E. MATERIALS
E1. CONCRETE :

CONCRETESPECIFICATIONSTABLE
CEMENTITIOUSMATERIALS 28DAYCYLINDER DURABILITYCRITERIA
3) W COMPRESSIVE (MAXIM
UM@ 28DAYS)
M
EMBER CONCRETE CO NTE
NT(kg/m ATER - STRENG TH (
N /m
m2)
MIXTYPE PROO F W
/C W ATER W ATER RCP
O
PC G GBS M S ADDITIVE SPECIFIED R EQUIRED
AVERAGE A
BSO
R
(%
P
)
TIO
N PEN ET
(mR
mA
)TION (COULOMBS)
-BLINDINGCONCRETE A 300 ---- ---- ---- 20 25 0.50 ---- ---- ----
-BOTTOMSLABSANDUNCOVEREDPARTS
OFGROUNDFLOO RSLABS.
-UNCOVEREDROOFSLAB B 190 230 ---- YES 32 37 0.33 1.0 8.0 800 LOCAL AUTHORITY APPROVAL:
-M ANHOLES
-W ATERTANKSW ALLS.
-BASEMENTW ALLS
-COLUM NSINSIDEW
COLUMNSM
ATERTANKS,
ONOLITHICW ITH
C 190 230 ---- YES 32 37 0.33 1.0 8.0 800 GENERAL NOTES:
WATERTANK/COLLECTIONTANK
WALLS.
-BASEM ENTFLOORSLAB,RAFT, 1. THIS DRAWING IS THE COPYRIGHT OF AWTAR
SLABONGRADEANDGROUNDBEAM S D 126 294 ---- ---- 32 37 0.33 1.5 10.0 1000
ARCHITECTURAL &
-ALLFLOORSLABS&BEAMS,
STAIRCASES,PARAPETS,...etc. E 190 230 ---- ---- 32 37 0.33 1.5 10.0 1000 ENGINEERING CONSULTANCY , SHARJAH, AND MUST NOT
-COLUMNS,W ALLS,COUPLINGBEAM
(CB)ANDSPANDRELBEAMS.
S F 190 230 ---- ---- 32 37 0.33 1.5 10.0 1000 BE
2. ALL DIMENSIONS
RETAINED, COPIED ORARE IN MM
USED AND LEVELS
WITHOUT ABOVEINCONSULTANT'S
MM UNLESS
NOTED OTHERWISE, ALL DIMENSIONS TO BE VERIFIED ON
AUTHORITY.
-OPCDENOTESORDINARYPORTLANDCEM ENTTOASTMC150TYPE1ORTOBSEN197-1:2000. SITE AND APPROVED BY THE ENGINEER.
-GGBSDENOTESGROUNDGRANULATEDBLASTFURNACESLAGTOBS6699.
-MSDENOTESMICRO SILICATOASTMC1240.
-W/CDENOTESW ATERTOCEMENTITIOUSMATERIALSCONTENTRATIO. 3. DIMENSIONS MUST NOT BE SCALED FROM THIS DRAWING.
-WATERABSORPTIONTESTTOBS1881:PART122:1983.
-WATERPENETRATIONTESTTODIN1048:PART105:1991
-RAPIDCHLORIDEPERMEABILITYTESTTOASTMC1202:1991.
-FORW ATERPROOFADDITIVEREFERTOW ATERPROOFINGSPECIFICATIONS.
4. ALL DIMENSIONS TO BE CHECKED ON SITE AND DISCREPANCIES
-SELFCOM PACTINGCONCRETECANBEUSEDTOREPLACEANYOFTHEABOVEM
ACHIEVESTHESAMESPECIFIEDSTRENGTH&DURABILITYCRITERIA.
IXESPRO VIDEDIT E.3 TENSION LAPS: TO BE REFERRED TO THIS OFFICE FOR DECISION.
-COUPLINGBEAM SARETHEBEAM SCONNECTINGCOREW ALLS.ALLBEAMSSTARTW ITH"CB"ARE
COUPLINGBEAM S. 5. IN CARRYING OUT WORKS RELATING TO THIS DRAWING, THE
-THEABOVECONCRETEM IXDESIGNSAREFORGUIDANCEONLY.THECONTRACTORCANSUBMITHISOW NDESIGNS
FORENGINEER'SAPPRO VALPROVIDEDTHEYACHIEVETHESAM ESPECIFIED/REQUIREDAVERAGESTRENGTHSAND CONTRACTOR IS TO BE RESPONSIBLE FOR COMPLYING WITH
DURABILITYCRITERIA. THE
FULL REQUIREMENTS OF ALL RELATED LEGISLATION
INCLUDING LOCAL STATUTORY AUTHORITY, SERVICES
REGULATIONS AND ALL SAFETY ACTS (LATEST EDITION).
6. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH
OTHER
RELEVANT, ARCHITECTURAL, STRUCTURAL,
MECHANICAL AND ELECTRICAL DRAWINGS AND ALL
RELEVANT SECTIONS OF THE SPECIFICATIONS.

H. STRUCTURAL STEELWORK KEY PLAN

F. CONSTRUCTION METHODOLOGY :

NOTES:

CLIENT:

MR. ABDELAZIZ HAMID ALSEWIDI

I. WATER PROOFING PROJECT NAME:


PROPOSED COMMERCIAL &
RESIDENCIAL BUILDING
GROUND + 3 TYPICAL + ROOF
J. POST TENSION SLABS:
PLOT NO : 1385
MUWELEH COMMERCIAL - SHARJAH
CONSULTANT:

ENGINEERING CONSULTANCY

POBOX65885 TEL: +971 (0) 4 5540100,FAX: +971 (0) 4 4310470


DUBAI Web site : www.atriumuae.com
E.2 REINFORCEMENT : UNITEDARABEMIRATES E-mail : admin@atriumuae.com

DRAWING NAME:

GENERAL NOTES
2

AUTHORIZED BY M.BALAAWI DATE JAN-2017


DESIGNED BY M.SHAHRORI STAGE FINAL

DRAWN BY M.M SHEET SIZE A2


CHECKED BY M.SHAHRORI SCALE NTS
G. EXCAVATION AND EARTHWORK :

S - 002 17-31

ISSUED FOR: