Project: Two Storeys Residential House

Subject: Cost Estimate Breakdown


Owner:
Location:
Date:

Work Description Quantity Unit Cost Amount Total Amount

I. Mobilization/Clearing
a. Clearing
b. Mobilization
II. Earthworks
a. Excavation
o Column Footings
o Wall Footings
o Septic Tank
b. Filling Materials
c. Gravel Fill
III. Concrete Works
a. Column Footings
b. Wall Footings
c. Columns
d. Beams
e. Slabs
f. Others
IV. Reinforcing Steel Bars
a. Column Footings
b. Wall Footings
c. Column
d. Beams
e. Slabs
f. Horizontal and Vertical
Bars
g. Others

V. Forms and Scaffolding


VI. Masonry Works
a. 6” CHB
b. 4” CHB
VII. Roof Framing Works
VIII. Roofing Works
a. Pre-painted Roofing
b. Ridge Roll
c. Valley Gutter
d. Facia
e. Insulation
f. Accessories and Others
IX. Carpentry Works
a. Ceiling (Interior)
b. Ceiling Eaves
c. Built-In Cabinet
d. Stairs
X. Doors and Windows
a. Doors
i. Double Molded
Type (Solid)

ii. Molded
Type (Solid)
iii. Molded Type
(Flush)

iv. PVC Door


v. Aluminum
Sliding Door

b. Windows
i. Windows with
Grilles

XI. Tile Works

a. Living, Dining
and Family Room (0.60 x
0.60 Tiles)

b. Bedroom and Music


Room (0.60 x 0.60 Tiles/
Laminated Wooden Planks)
c. Patio/Balcony (0.40 x
0.40 Tiles)
d. Toilets, Maid’s Room
and Laundry Area (0.30
x 0.30 Tiles)
e. Kitchen Counter, Nook
And Masters Toilet
Counter (Granite)

XII. Plumbing Works

a. Rough-Ins
b. Fixtures

XIII. Electrical Works

a. Rough-Ins

b. Wirings

c. Breaker

d. Devices

XIV. Painting Works

Total Contract Amount: