You are on page 1of 33

DESIGN – ANALYSIS OF TEMPORARY STAGING

FOR
BR #231
INDEX

Sl No. Description
1 Subsoil Investigation Report
2 Lateral Soil Spring Stiffness Calculation
3 Stream Force Calculation
4 STAAD.Pro Analysis Report
5 MS Pipe Embedment Depth Calculation
6 Structural Drawing
1-
'
' Construction of Dual Gauge Double Rail line and Conversion of Existing Rail line into Dual Gauge between
Akhaura - Laksam
SASEC Railway Connectivity

Contractor: CTM Joint Venture, Consultant: DOHWA-KRNA-OCG-BARSYL-DDC Joint Venture,

SUB-SOIL INVESTIGATION : ON LAND

/39rfg? o Zl
. Borehoie No

F 997/D Coordinate of Borehole

Z'.O/-
3oring Method Used cnui'ug. /s9i*?aVq
eivvuruii.uurtnit - Zj7n1
:

EYIS&;
24 hour) EL

4 -' W7idt6re7,t
'mzd.arq 6rc1 dna-
a .l{ l2o 6 /g
.... - I :

(' /J
/a A5
-4DND

/id g--- il ,q ei /7zadi'\70 6 re7 e


-J-9Ni>.

qru d t-Lvl T
Sub Contractor
Representative.
Contractor

ffi,n
{:

' . Constructicn of Dual Gauge Double Rail line and Conversion of Existing Rail line into Dual Gauge between
Akhaura - Laksam
SASEC Railway Connectivity

- Consultant: DOHWA'KRNA'OCG'BARSYL'DDC Joint Venture.


Contractor: CTM Joint Venture'

SUB.SOIL INVESTIGATION : ON LAND

/3gf ,5?, o 71 Boreicle No :.gqt/Ufi/rt)n-uuin/ ur t/us/


_,:,
Cooi'dinate of Borehole '

)ecth oi Bciehcle :ZO-._f ry

Zfin:P'7or4t >t".rt
dctdazt- /a1pt ,

t'ffJ'*:rot D..ji' "Depth Strata


150 1s0 is. 300 I-]T strara Descripricn or so l

.rj lii ;; T, ; 3;
I

gryf*n;nz
5'P/ J/n*l i
/t

-rJ /P.o t3 rd' 2-5 4t


5l ,r t f 9 zo Z9 e/ay*w,,*t, j//t

/..
lJ 2zl0 r(J
tc7.c,/ /a la
lo t3
tJ z?
'L3 mzdt"- ,?.7-q/4
ti-

.. -
- J'?ND atrlt nv'Cd
I

I
I

A b ' d - | -- '- ,. "


*10nPza ncsitgt-i
I

"-1 A
,t'( uffr
I

- |

I
..al

-ry 27;A t, 2t zS 4( Dan'z 5re7 //@


- IDND' - I
j
l' i

ladsa 6R/ 1tr n-a-


I

,529'f14f9-.',#,,ri
--i--
I-' ' 3/-9Nu
-
|

i
i

4*'
Sub Contractor
Fepresentative.
IRrt"xwrrTV*
-
.,-- S
6;*;10' --
Representative
'

ffi
r"-
-
. Construction cf Dual Gauge Double Rail line and Conversion of Existing Rail line into Dual Gauge between
Akhaura - Laksam
SASEC Railway Connectivity

i Tontraclor: CTM Joint Venture. Consultant: DOHWA-KRNA'OCG'BAnSil'OOC Joint Venture'

SUB-SOIL INVESTIGATION : ON LAND

/3 9t- 5r9"o'7{ Borehole No

5-. 7 r, Coor0rrate of Borehole


"9 D:pth cf Sci'ehole

Z\frrD FtToo g$+i


l.fiael kWt,
Blow Count SFI j-.':"re ' Change of
SL Sample Type Depth- Iorque
Strata Depth Description of Soil Strata
Nio and No (m) 150 150 150 3'"'C Kg-cm
(m)
mm mm mm :':r, -IA{e 6k7c/a/a/
^l(
,'---#
3i5 ,4 5_ f lo _,_ J-Y,/2,
;i
+ is
/_J 3SA ?")-- 5 4 loft GreYCt,'/+7 "

(/,,+y,
,A)
^4 4<" H5 to /J 3/ 14 PTEa 4re7 /ixa-
-64rvD ,

.l c' 34'o / 3 4a Hard 64/arA7


C/47.

