary system

Better Buildings by
Chiller Plant Design 40
Design 2005
Determine Basic Plant
Layout
z Large chilled water ∆T
– Series plant
– Primary-secondary with primary flow greater
than secondary flow

Better Buildings by
Chiller Plant Design 41
Design 2005
Design Process
z Analyze options
– Opinion of probable costs
– Operating cost estimates
z Screening measures

z Energy simulation

– Life cycle costs

Better Buildings by
Chiller Plant Design 42
Design 2005
Design Process
z Complete design of chosen option
– Peer review
– Operator review
– Determine sequence of operations

Better Buildings by
Chiller Plant Design 43
Design 2005
New Plant Design
Considerations
z After construction activities
– Commissioning
– Training

Better Buildings by
Chiller Plant Design 44
Design 2005
Chiller Plant Retrofit
Considerations

Better Buildings by
Chiller Plant Design 45
Design 2005
Don’t Simply Replace;
Re-engineer
Chiller Plant Retrofit
Considerations
z Basic process should follow same steps as
outlined above
z Additional considerations
– Engineer and contractor should have experience
with this type of project

Better Buildings by
Chiller Plant Design 47
Design 2005
Chiller Plant Retrofit
Considerations
z Additional considerations
– Engineer needs to familiarize himself with
existing plant
z Record drawings
z Operator interview
z Observation of plant

Better Buildings by
Chiller Plant Design 48
Design 2005
Chiller Plant Retrofit
Considerations
– Constructability should be considered during
design phase
z Operator review
z Contractor review
– Coordination critical during construction phase

Better Buildings by
Chiller Plant Design 49
Design 2005
Retrofit Project Case Study
Background
z Vacated single tenant building
z 26 years old
z Adjacent buildings under same ownership
with sale of one or all unlikely
z Building to be taken to shell condition and
renovated for multi-tenant use
z Due diligence based on these assumptions

Better Buildings by
Chiller Plant Design 51
Design 2005
Site Plan

Better Buildings by
Chiller Plant Design 52
Design 2005
Participants
z Owner
z Projectmanager
z Property managers (2 firms)
– Contract maintenance staff
z Construction manager
z Consultants
– Architect
– Engineer
Better Buildings by
Chiller Plant Design 53
Design 2005
Existing Central Plant
z Located in penthouse
z Two 360-ton single effect absorption chillers
z Two low pressure steam boilers
– Modified to meet AQMD requirements
– Also provides heating and domestic hot water
z Two cell cooling tower
– Replaced three years earlier
– Capacity for single effect absorption chillers

Better Buildings by
Chiller Plant Design 54
Design 2005
Possible Options
z Electricchillers
z Absorption chillers
z Engine-driven chillers
z Thermal storage
z Independent or with adjacent building

Better Buildings by
Chiller Plant Design 55
Design 2005
Alternatives Considered
z Stand-alone alternatives
– Two 350-ton electric chillers
– Two 350-ton absorption chillers
– Two 350-ton engine-driven chillers
– Electric chillers with 4500 ton-hour thermal
storage

Better Buildings by
Chiller Plant Design 56
Design 2005
Alternatives Considered
z Integrated alternatives
– Provide piping between two buildings
– Utilize one of the four options above for the
stand-alone plant

Better Buildings by
Chiller Plant Design 57
Design 2005
Alternatives Considered
z Single plant alternatives
– Abandon plant in Building 2 and expand plant
in Building 3 with piping between the buildings
– Existing Plant in Building 3
z Three 250-ton electric chillers in plant on parking
level P-2
z Cooling tower on roof

Better Buildings by
Chiller Plant Design 58
Design 2005
Alternatives Considered
z Single plant alternatives
– New Equipment possibilities
z 600-ton electric chiller

z Two 350-ton engine-driven chillers

z Two low temperature chillers plus 4500 ton-hour

thermal storage

Better Buildings by
Chiller Plant Design 59
Design 2005
Constructibility Issues
z Building 2 options
– Electric capacity
– Cooling tower and structure
– Existing chilled water riser size
– Noise considerations

