RADIOGRAPHY INSPECTION REPORT
CLIENT : PT. CITRA SHIPYARD Report No : 001/CS/ALU/ATI/RT
ADDRESS : Sei Lekop Kav.20,Sagulung Date of Inspection : 30 November 2017
: Batam 29472, Indonesia Procedure : ATI-QCP-RT36-AWS
PROJECT : Aluminium Request No : -
LOCATION : CITRA YARD Acceptance Criteria : AWS D1.2
Material : Aluminium Film Type : KODAK MX125 SFD : 350 mm
Welding Process : GMAW Film Size : 4" X 15" Technique : SWSI
Type of Source : Ir-192 Screen Type : LEAD SCREEN Placement IQI : Source side √ Film side
Sources Size : 3 x 2 mm Strength : 42 CURIES IQI :ASTM 02B
VW : Wire No 6

Joint Length Welding SCH/THK


No Film Identification
Process
Welder ID Position SOD Density Sensitivity Interpretation Result
No. ( mm ) (mm)

1 AFIFUDIN WQT - GMAW 4G 12 to 16 STR/03 A-B 338mm 2-4 2% Por sum>10mm Rej
WQT - GMAW 4G 12 to 16 STR/03 A-B 338mm 2-4 2% Por sum>10mm Rej

Note:
PT.ASTAR TESTING &
INSPECTION QA / QC SURVEYOR OF CLASS OWNER
RT LEVEL II

NAME : HANIFUDDIN NAME : NAME : NAME : NAME :


Date : 02.12.2017 Date : :
:Date Date : Date : DATE :
Legend: NAD : No Apparent defect LOF : Lack of Fusion ROC : Root Concavity
C : Crack IP : Incomplete Penetration EP : Excess Penetration
Por : Porosity TI : Tungsten Inclusion SP : Spatter
ACC : ACCEPTED UC : Under Cut BT : Burn Through MM : Mismatch
REJ : REJECT LOP: Lack of Root Penatration SI : Slag Inclusion GCP : Cluster Porosity
FM : Film Mark IF : Incomplete Fusion GM : Grind Mark

This report shall not be reproduced except in full, without the written approval of PT . ASTAR TESTING & INSPECTION Page No: 01 of 01
PT. ASTAR TESTING & INSPECTION
Komp.Puri Mas Blok B No. 12 Batam Centre - Batam
Telp : (0778) 480 1275
Website : astartesting.com.sg
RADIOGRAPHY INSPECTION REPORT
CLIENT : PT. TRANSALINDO EKA PERSADA Report No : 002/TRSL/ATI/RT
Date of Inspection : 01 March 2019
ADDRESS : Jalan Kerapu, Tanjung Sengkuang , Batam
Procedure : ATI-QCP-RT82- Rev.6
PROJECT : T-556
LOCATION : PT. TRANSALINDO WORK SHOP Acceptance Criteria : UW 51 ASME VIII Div. 1, 2017 Edition
Material : CARBON STEEL Film Type : AGFA D7 SFD : 223 mm
Welding Process : GTAW+SMAW Film Size : 4" X 10" Technique : DWDI
Type of Source : Ir-192 Screen Type : LEAD SCREEN Placement IQI : Source side √ Film side
Sources Size : 3 x 2 mm Strength : 10 CURIES IQI :ASTM 1B
VW : Wire No 6

Joint Length Welding SCH/THK


No Film Identification
Process
Welder ID Position SOD Density Sensitivity Interpretation Result
No. ( mm ) (mm)
FUEL GAS FILTER
1
(F-2501-A)
CS#03 - GTAW-SMAW 8''SCH40 AB 91 0-7 220mm 2-4 2.7-3.0 1.69% Por 1mm ACC

7 - 14 2.8-3.0 1.69% - ACC


14 -21 2.8-3.0 1.69% - ACC
21 -0 2.8-3.0 1.69% - ACC

Note:
PT.ASTAR TESTING &
INSPECTION QA / QC SURVEYOR OF CLASS OWNER
RT LEVEL II

NAME : H IRWANSYAH NAME : NAME : NAME : NAME :


Date : 02.03.2019 Date : :
:Date Date : Date : DATE :
Legend: NAD : No Apparent defect LOF : Lack of Fusion ROC : Root Concavity
C : Crack IP : Incomplete Penetration EP : Excess Penetration
Por : Porosity TI : Tungsten Inclusion SP : Spatter
ACC : ACCEPTED UC : Under Cut BT : Burn Through MM : Mismatch
REJ : REJECT LOP: Lack of Root Penatration SI : Slag Inclusion GCP : Cluster Porosity
FM : Film Mark IF : Incomplete Fusion GM : Grind Mark

This report shall not be reproduced except in full, without the written approval of PT . ASTAR TESTING & INSPECTION Page No: 01 of 01