2' ,j w,5 20 41 6 I \ ovazr,/


/iard qryidry
(/,97,
I /raTd EkTsnd/

4'-I
L-1 4( 4t 27 5o

4=e! T.lq\--L[ rr
Sub Contractcr
Representative. Representative, e's. Ma*Affd'm.i,hr*;
Senior lnspectioir & Testing $peciatrst
ALDLP of Bangladesh RailvraY
a\

Construction of Dual Gauge Double Rail line and Conversion of Existing Rail line into
Dual Gauge betweeni
Akhaura - Laksam
SASEC Railway ConnectivitY

Contractor: CTM Joint Venture. Consultant: DOHWA'KRNA'0CG'BARSYL'DDC Joint Venture

SUB-SOIL INVESTIGATION I ON LAND

'". /39+5v4'339
*--*:--22=d/-i7 4a'5ry
d; Depth of Borehole

Date---:. a4a7-7 9::g9I:l'l_t':L!1LI --'


".

chainaoe /'3-
Boring Method Used :
91Ms_.___ - - --!-Z']-JZ
BH Water Level(RL)
"
. ?'bn
24hour) 't, r51r61hez tzv<-/'

of
'-1il --- *:,t]lT
Blow Count SPT N-Value Change i
cl Sample Type Depth Strata bepm i Description of Soil Strata
(m) 150 150 150 300 Kg-cm
- ,--
No and No.
mm mm mm l:--*jtftaroao-a1ry-
(m)

"tJ t"5 7 3TT--

L -IJ :3'o l:LZ I

L I
'V- IJ g,o ,. K 24 23 47
IJ ld.t g', 14 /€:92

$ :
/z'o ', lz ' z/ 23:41
lJ :/it' 9 li

IJ /t"o 7 5al tYll&tay guaWD-*

-Ti-;L^Lq \?
4b!uo-ot-t+ Enqr. ffid Abdul MonaYtm-
Sub Contractor Sen ior lnspefi 0{t& shh! S0eciaitst

Representative. Representative. A LD Lfi? BtiiPfi HH Rf i r


"tv
Construction of Dual Gauge Double Rail line and Conversion of Existing Rail line into Dual Gauge between
Akhaura - Laksam
SASEC Railway Con nectivity

I Consultant: HWA'KRNA'0CG'BARSYL'DDC Joint Venture


// Contractor: CTM Joint Venture. DO

SUB-SOIL INVESTIGATI0N : ON LAND

of Borehole 40 ,rD
water Level(RL) ,' ffi
rr'7d. 33?

Blow Count . SPt tt-Vatue Change of i


SL Sample Type Torque
Strata Depth Description of Soil Strata
150
:

150 150 300 Kgcm


No. and No. (m)
mm mm mm mmr
--// -/s' //f I ra /4

r/- 5J

tj , /2'f i{ zr - -rs 3,
tJ ,2r lo lz /L

, tt /3

5J t24'o i

?1!. f i E t/z
4z1a/'

"o7

frfrf>oW
ru"-ot-'tr
Sub Contractor
lO. AnOut MonaYem

Representative.
Construction of Dual Gauge Double Rail line and Conversion of Existing Rail line into Dual Gauge between
Akhaura - Laksam
SASEC Railway Conhectivity

Contractor: CTM Joint Venture. Consultant: DO HWA'KRNA'OCG'BARSYL'DDC Joint Venture

SUB-SOIL INVESTIGATION : ON LAND

l, , t39+576'
RL ',:
5. i?o4 "3?
Depth of Borehole 4c';rl
Water Level (RL) :

l-rsg rg 7 4" 339


Water Level (RL) -z_ RTO{'
24 hour) ep lewl'
Blow Count , SPt ru-Vatue Change of i
et Sample Type
150
:
300
lOrque
1n^ ,I t,- ^* Strata DePth i
i Description of Soil $kata
No. and No. (m) 150 150 Kg+m
mm mm mm -_-=.--
mml (m)

2t 5J 3/5 2- 3
tC ,!2

JJ 360 23 36 /4

is ',37's L2- ' 5e

/J 3l '5b
+

405 22- 5o

4EPt-'
{-i-or' z'4u1'
.24*ol-lT
Sub Contractor
ffiem
senPffi$fffi
li r
r!! Snetiai ist
Representative. rriil''"' '
ALDTP'of Sangta':e5n
:1" Cormtruction of Dual Gauge Double Rail line and Conversion of Existing Rail line into Dual Gauge between
Akhaura - Laksam'
SASEC Railway Connectivity

Contractor: CTM Joint Venture. Consultant: DOHWA-KRNA.OCG.BARSYL'DDC Joint Venture

SUB-SOIL INVESTIGATION : ON LAND


t,:139+{/V' No.

'. 2?-O/'17 of Borehole 'z,or,


Date ,,', 3/-A/'- Water Level (RL) :

Chainage :- /ag +ii7'4P


Fr7ar4 €r6ltry
BH Water Level (RL)
(After 24 hour)
t 2'970
jt/dae? Zev</

BIow Count SPT N-Value Change of


SL Sample Type Depth Torque
Skata Depth Description of Soil Strata
No. and No. (m) 150 150 150 300 Kg-cm
(m)
I mm mm mm mm

I 33 /"5 2 2 2_

,3'O I .2 7 3

tt €'o O ./ -7 L l

(? ,9'o 4 ld /4 26

9 // t/2'o,4 g 70',7?

/s0 /4 /v

br- oL '*tt-
Sub Contractor En g r. IVlQhilS[cilMon aYem
Representative. Sen io r lfr$86f; tf Btd$lFg i', e; ;;"t
ALDLP of Bangtariesh Ratlv'raY
Construction of Dual Gauge Double Rail line and Conversion of Existing Rail line into
Dual Gauge between
Akhaura - Laksam
/, SASEC Railway Connectivity

Contractor: CTM Joint Venture. consu ltant: DoHWA-KRNA-ocG-BARSyL-DDc Joi nt Venture.

