1. For how long must RT be retained following tank repair or alterations?
2. Hammer testing is least useful when used to check for….. 3. The preferred method of providing Cathodic Protection to large tank bottom is the use of…. 4. While a Vacuum box test is being performed, the gauge should register Partial vacuum at least…. 5. Flame arrestor should be opened and inspected primarily….. 6. When neither RBI nor similar service performed for a new tank with this film lining, the internal service until the next inspection. 7. After Stress relief but before Hydrotest, stress relief shall be examined visual and….. 8. Which make reduction in the available capacity of tanks? 9. The Nozzle in hot tapping shall be tested at……. 10. Responsibility for PQR is on…… 11. Standard method for determining effectiveness for CP……. 12. To API 653 hot taps are…… 13. Welder who qualify for plate groove welds qualify for what else? 14. To API 653 measured during hydrotest………. 15. To API 653 what is the qualifications requirement on examiner. 16. The reinforcement plate surrounding 24" Nozzle must be replaced after completing the repair the reinforced plate must……. 17. When inspecting floating roof with volatile liquid. 18. When no RBI, the min. thickness for tank bottom….. 19. Change in service of tank to Partial vacuum or external pressure. 20. Which surface preparation is the min. required for internal coating. 21. After change in service, which increase Brittle fracture? 22. Frangible joint at roof corroded and require repair 23. Brittle fracture apply to what tank 24. Shell 15 mm thickness bottom 6.4 mm, new operations when testing using what technique? 25. If identification not known, what test should be taken for plates? 26. Steel floating roof on tank temp. 220 F (104C) with holiday 27. Inservice tank reinforcement over applied in API 650 28. Corroded roof plate should be repaired or replaced when….. 29. Widely scattered pits ignored if depth exceeds ………. Of min acceptable thickness 30. For API 653 Owner-operator shall maintain complete record file consisting of….. 31. API 653 AI is responsible to evaluate what? 32. With respect to protective coating, rust easily found by…… 33. API 653 re-certification…………… 34. Dew point 35. Insert plates for Integral reinforcement with tapers to shell plate thickness using trappers of… 36. Coating film holiday 37. Low voltage wet sponge detector used for 38. Types of required external inspections….. 39. For safety min. number of rafter that a planked should span…… 40. When arc blow occurs when Material test happen…… 41. Change in service in low temperature 42. When frangible roof to shell joint is req. 43. Weld on patch plate not permitted on critical zone on St. St. when temp. is…… 44. Penetration tested by…….. 45. Tank be external inspection every 5 y or….. 46. Density of step welds…… 47. Welding shall to bottom joint…… 48. When in accessibility of placing the penetration on source side 49. Repair on internal floating roof 50. Lack of circularity affect impede for floating roof 51. Which example of major alteration? 52. Which does not require welder qualification? 53. Which cause of lining failure 54. Replace of roof plates support cone roof plate carrying load excess of 25 pounds 55. Min. distance between three plate lap joints 56. Insulation condition of the shell. 57. External UT measurement how many? 58. Bottom seams of riveted tanks can be checked for proper tightness for…. 59. Welding consumable for tank repair must comply which one of classification? 60. Hot tap Nozzle what min. number of plate thickness reading shall be taken…… 61. Brittle fracture occurs only at……. 62. API 653 Insert plate does not cross horizontal weld should be cut by mud the new vertical joint for a min. of… 63. Internal inspection the primary concert is…… 64. API 653 req. min. thickness for replacement shell plate shall be…….. 65. What is the min. radius for covers for replacement shell plate? 66. Annual Cathodic protection…….. 67. Bottom plate outside shell to bottom fillet weld….. 68. Change of service with require to brittle fracture hydrotest not required when….. 69. Material or device placed against the root of the weld joint or at both sides of a weld in welding, to support and retain molten weld is called 70. Cavities result from grinding shall be examined by…… 71. CUI prevention is best achieved by…. 72. Tank with 3/4" shell in cold and wet condition is reconstructed t API 653 require welding to stop when the temp. of base metal is……. 73. When a lap welded patch plate is used to repair a tank shell away from the tank bottom, all corners shall have a min. radius of…… 74. Due to strength req. the min. thickness of annular plate ring is usually greater than…..