You are on page 1of 2

V.V.

RAVI KUMAR (Metallurgical Engineer)


Padra Rewa M.P. Email: venkattravi23@gmail.com Phone: (M) +91 8821891001: 7974357048

13 Metallurgical experience in chemical composition of liquid metal.

Technical expert with 13 years experience in melting metal industry


Currently associated with Jaypee Hi-Tech. Casting Center Rewa.
Expertise in Handling ARC furnace , Induction furnace, L.R.F..
Comprehensive knowledge of the nature and properties of metals
Extensive knowledge of scientific properties of minerals and metals.
Familiar with theories ,principal and electro magnetic properties of metals
Sound knowledge in metallurgical behaviour of metals.
TECHNICAL EXPERIENCE

ARC FURNACE :
Operation of ARC Furnace with capacity of 5, 10, 15, 20 and 40 tons for preparation of various grades
of steel.
Induction Furnace :
Maintaining chemical composition of various grades of steel and inspecting the lining life and its
maintenance.
L.R.F. :
Handling ladle refining furnace of capacity 15 tons for maintaining chemical composition and for reducing
impurities in steel .

PROFESSIONAL EXPERIENCE

Jaypee Hi-Tech. Casting center Rewa .:(2012 _ till now)


(May’ 12 – Present)
(As an Sr.Engineer) Melting for Grinding Media and No-Bake melting

Key Responsbilities:-Looking after the production related melting activities. Daily consumption report,
Handling melting process of the plant through using various kind of furnace
Control and monitor development activity.
Co-ordination with molding department for next process.
Implement various cost saving methods .
Proper manpower management for controlling overall rejection.
Effective and efficient utilization of manpower and machinery.
Achieve production targets within time set .
Updating departmental records and database.
Successfully completed IMS audit.
Reporting the overall production activity to Production manager.

Topworth Steel and Power LTD. : ( 2009_2011)


(Nov’ 09 – Apr’ 12)
(AS Shift Incharge process in LRF)

Key Responsbilites :-

 Monitoring the ladle furnance operation and induction f/c 20tons .


 Control over the impurities like phosphorus,sulphur and to bring it down to desired level by process.
 Finally sending the ladle to C.C.M unit for pouring.

Bhilai Engineering Corp. : ( 2004_2009 ) (’ 05 –


Oct’ 09)
Jr. Executive Grade E-2

1
Key Responsbilities :-
 To monitor the operation of Arc furnace of 15tons,10 tons, 20 tons,8tons and induction furnance of 3tons for the
preparation of liquid metal for the production of casting.
 Checking the chemical composition by following the spectro analysis report from the lab.
 Control over the temperature of the liquid bath inside the furnance by using thermocouple.
 Monitoring the tapping process at the suitable conditions.
 Taking the ladle to the moulding section and monitoring the teeming process.
 Overall to look after the entire melting process i.e from charge preparation,ladle preparation, inspecting furnance
lining and man power handling.

SALARY
Current CTC : 5.5 Lakhs Per annum
Expected CTC : Negotiable
Computer Skills :

Operating System Dos , Windows,


Packages Ms-Office

Training and Workshops:

Six Month Vocational training in bhilai steel plant on Plate mill, Rolling mill, Blast furnace area, coke/oven batteries,
Arc furnace .

Academic Qualification

Secondary School with 76% in 1994 from Charoda English Medium C.G.

Higher Secondary School with 68% in 1996 B.N.S.E.M.H.S School Bhilai C.G

Metallurgical engineering with 62.45% in 2001 from Govt. Polytechnic College Durg C.G.

Personal Details :

DOB : 23rd Nov 1979


Marital Status : Married
Address : LIG 67 b Shanti Vihar Colony Padra
Rewa – 486002
Reference : Available on request

Declaration
I hereby declare that above information is true in best on my knowledge.

You might also like