SUB-SOIL INVESTIGAT|ON : ON LAND


t39 f (/7. 44s Borehole No.
SurfaceRL "f S O OO Coordinate of Borehole
Start Date 2-9 'C/'/ Deptir rf Bcrehole
4i.a-o
/39 +6/7.449
Waler Level (RL) Z-.97ra F/7c.D ,* -tlizt*
v
(Afler 24 hour) it?hea /a v< / '
Blow Count SPT N-Value
St Sample Type Depth -rorque Chanoe of
No, and No, (m) 150 150 lEn
300 Strala Leoth Description of Soil St.ala
mm mm rnm mm
"
KO-CM
(m)
1t 3S //f g /3 /9 32_ knJ? g7elJn
mdl|'vD SAND
t2 tr /9.O /t /3 4zv /ZzoLvvo fircfin<
c,0N2"
/?f /L /s: /v 32 2<ry26k7 /;nz-
5,qN2.
2to 5 6 E /f .,/tflrys,rg,
"eay
asf g /9 23 4L Dznjz //*l/
/,nognIua'
t/ Zi,o A o a SzroPlz n;ismV
/7 uO 25*265 -
/5a .lJ q'a 4 4 4 I -ru2-qry-//*
-lavo.
?9f v 7 7
2a t/ So.b lt ib /4 24 mzdbt ry 6VzwrJ
jlhZgEluD,

<be,
Sub Contractor Contractor
Representative. 'epresentative Enq; MEeAffiTAIiEnaYem
Sen'ilr tffietmB'ffi
trE Sneciaiist
RailvvaY
AL0LF of Banglarle$h
4
f: Construction of Dual Gauge Double Rail line and Conversion of Existing Rail line into Dual Gauge between
L Akhaura - l-aksam
SASEC Railway Connectivity

Contractor: CTM Joint Venture. Consultant: DOHWA-KRNA.0CG-BARSYL-DDC Joint Venture

SUB-SOIL INVESTIGATI0N : ON LAND

/39+6/7' Borehole No.

RL : 5.J'oa4
Depth of Borehole ,., ?2,o r-,)
:tion Date , 3l-rO /'/ 7 Ground Water Level (RL) '

na.tnoJu-r.l--VOz"*7-
9!:rr:__ /P+6/7-4?9
B i vv,;al' * t tii D r-ro r@DZ-xuV*r6r
24hour) flf/ao kwt "

-z
Sample Type Depth
Blow Count SPT N-Value
torque
Changeof i

and No. (m) 150 150 150 300 Kg-cm


Skata Depth i Description of Soil Strata

mm mm nnm mm
(m)
-- 4--Z
3s s/ s , /Z

Z/, { /z_

iSqs /8 3D /f 45
34'a 4 4
's7f 2b ?-g

4 '-::r--_!_-5"Gw-:
;{os 'ze 35 , &rf 5t
ar/
LS 4sv

Qs,6' 7-'O : Lfrt


Sub Contractor
Representative.
Construction of DualGauge Double Railline and Conversion of Eiisting
Railline into Dual Gauge between
Akhaura - Laksam
SASEC Railway ConnectivitY

Contractor: CTM Joint Venture. Consultant: DoHWA.KRNA.oCG.BARSYL.DDc Joint Venture

SUB-SOIL INVESTIGATION : ON LAND

Depth of Borehole

ainase
lll.:--
igI3l'i !:':i €
'.-/gg473ry"V74
1

fr,o- -+
"5e
BHGilL*W:
ii+l..rrl
' ' :ZgeP
C{nfucq lew/-
',',:
nrt

Blow Count , SPt N-Vatue Change of i

SL Sample TyPe , DePth Torque


Strata DePth i Description of Soil Strata
300
No, and No. ; (m) 150 150 150
mm'
Kg-cm
mm mm mm

I SS /,J- 7

19'o L

2 95
u.o 5-6

4 77
iii'j
lz
'f t, - Uanv d''tb e/tY
i2v
lg i/5,,/9,,37
/f.O ' tS /9 /? 3g

fiJstu' ff{r-Lotb-
Consultant
Sub Contractor Eng r. llfidp&bduhfilonayem
Representative.
Senio, lnsoer:tron E Testing Specjalist

AL0LP oi Earrgiao*sn fiaili,vay


I Construction of Dual Gauge Double Rail line and Conversion of Existing Rail line into Dual Gauge between
Akhaura - Laksam
SASEC Railway Connectivity

Contractor: CTM Joint Venture. Consultant: DOHWA-KRNA.0CG'BARSYL'DDC Joint Venture

SUB-SOIL INVESTIGATION : ON LAND

No.

of Borehole :::
of Borehole '' JZ O
d Water Level (RL) :

BH Water Level (RL)


(After 24 hour) Le\,A/
il Blow Count . SPT tt-Vatue Change of
i Depth ___.-_:_*=. I
j
l

lT1H ,i#L.n*
SL Sample Typa I
Description of Soil Skata
rEn
V No. and No. , (m) 150 IJU
(m)
I

,
mm mm mm

iJ 'u5
l

tt
i

lL t/ :/9 A 7 2_2_1
4 "./?5 -/ 34 v

/r
l

,)
22f 3 i I 7 /Z
u ,21'0'3 3

2J-a I '2 2 ,7 .

