Report Base on Tower/Pole Foundation,

( SITE NAME : CHIRANJEEVVIHAR- VF RELOCATION)

( SITE ID : DL/DL/PR/7390)
Site Address:-

RAJESH KUMAR S/O RAJRAM SINGH Z-63 MAHENDRA ENCLAVE


CITIY GZB .9818874761

Client

M/s ATC- TELECOM TOWER CORPORATION PVT LTD


SITE NAME SITE ID TOWER HT. DATE

V.A.S DESIGN & INFRA CONSULTANTS PVT. LTD CHIRANJEEVVIH


AR- VF DL/DL/PR/7390 9M 10.01.2019
RELOCATION

DESIGN OF BASE PLATE AND ANCHOR BOLT


TOWER HT. DETAIL OF = 9 M
MAX. COMPRESSIVE FORCE = 18.0 KN
MAX. TENSIL FORCE = 15.1 KN
MAX SIDE THRUST = 4.5 KN
NO OF H. D. BOLTS PROPOSED = 4 NOS
AXIAL FORCES IN EACH BOLTS = 3.78 KN
SHEAR FORCE IN EACH BOLTS = 1.13 KN
GRADE OF CONCRETE IN PEDESTAL = 20.00 M

DESIGN OF ANCHOR BOLT


PERMISSIBLE STRESS FOR BOLTS OF PROPERTY CLASS OF 4.6 GRADE AS PER TABLE-1, IS:802 (PART-1/SEC-2)-1992

PERMISSBLE STRESS IN SHEAR = 218.00 N/mm^2


PERMISSBLE STRESS IN AXIAL TENSION = 194.00 N/mm^2
GROSS AREA OF THE BOLT REQD. = 27.03 mm^2
3.775/194X0.72
DIAMETER OF BOLT REQUIRED = 5.77 mm

DIAMETER OF BOLT PROVIDED = 16 mm


ACTUAL AXIAL STRESS IN EACH BOLT = 26.09 N/mm^2
ACTUAL AXIAL STRESS IN EACH BOLT 5.60 N/mm^2

CHECK FOR COMBINED STRESS 0.1774 < 1.2


26.09/218+5.6/194+5.6/194 Safe

PERMISSIBLE STRESS IN BOND IN = 0.8 N/mm^2


PLANE BAR AS PER TABLE-21 OF IS: 456: 2000

CAPACITY OF PLATE
LENGTH BREDTH THICKNESS
SIZE OF THE PLATE PROVIDED = 300 300 10
AREA OF PLATE'S TOP FACE = 90000 mm^2

PERMISSIBLE STRESS IN CONCRETE IN = 5 N/mm^2


BEARING ( AS PER IS 456-2000)
CAPACITY OF PLATE IN BEARING = 450000 N
WITH CONCRETE OR = 450 KN

GROUT LENGTH OF THE BOLT REQUIRED


= 62.1 mm
SITE NAME SITE ID TOWER HT. DATE

V.A.S DESIGN & INFRA CONSULTANTS PVT. LTD CHIRANJEEVVIH


AR- VF DL/DL/PR/7390 9M 10.01.2019
RELOCATION

MAX FOUNDATION FORCES ACTING ON BUILDING COLUMN:


Down Thrust = 18.00 KN
Side Thrust = 4.50 KN

Uplif = 15.10 KN
Side Thrust = 4.50 KN
DESIGN OF HILITY REBARING

Determination of Basic Anchorage Length :

Lb (reqd.) = (Ds/4)X(σst/fbd)

Where As
Ds = Diameter of Rebar
σst = Calculated Design Stress of Rebar
fbd = Design Value of ond strength

Assume Diameter of Rebar = 16 mm


Assume No of Bars = 4 mm
Calculated Design Stress of Rebar = 33.57 N/mm^2

Design value of bond strength = 1.9 N/mm^2 For 40mm Cover


As Per Hilty Manual

Lb (reqd.) = 71 mm

Lbd = ά1 x ά2 x ά3 x ά42 x ά5x Lbd(Reqd)


Where
ά1 = Effect of Form of the forms of Bars
ά2 = Effect of minimum Concrete cover
ά3 = Effect of Confinment of Transeverse Reinforcement

ά4 = Effect of infulence of one of more wleded Bars


along with Design Annchorage Length,
ά5 = Effect of Pressure Transverse to the Plane of
Splitting along with Design Anchorage Length

For compression = ά1 x ά2 x ά3 x ά4 = 1

Lbd (10xDs) = 70.6771943227052*1


lbd (min) 70.68 mm

Provide 100 mm depth for the Hilti Rebar with RE500 Compound (As per the site condition)
Horizontal Vertical Horizontal Moment
Node L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
10 6 DL+WL (X-DIR-REV-FACT) 165.383 383.133 12.014 0 0 0
7 DL+WL (X-DIR-FACT) -106.323 -173.874 115.946 0 0 0
8 DL+WL (Z-DIR-REV-FACT) -31.581 -243.102 -25.752 0 0 0
9 DL+WL (Z-DIR-FACT) 90.64 452.361 153.712 0 0 0
11 6 DL+WL (X-DIR-REV-FACT) -165.145 236.272 68.566 0 0 0
7 DL+WL (X-DIR-FACT) 106.153 -20.011 87.863 0 0 0
8 DL+WL (Z-DIR-REV-FACT) -76.336 160.242 63.615 0 0 0
9 DL+WL (Z-DIR-FACT) 17.343 56.02 92.814 0 0 0
12 6 DL+WL (X-DIR-REV-FACT) 0.417 -3.518 69.177 0 0 0
7 DL+WL (X-DIR-FACT) 0.527 98.061 -197.044 0 0 0
8 DL+WL (Z-DIR-REV-FACT) -1.447 10.664 15.816 0 0 0
9 DL+WL (Z-DIR-FACT) 2.391 83.879 -143.683 0 0 0
13 6 DL+WL (X-DIR-REV-FACT) -0.655 56.441 -38.757 0 0 0
7 DL+WL (X-DIR-FACT) -0.356 84.153 -117.765 0 0 0
8 DL+WL (Z-DIR-REV-FACT) -1.637 60.525 -53.679 0 0 0
9 DL+WL (Z-DIR-FACT) 0.626 80.069 -102.843 0 0 0

COMPRESSION = 452.36
TENSILE = 243.10
SHEAR = 197.04
165.4
-197.0
197.0

Maximum staad reactio

UPLIFT

243.10
Maximum staad reaction on pedestal (factored)

UPLIFT DOWNWORD SHEAR

243.10 452.36 197.04