RENCANA ANGGARAN BIAYA

PROYEK LANSEKAP MAKET MASTERPLAN MAN INSAN CENDEKIA GOWA

HARGA TOTAL
NO. URAIAN PEKERJAAN VOLUME SAT
SATUAN (Rp.) HARGA (Rp.)

I PEKERJAAN PERSIAPAN

1 Pekerjaan lahan Maket 1.00 ls 1,000,000.00 1,000,000.00


2 Pekerjaan penambahan dan pembetukan media 2.52 m2 500,000.00 1,260,000.00

Total I 2,260,000.00

II PEKERJAAN MINIATUR MAKET 1:500

II.A Bahan Taman/Halaman

Pohon
1 Palem Raja 90.00 phn 45,000.00 4,050,000.00
2 Palem Sadeng 90.00 phn 80,000.00 7,200,000.00
3 Palem Botol 90.00 phn 35,000.00 3,150,000.00
4 Pohon Cabang 90.00 phn 40,000.00 3,600,000.00
5 Pisang Kipas 90.00 phn 35,000.00 3,150,000.00
6 Onclang Ceper 90.00 phn 35,000.00 3,150,000.00
7 Pohon Bulat 90.00 phn 40,000.00 3,600,000.00
8 Cemara Udang 90.00 phn 40,000.00 3,600,000.00

Perdu
1 Sikas Halus (warna) 5.00 duz 35,000.00 175,000.00
2 Bonsai Rumbai (Polos Hijau) uk. Sedang 5.00 duz 35,000.00 175,000.00
3 Bonsai Tulang (Uk. Sedang) 5.00 duz 35,000.00 175,000.00
4 Cemara Busa 5.00 duz 35,000.00 175,000.00

Rumput
1 Media Rumput Halus 78.75 m2 45,000.00 3,543,750.00
2 Media Rumput Sedang 39.38 m2 45,000.00 1,771,875.00

Subtotal II.A 37,515,625.00

III ELEMEN TAMAN

1 Koral Putih 1.00 krg 125,000.00 125,000.00


3 Mika/Fiber Falt 3mm 7.00 lmb 125,000.00 875,000.00
4 Karton Maket 15.00 lmb 20,000.00 300,000.00
5 Pasir Sencon/Silica 1/2 Krg 125,000.00 62,500.00

Subtotal II.D 1,362,500.00


Subtotal II 38,878,125.00

TOTAL ( I+II ) 41,138,125.00


DIBULATKAN 41,138,125.00

Surabaya, 21 November 2016


Dibuat Oleh,
CV. MAKET BINTANG

BINTANG JAYA

Terima Kasih Telah Menggunakan Jasa Kami