/4 Zo

,30'o (0 t3 /7
j) /*'

qru" ^.
firy-"4^1
L0v
Sub Contractor \* Contractor
Engr.
Representative. : Representative.
Senior I

ALDLP ol Banglauesh Rari',,r;y


V Construction of Dual Gauge Double Rail line and Conversion of Existing Rail line into DualGauge between
Akhaura - Laksam
SASEC Railway Con nectivity

Contractor: CTM Joint Venture. Consultant: DO HWA'KRNA'OCG'BARSYL'DDC Joint Venture

SUB-SOIL INVESTIGATION : ON LAND

No.

Depth of Borehole

Ground Water Level (RL) :

Lever(RL) o
Water
er24 hour) eq
'JhJArf tp:,<t,
Blow Count SPT N-Value
SL $ample Type Depth lorque Description of Soil Strata
skata 6eoth
No. and No. (m) 150 150 150 Kg-cm (m)
i

mm mm mm

2t 5J 3rf o 96
,/

42- /J :33 A 7///o 2l


t/ o /0
"94,J

36.0 23
,fvs 21 , 15 :5:
,24

4 Ir

b6 ,bd itq
t, 75 5 so

Sub Contractor w ffiu'64-


Representative.
Enqnd$Su&hffi$onaYem
Senio, lnipection &'lesttng Specialist

ALDLP of Bangtaoeth RaiiwaY


Lateral Soil Spring Stiffness Calculation

The initial stiffness, KH, of an individual soil spring located at depth z is given as,
KH = 2.0 * t * Es
where
t = thickness of the soil layer represented by the spring, in
Es = Young’s modulus for soil at depth z, lbf/in²
The soil spring stiffness values are calculated at 1.5 meter interval upto the depth of embedment as per the subsoil
investigation report,

Increase in Young's
Depth from River Bed, Z Young's Modulus for Modulus for Initial Stiffness, KH
Thickness of Layer, t (in)
(ft) Cohesive Soil, Es Cohesionless Soil, AE (kN/m)
(lbf/in²) (lbf/in²/ft)
59 4.92 3920 80948
59 9.84 3920 80948
59 14.76 440 134109.36
59 19.68 440 178812.48
59 24.6 440 223515.6
59 29.52 440 268218.72
59 34.44 660 469382.76
Local Scour

Laursen's Method

Average Depth of Flow YAV = 3.3000 m


Width of MS pipe at stream bed b = 0.5000 m
Ratio = YAV / b R = 6.6000
Ratio S = 7.0000
Depth of Local Scour DSL = 3.5000 m
Direction of stream velocity β = 45 º
Length of pile at stream bed L = 1.0000 m
Ratio L/b = 2.0000
Laursen's Correction Factor C = 1.3
Corrected Depth of Local Scour DCSL = 4.5500 m

Stream Pressure Calculation

Stream velocity VS = 1.5000 m/s


Constant for circular MS pipe k = 1.0000
Height of Pressure triangle H = 7.8500 m

Stream Pressure

P avg = K * (V avg ) 2
where
P avg = average steam pressure, in pounds per squre foot
V avg = average velocity of water in feet per second

when
P avg = average steam pressure, in kN per squre meter
V avg = average velocity of water in meter per second

then
P avg = 0.5148 * K * (V avg ) 2
2
P1 = 0.5148 * 1 * 4.2 = 2.18422 kN/m

Stream force acting on MS pipe = 1.092 kN/m


Job No Sheet No Rev
1
Part
Software licensed to
Job Title DESIGN - ANALYSIS OF TRMPORARY STAGING FOR BR_231 Ref

By UDAYAN Date 2-Aug-18 Chd

Client MAX INFRASTRUCTURE LTD. File Date/Time 02-Aug-2018 10:43


staging_modified2_with_soil_spring.std

Job Information
Engineer Checked Approved

Name: UDAYAN
Date: 30-Jul-18

Project ID
Project Name

Structure Type SPACE FRAME

Number of Nodes 130 Highest Node 209


Number of Elements 175 Highest Beam 287

Number of Basic Load Cases 2


Number of Combination Load Cases 1

Included in this printout are data for:


All The Whole Structure

Included in this printout are results for load cases:


Type L/C Name

Primary 1 DEAD LOAD


Primary 2 LIVE LOAD
Combination 3 COMBINATION LOAD CASE 3

Section Properties
Prop Section Area Iyy Izz J Material
(in2) (in4) (in4) (in4)
1 PIPE 23.860 1.11E+3 1.11E+3 2.22E+3 STEEL
2 Taper 25.370 309.129 909.354 3.704 STEEL

Supports
Node X Y Z rX rY rZ
(kip/in) (kip/in) (kip/in) (kip-ft/deg) (kip-ft/deg) (kip-ft/deg)
1 Fixed Fixed Fixed - - -
3 Fixed Fixed Fixed - - -
7 Fixed Fixed Fixed - - -
9 Fixed Fixed Fixed - - -
13 Fixed Fixed Fixed - - -
15 Fixed Fixed Fixed - - -
19 Fixed Fixed Fixed - - -
21 Fixed Fixed Fixed - - -
25 Fixed Fixed Fixed - - -

