POL GAS FILLING PLANT KARACHI

DAILY PLANT ACTIVITY REPORT.

25/8/2018

S.No. Description Remarks. Remarks.


1 Daily sell 5.250 MT.

2 Daily receipt NRL : 53.416 MT.


3 Gain/Loss 0.003 Gain
4 Maintenance activity carried Dismantling of over head tank is in progress, but finishing date
out at plant For work is not given by contractor. This delay is causing hindrance
In testing firewater pump.
5 Any maintenance requirement Maintenance of LPG-pump for Browser decanting is due
6 Leakage/Breakage --------
7 Visitor in/Out --------
8 Any Activity which IS required Shifting of generator received from POL_KHOUR To generator room
to bring into management completed, its testing will be after completing necessary jobs
notice for its permanent use.
9 Completion of maintenance -------------
jobs if carried out
10 Safety related issues Water we are using for fire-fighting use is quality wise “Brine”
And is not recommended permission is required to use sweet water
for this purpose
11 Office disciplines related ---------------
maters.

(MURAD ALI SHAH)

Consultant Engineer,

POL
PAKISTAN OILFIELDS LIMITED
POLGAS KARACHI

S.N PART NO. DESCRIPTION QTY REMARKS

1 SWT- SOLENOID OPERATED GAS STOP VALVE FLAME PROOF COIL 4 nil
230V/50HZ.
SOL.VALVE

2 SWT- 3 1

SOL/VALVE/ KIT REPAIR KIT FOR FOR GAS STOP VALVE

3 SOL/VALVE/COIL COIL FOR GAS STOP VALVE (ITEM # 1) 3 1

4 AAA 20604 PRINTED CIRCUIT BOARD ASSEMBLY 2 nil

5 AAA-20474 MAIN CIRCUIT BOARD ASSEMBLY 2 1

6 AAA 20242 DISPLAY / KEY BOARD , CIRCUIT BOARD ASSEMBLY 4 nil

7 FUS-OP1ANBS FUSE5X20MM, 1 AMP. NORMAL BLOW 15 NIL

8 FUS-OP 25AFBS FUSE5X20MM, 0.25 AMP. FAST BLOW 15 NIL

9 EL/SAFM/19 Filling head 4 nill

10 Load cell 2 nil

11 EL/SAFM/22 G1/4,5/2WAY SINGLE SOLENOIDVALVE MODLE9710032 3 1


C/W 220 VOLT 50HZ EXPLOSION PROOF COIL MODEL3063

12 EL/SAFM/23 Pneumatic valve G1/8,3/2 WAY Knob /pilot actuated valve 3 1


PAKISTAN OILFIELDS LIMITED
POLGAS KARACHI

Date: 11/9/2018

AGM (S&M)

Pakistan Oil Fields Ltd,

POL-House, Morgah,

Rawalpindi

SUBJECT: SPARE PARTS FOR ELIXIR LPG FILLING MACHINES

Sir,

We would like to inform you that listed spare parts are required for

The maintenance of Elixir LPG filling machines at POL gas filling plant Karachi

List of parts attached.

( Nasir Ali Channa )

Plant superintendent

POL Gasplant,

Karachi
POL GAS PLANT KARACHI
Maintenance Schedule for the month of November 2018

1) 3/11/2018 start and checking behavior of engine


2) 7/11/2018 check up of all filling machines
3) 13/11/2018 Working of Generator
4) 22.11.2018 Check up of LPG pump behavior