Better Buildings by
Chiller Plant Design 60
Design 2005
Constructibility Issues
z Building 3 options
– Cooling tower capacity
– Condenser water riser size
– Thermal storage space requirements
– Engine exhaust routing
– Electrical capacity

Better Buildings by
Chiller Plant Design 61
Design 2005
Analysis
z Opinion of probable costs
z Schedule
z Operating costs
– DOE-2 simulations
– Nine options considered

Better Buildings by
Chiller Plant Design 62
Design 2005
Analysis
z Other considerations
– Electricity riser problem in Building 2
– Impact of utility deregulation

Better Buildings by
Chiller Plant Design 63
Design 2005
Economic Analysis
z Based on estimated impact of deregulation
z Final options
– Integrated system with new chillers in Building
2 connected to Building 3 plant
z 700-tons electric
z 700-tons absorption

Better Buildings by
Chiller Plant Design 64
Design 2005
Economic Analysis
z First Cost
– 700 ton electric
z $929,223

z $1,109,273 with potential bus duct repair

– 700 ton absorption


z $1,395,247

Better Buildings by
Chiller Plant Design 65
Design 2005
Economic Analysis
z Annual energy cost
– 700 ton electric - $778,160
– 700 ton absorption - $680,769
z Simple Payback
– Without bus riser repair – 4.5 years
– With bus riser repair – 1.9 years

Better Buildings by
Chiller Plant Design 66
Design 2005
Final Choice
z Absorption chillers in Building 2 with
connection to Building 3
– Proactive ownership with long term outlook
– Support from local natural gas utility
– Optimum conditions for new plant in Building
2
– Significant problems with expanding plant in
Building 3
Better Buildings by
Chiller Plant Design 67
Design 2005
Chiller Purchase
z Chiller pre-purchased by owner
– Maintain control over final selection and
options
– Delivery critical
z Potential full building tenant wanted early
availability
z City rigging restrictions – Saturday night only

Better Buildings by
Chiller Plant Design 68
Design 2005
Chiller Purchase
z Bid to major manufacturers
z Bid specified conditions of capacity, giving
cost, efficiency, delivery and willingness to
accept penalty clause
z Allow manufacturers to suggest alternatives
of capacity and/or efficiency and additional
cost for this

Better Buildings by
Chiller Plant Design 69
Design 2005
New Central Plant
z Two 360-ton direct fired absorption chillers
with lower supply temperature
z One 120-ton rotary screw chiller for off
hours use (minimum effective absorption
chiller capacity)
z Primary-secondary piping system
z Piping between the two buildings with
transfer pumps and metering
Better Buildings by
Chiller Plant Design 70
Design 2005
Single Line Diagram

Better Buildings by
Chiller Plant Design 71
Design 2005
Sequence of Operations
z Seven modes of operation identified with
written sequence
z Independent versus integrated operation
z Electric or gas chiller base load
z Occupied versus unoccupied

Better Buildings by
Chiller Plant Design 72
Design 2005
Phase II
z Building 1 central plant
– Originally absorption chillers and boilers
– Reciprocating chillers installed in 1987
z Noise complaints

z Reliability issues

– Small chiller in Building 3 plant for Fitness


Center after hours use with piping to lower
level air handling unit

Better Buildings by
Chiller Plant Design 73
Design 2005
New Building 1 Plant
z Two centrifugal chillers and new cooling
tower
– Tower selected for maximum capacity for space
available
– Chillers selected to match cooling tower
capacity
– Use existing connection (increase size to
maximize transfer capacity) with new riser
Better Buildings by
Chiller Plant Design 74
Design 2005
New Single Line Diagram

Better Buildings by
Chiller Plant Design 75
Design 2005
Summary
z Project illustrates choices available and
retrofit process discussed
z Ownership with long term outlook
z Cooperation by all participants
z Life is easier with a vacant building

Better Buildings by
Chiller Plant Design 76