Print Time/Date: 02/08/2018 10:55 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 1 of 9
Job No Sheet No Rev
2
Part
Software licensed to
Job Title DESIGN - ANALYSIS OF TRMPORARY STAGING FOR BR_231 Ref

By UDAYAN Date 2-Aug-18 Chd

Client MAX INFRASTRUCTURE LTD. File Date/Time 02-Aug-2018 10:43


staging_modified2_with_soil_spring.std

Supports Cont...
Node X Y Z rX rY rZ
(kip/in) (kip/in) (kip/in) (kip-ft/deg) (kip-ft/deg) (kip-ft/deg)
37 Fixed Fixed Fixed - - -
39 Fixed Fixed Fixed - - -
128 - - 1.02E+3 - - -
129 - - 1.28E+3 - - -
130 - - 1.53E+3 - - -
131 - - 2.68E+3 - - -
134 - - 1.02E+3 - - -
135 - - 1.28E+3 - - -
136 - - 1.53E+3 - - -
137 - - 2.68E+3 - - -
140 - - 1.02E+3 - - -
141 - - 1.28E+3 - - -
142 - - 1.53E+3 - - -
143 - - 2.68E+3 - - -
146 - - 1.02E+3 - - -
147 - - 1.28E+3 - - -
148 - - 1.53E+3 - - -
149 - - 2.68E+3 - - -
152 - - 1.02E+3 - - -
153 - - 1.28E+3 - - -
154 - - 1.53E+3 - - -
155 - - 2.68E+3 - - -
158 - - 1.02E+3 - - -
159 - - 1.28E+3 - - -
160 - - 1.53E+3 - - -
161 - - 2.68E+3 - - -
164 - - 1.02E+3 - - -
165 - - 1.28E+3 - - -
166 - - 1.53E+3 - - -
167 - - 2.68E+3 - - -
170 - - 1.02E+3 - - -
171 - - 1.28E+3 - - -
172 - - 1.53E+3 - - -
173 - - 2.68E+3 - - -
176 - - 1.02E+3 - - -
177 - - 1.28E+3 - - -
178 - - 1.53E+3 - - -
179 - - 2.68E+3 - - -
182 - - 1.02E+3 - - -
183 - - 1.28E+3 - - -
184 - - 1.53E+3 - - -
185 - - 2.68E+3 - - -
188 - - 1.02E+3 - - -
189 - - 1.28E+3 - - -
190 - - 1.53E+3 - - -

Print Time/Date: 02/08/2018 10:55 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 2 of 9
Job No Sheet No Rev
3
Part
Software licensed to
Job Title DESIGN - ANALYSIS OF TRMPORARY STAGING FOR BR_231 Ref

By UDAYAN Date 2-Aug-18 Chd

Client MAX INFRASTRUCTURE LTD. File Date/Time 02-Aug-2018 10:43


staging_modified2_with_soil_spring.std

Supports Cont...
Node X Y Z rX rY rZ
(kip/in) (kip/in) (kip/in) (kip-ft/deg) (kip-ft/deg) (kip-ft/deg)
191 - - 2.68E+3 - - -
194 - - 1.02E+3 - - -
195 - - 1.28E+3 - - -
196 - - 1.53E+3 - - -
197 - - 2.68E+3 - - -
200 - - 1.02E+3 - - -
201 - - 1.28E+3 - - -
202 - - 1.53E+3 - - -
203 - - 2.68E+3 - - -
206 - - 1.02E+3 - - -
207 - - 1.28E+3 - - -
208 - - 1.53E+3 - - -
209 - - 2.68E+3 - - -

Y
X
Z

Print Time/Date: 02/08/2018 10:55 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 3 of 9
Job No Sheet No Rev
4
Part
Software licensed to
Job Title DESIGN - ANALYSIS OF TRMPORARY STAGING FOR BR_231 Ref

By UDAYAN Date 2-Aug-18 Chd

Client MAX INFRASTRUCTURE LTD. File Date/Time 02-Aug-2018 10:43


staging_modified2_with_soil_spring.std

Primary Load Cases


Number Name Type

1 DEAD LOAD None


2 LIVE LOAD None

1 DEAD LOAD
Selfweight
Direction Factor Assigned Geometry

Y -1.000 ALL

Floor Load
Direction Pressure Member Group
kN/m2
GY -0.007929 STAGING

2 LIVE LOAD : Beam Loads


Beam Type Direction Fa Da Fb Db Ecc.
(m) (m)
66 TRAP kN/m GZ -1.092 1.100 0.000 7.800 -
67 TRAP kN/m GZ -1.092 1.100 0.000 7.800 -
68 TRAP kN/m GZ -1.092 1.100 0.000 7.800 -
69 TRAP kN/m GZ -1.092 1.100 0.000 7.800 -
70 TRAP kN/m GZ -1.092 1.100 0.000 7.800 -
71 TRAP kN/m GZ -1.092 1.100 0.000 7.800 -
72 TRAP kN/m GZ -1.092 1.100 0.000 7.800 -
132 TRAP kN/m GZ -1.092 1.100 0.000 7.800 -
133 TRAP kN/m GZ -1.092 1.100 0.000 7.800 -
134 TRAP kN/m GZ -1.092 1.100 0.000 7.800 -
135 TRAP kN/m GZ -1.092 1.100 0.000 7.800 -
136 TRAP kN/m GZ -1.092 1.100 0.000 7.800 -
137 TRAP kN/m GZ -1.092 1.100 0.000 7.800 -
138 TRAP kN/m GZ -1.092 1.100 0.000 7.800 -

