Agenda of Presentation
 Points for Relay Configuration
 Operation from HMI
 Operation from PC Software
 Read Events
 Analysis of Disturbance record
 Generate PDF

April 19, 2019 Elcon Engineers Private Limited, Vadodara 2


Points for Relay Configuration:

 Date and Time

 CT/PT ratio

 Protection Settings

 Input

 Output

 Latch / non latch output

 Boolean Logics with AND, OR, NOT gates (if required)

 LED
April 19, 2019 Elcon Engineers Private Limited, Vadodara 3
Menu Content Table: HMI

April 19, 2019 Elcon Engineers Private Limited, 4


Vadodara
Menu Content Table: HMI (Continue..)

April 19, 2019 Elcon Engineers Private Limited, Vadodara 5


Menu Content Table : HMI (Continue..)

April 19, 2019 Elcon Engineers Private Limited, 6


Vadodara
Menu Content Table : HMI (Continue..)

April 19, 2019 Elcon Engineers Private Limited, Vadodara 7


Menu Content Table : HMI (Continue..)

April 19, 2019 Elcon Engineers Private Limited, Vadodara 8


Records
Event Record
 Capacity: 250 events

 Triggers: Any selected protection alarm and


threshold.
Logic input change of state
Setting changes
Self test events

April 19, 2019 Elcon Engineers Private Limited, Vadodara 9


Records
Fault Record
 Capacity: 25 faults

 Triggers: Any selected protection alarm and


threshold.

 Data: Fault date


Protection thresholds
Setting Group
AC inputs measurements (RMS)
Fault measurements

April 19, 2019 Elcon Engineers Private Limited, Vadodara 10


Records
Instantaneous Record
 Capacity: 5 starting informations (instantaneous)

 Triggers: Any selected protection alarm and


threshold

 Data : Date, Hour


origin (any protection alarm)
length (duration of the instantaneous trip
yes or no

April 19, 2019 Elcon Engineers Private Limited, Vadodara 11


Records
Disturbance Record
 Capacity: 5

 Triggers: Any selected protection alarm and threshold,


logic input, remote command

 Data : AC input channels


Digital input and output states
Frequency value

April 19, 2019 Elcon Engineers Private Limited, Vadodara 12


PC Software:
Schneider Electric Easergy Studio V7.1.0

April 19, 2019 Elcon Engineers Private Limited, Vadodara 13


Start Easergy Studio with NEW System

April 19, 2019 Elcon Engineers Private Limited, Vadodara 14


Name your NEW System

April 19, 2019 Elcon Engineers Private Limited, Vadodara 15


Create New Substation

April 19, 2019 Elcon Engineers Private Limited, 16


Vadodara
Name your New Substation

April 19, 2019 Elcon Engineers Private Limited, Vadodara 17


Quick Connect

April 19, 2019 Elcon Engineers Private Limited, Vadodara 18


Select a device type

April 19, 2019 Elcon Engineers Private Limited, Vadodara 19


Port selection

April 19, 2019 Elcon Engineers Private Limited, Vadodara 20


Connection Parameters

Select COM Port


Click on Finish

April 19, 2019 Elcon Engineers Private Limited, Vadodara 21


Name device type

Select COM Port


Click on Finish

April 19, 2019 Elcon Engineers Private Limited, Vadodara 22


Extract Settings, Events, Disturbance Records

 Right Click on ‘Settings’ folder


 Select ‘Extract Settings’
Select COM Port
Click on Finish
 Right Click on ‘Events’ folder
 Select ‘Extract Events’

 Right Click on ‘Disturbance


Records’ folder
 Select ‘Extract Disturbances’

April 19, 2019 Elcon Engineers Private Limited, Vadodara 23


Settings evaluation

April 19, 2019 Elcon Engineers Private Limited, Vadodara 24


Events evaluation

 Right Click on ‘Settings’ folder


 Select ‘Extract Settings’
Select COM Port
Click on Finish
 Right Click on ‘Events’ folder
 Select ‘Extract Events’

 Right Click on ‘Disturbance


Records’ folder
 Select ‘Extract Disturbances’

April 19, 2019 Elcon Engineers Private Limited, Vadodara 25


Disturbance Record evaluation

April 19, 2019 Elcon Engineers Private Limited, Vadodara 26


Generate PDF

 Select Required Data for PDF


 Click on ‘Print’ icon
 Select any virtual PDF generator

April 19, 2019 Elcon Engineers Private Limited, Vadodara 27


“ Ensuring Power System Reliability ”

Thanking you and Assuring for our best


services and co-operation at all the
times we remain

April 19, 2019 Elcon Engineers Private Limited, Vadodara 28

You might also like