Floor Load
Direction Pressure Member Group
kN/m2
GY -4.788 STAGING

Print Time/Date: 02/08/2018 10:55 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 4 of 9
Job No Sheet No Rev
5
Part
Software licensed to
Job Title DESIGN - ANALYSIS OF TRMPORARY STAGING FOR BR_231 Ref

By UDAYAN Date 2-Aug-18 Chd

Client MAX INFRASTRUCTURE LTD. File Date/Time 02-Aug-2018 10:43


staging_modified2_with_soil_spring.std

Combination Load Cases


Comb. Combination L/C Name Primary Primary L/C Name Factor

3 COMBINATION LOAD CASE 3 1 DEAD LOAD 1.20


2 LIVE LOAD 1.60

Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kN-m) (kN-m) (kN-m)
Max FX 9 3:COMBINATION LOAD CASE 262.630
0.437 3 0.447 0.000 0.000 0.000
Min FX 33 3:COMBINATION LOAD CASE 262.633
-0.438 3 0.447 0.000 0.000 0.000
Max FY 25 3:COMBINATION LOAD CASE 308.975
0.106 3 0.744 0.000 0.000 0.000
Min FY 128 1:DEAD LOAD 0.000 0.000 3.224 0.000 0.000 0.000
Max FZ 128 3:COMBINATION LOAD CASE 3 0.000
0.000 59.461 0.000 0.000 0.000
Min FZ 170 3:COMBINATION LOAD CASE 3 0.000
0.000 -25.166 0.000 0.000 0.000
Max MX 1 1:DEAD LOAD 0.140 33.313 0.103 0.000 0.000 0.000
Min MX 1 1:DEAD LOAD 0.140 33.313 0.103 0.000 0.000 0.000
Max MY 1 1:DEAD LOAD 0.140 33.313 0.103 0.000 0.000 0.000
Min MY 1 1:DEAD LOAD 0.140 33.313 0.103 0.000 0.000 0.000
Max MZ 1 1:DEAD LOAD 0.140 33.313 0.103 0.000 0.000 0.000
Min MZ 1 1:DEAD LOAD 0.140 33.313 0.103 0.000 0.000 0.000

Utilization Ratio
Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (in2) (in4) (in4) (in4)
1 Taper Taper 0.606 1.000 0.606 AISC- H1-3 3 25.370 909.362 309.131 3.704
3 PIPE PIPE 0.571 1.000 0.571 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
5 PIPE PIPE 0.521 1.000 0.521 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
6 Taper Taper 0.041 1.000 0.041 AISC- H2-1 3 25.370 909.362 309.131 3.704
8 PIPE PIPE 0.105 1.000 0.105 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
10 PIPE PIPE 0.038 1.000 0.038 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
11 Taper Taper 0.041 1.000 0.041 AISC- H1-3 3 25.370 909.362 309.131 3.704
13 PIPE PIPE 0.105 1.000 0.105 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
15 PIPE PIPE 0.038 1.000 0.038 AISC- H1-3 1 23.860 1.11E+3 1.11E+3 2.22E+3
16 Taper Taper 0.041 1.000 0.041 AISC- H1-3 3 25.370 909.362 309.131 3.704
18 PIPE PIPE 0.106 1.000 0.106 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
20 PIPE PIPE 0.038 1.000 0.038 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
21 Taper Taper 0.041 1.000 0.041 AISC- H1-3 3 25.370 909.362 309.131 3.704
23 PIPE PIPE 0.105 1.000 0.105 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
25 PIPE PIPE 0.038 1.000 0.038 AISC- H1-3 1 23.860 1.11E+3 1.11E+3 2.22E+3
26 Taper Taper 0.041 1.000 0.041 AISC- H2-1 3 25.370 909.362 309.131 3.704
28 PIPE PIPE 0.105 1.000 0.105 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
30 PIPE PIPE 0.038 1.000 0.038 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
31 Taper Taper 0.606 1.000 0.606 AISC- H1-3 3 25.370 909.362 309.131 3.704

Print Time/Date: 02/08/2018 10:55 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 5 of 9
Job No Sheet No Rev
6
Part
Software licensed to
Job Title DESIGN - ANALYSIS OF TRMPORARY STAGING FOR BR_231 Ref

By UDAYAN Date 2-Aug-18 Chd

Client MAX INFRASTRUCTURE LTD. File Date/Time 02-Aug-2018 10:43


staging_modified2_with_soil_spring.std

Utilization Ratio Cont...


Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (in2) (in4) (in4) (in4)
33 PIPE PIPE 0.571 1.000 0.571 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
35 PIPE PIPE 0.521 1.000 0.521 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
36 Taper Taper 0.103 1.000 0.103 AISC- H2-1 3 25.370 909.362 309.131 3.704
37 Taper Taper 0.095 1.000 0.095 SHEAR -Y 3 25.370 909.362 309.131 3.704
38 Taper Taper 0.121 1.000 0.121 AISC- H2-1 3 25.370 909.362 309.131 3.704
39 Taper Taper 0.106 1.000 0.106 AISC- H2-1 3 25.370 909.362 309.131 3.704
40 Taper Taper 0.116 1.000 0.116 AISC- H2-1 3 25.370 909.362 309.131 3.704
41 Taper Taper 0.103 1.000 0.103 AISC- H2-1 3 25.370 909.362 309.131 3.704
48 Taper Taper 0.127 1.000 0.127 AISC- H2-1 3 25.370 909.362 309.131 3.704
49 Taper Taper 0.095 1.000 0.095 SHEAR -Y 3 25.370 909.362 309.131 3.704
50 Taper Taper 0.101 1.000 0.101 AISC- H2-1 3 25.370 909.362 309.131 3.704
51 Taper Taper 0.093 1.000 0.093 AISC- H2-1 3 25.370 909.362 309.131 3.704
52 Taper Taper 0.100 1.000 0.100 AISC- H2-1 3 25.370 909.362 309.131 3.704
53 Taper Taper 0.083 1.000 0.083 AISC- H2-1 3 25.370 909.362 309.131 3.704
54 Taper Taper 0.119 1.000 0.119 SHEAR -Y 3 25.370 909.362 309.131 3.704
55 Taper Taper 0.103 1.000 0.103 AISC- H2-1 3 25.370 909.362 309.131 3.704
56 Taper Taper 0.152 1.000 0.152 SHEAR -Y 3 25.370 909.362 309.131 3.704
57 Taper Taper 0.116 1.000 0.116 AISC- H2-1 3 25.370 909.362 309.131 3.704
58 Taper Taper 0.175 1.000 0.175 SHEAR -Y 3 25.370 909.362 309.131 3.704
59 Taper Taper 0.106 1.000 0.106 AISC- H2-1 3 25.370 909.362 309.131 3.704
60 Taper Taper 0.162 1.000 0.162 SHEAR -Y 3 25.370 909.362 309.131 3.704
61 Taper Taper 0.121 1.000 0.121 AISC- H2-1 3 25.370 909.362 309.131 3.704
62 Taper Taper 0.184 1.000 0.184 SHEAR -Y 3 25.370 909.362 309.131 3.704
63 Taper Taper 0.095 1.000 0.095 SHEAR -Y 3 25.370 909.362 309.131 3.704
64 Taper Taper 0.119 1.000 0.119 SHEAR -Y 3 25.370 909.362 309.131 3.704
65 Taper Taper 0.103 1.000 0.103 AISC- H2-1 3 25.370 909.362 309.131 3.704
66 PIPE PIPE 0.446 1.000 0.446 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
67 PIPE PIPE 0.226 1.000 0.226 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
68 PIPE PIPE 0.237 1.000 0.237 AISC- H1-1 3 23.860 1.11E+3 1.11E+3 2.22E+3
69 PIPE PIPE 0.240 1.000 0.240 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
70 PIPE PIPE 0.237 1.000 0.237 AISC- H1-1 3 23.860 1.11E+3 1.11E+3 2.22E+3
71 PIPE PIPE 0.226 1.000 0.226 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
72 PIPE PIPE 0.446 1.000 0.446 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
73 Taper Taper 0.206 1.000 0.206 AISC- H1-3 3 25.370 909.362 309.131 3.704
74 Taper Taper 0.145 1.000 0.145 AISC- H1-3 3 25.370 909.362 309.131 3.704
75 Taper Taper 0.117 1.000 0.117 AISC- H1-3 3 25.370 909.362 309.131 3.704
76 Taper Taper 0.155 1.000 0.155 AISC- H1-3 3 25.370 909.362 309.131 3.704
77 Taper Taper 0.159 1.000 0.159 AISC- H1-3 3 25.370 909.362 309.131 3.704
78 Taper Taper 0.144 1.000 0.144 AISC- H1-3 3 25.370 909.362 309.131 3.704
79 Taper Taper 0.144 1.000 0.144 AISC- H1-3 3 25.370 909.362 309.131 3.704
80 Taper Taper 0.159 1.000 0.159 AISC- H1-3 3 25.370 909.362 309.131 3.704
81 Taper Taper 0.155 1.000 0.155 AISC- H1-3 3 25.370 909.362 309.131 3.704
82 Taper Taper 0.117 1.000 0.117 AISC- H1-3 3 25.370 909.362 309.131 3.704
83 Taper Taper 0.145 1.000 0.145 AISC- H1-3 3 25.370 909.362 309.131 3.704
84 Taper Taper 0.206 1.000 0.206 AISC- H1-3 3 25.370 909.362 309.131 3.704

Print Time/Date: 02/08/2018 10:55 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 6 of 9
Job No Sheet No Rev
7
Part
Software licensed to
Job Title DESIGN - ANALYSIS OF TRMPORARY STAGING FOR BR_231 Ref

By UDAYAN Date 2-Aug-18 Chd

Client MAX INFRASTRUCTURE LTD. File Date/Time 02-Aug-2018 10:43


staging_modified2_with_soil_spring.std

Utilization Ratio Cont...


Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (in2) (in4) (in4) (in4)
85 Taper Taper 0.184 1.000 0.184 SHEAR -Y 3 25.370 909.362 309.131 3.704
86 Taper Taper 0.162 1.000 0.162 SHEAR -Y 3 25.370 909.362 309.131 3.704
87 Taper Taper 0.175 1.000 0.175 SHEAR -Y 3 25.370 909.362 309.131 3.704
88 Taper Taper 0.152 1.000 0.152 SHEAR -Y 3 25.370 909.362 309.131 3.704
120 Taper Taper 0.118 1.000 0.118 SHEAR -Y 3 25.370 909.362 309.131 3.704
121 Taper Taper 0.083 1.000 0.083 AISC- H2-1 3 25.370 909.362 309.131 3.704
122 Taper Taper 0.152 1.000 0.152 SHEAR -Y 3 25.370 909.362 309.131 3.704
123 Taper Taper 0.100 1.000 0.100 AISC- H2-1 3 25.370 909.362 309.131 3.704
124 Taper Taper 0.175 1.000 0.175 SHEAR -Y 3 25.370 909.362 309.131 3.704
125 Taper Taper 0.093 1.000 0.093 AISC- H2-1 3 25.370 909.362 309.131 3.704
126 Taper Taper 0.162 1.000 0.162 SHEAR -Y 3 25.370 909.362 309.131 3.704
127 Taper Taper 0.101 1.000 0.101 AISC- H2-1 3 25.370 909.362 309.131 3.704
128 Taper Taper 0.184 1.000 0.184 SHEAR -Y 3 25.370 909.362 309.131 3.704
129 Taper Taper 0.095 1.000 0.095 SHEAR -Y 3 25.370 909.362 309.131 3.704
130 Taper Taper 0.118 1.000 0.118 SHEAR -Y 3 25.370 909.362 309.131 3.704
131 Taper Taper 0.127 1.000 0.127 AISC- H2-1 3 25.370 909.362 309.131 3.704
132 PIPE PIPE 0.378 1.000 0.378 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
133 PIPE PIPE 0.187 1.000 0.187 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
134 PIPE PIPE 0.203 1.000 0.203 AISC- H1-1 3 23.860 1.11E+3 1.11E+3 2.22E+3
135 PIPE PIPE 0.201 1.000 0.201 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
136 PIPE PIPE 0.203 1.000 0.203 AISC- H1-1 3 23.860 1.11E+3 1.11E+3 2.22E+3
137 PIPE PIPE 0.187 1.000 0.187 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
138 PIPE PIPE 0.378 1.000 0.378 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
139 Taper Taper 0.255 1.000 0.255 AISC- H1-3 3 25.370 909.362 309.131 3.704
140 Taper Taper 0.100 1.000 0.100 AISC- H1-3 3 25.370 909.362 309.131 3.704
141 Taper Taper 0.080 1.000 0.080 AISC- H1-3 3 25.370 909.362 309.131 3.704
142 Taper Taper 0.110 1.000 0.110 AISC- H1-3 3 25.370 909.362 309.131 3.704
143 Taper Taper 0.115 1.000 0.115 AISC- H1-3 3 25.370 909.362 309.131 3.704
144 Taper Taper 0.099 1.000 0.099 AISC- H1-3 3 25.370 909.362 309.131 3.704
145 Taper Taper 0.099 1.000 0.099 AISC- H1-3 3 25.370 909.362 309.131 3.704
146 Taper Taper 0.115 1.000 0.115 AISC- H1-3 3 25.370 909.362 309.131 3.704
147 Taper Taper 0.110 1.000 0.110 AISC- H1-3 3 25.370 909.362 309.131 3.704
148 Taper Taper 0.080 1.000 0.080 AISC- H1-3 3 25.370 909.362 309.131 3.704
149 Taper Taper 0.100 1.000 0.100 AISC- H1-3 3 25.370 909.362 309.131 3.704
150 Taper Taper 0.255 1.000 0.255 AISC- H1-3 3 25.370 909.362 309.131 3.704
152 Taper Taper 0.060 1.000 0.060 AISC- H2-1 3 25.370 909.362 309.131 3.704
154 Taper Taper 0.060 1.000 0.060 AISC- H2-1 3 25.370 909.362 309.131 3.704
156 Taper Taper 0.060 1.000 0.060 AISC- H2-1 3 25.370 909.362 309.131 3.704
158 Taper Taper 0.060 1.000 0.060 AISC- H2-1 3 25.370 909.362 309.131 3.704
159 Taper Taper 0.184 1.000 0.184 SHEAR -Y 3 25.370 909.362 309.131 3.704
161 Taper Taper 0.162 1.000 0.162 SHEAR -Y 3 25.370 909.362 309.131 3.704
163 Taper Taper 0.175 1.000 0.175 SHEAR -Y 3 25.370 909.362 309.131 3.704
165 Taper Taper 0.152 1.000 0.152 SHEAR -Y 3 25.370 909.362 309.131 3.704
167 Taper Taper 0.049 1.000 0.049 AISC- H1-3 3 25.370 909.362 309.131 3.704
169 Taper Taper 0.049 1.000 0.049 AISC- H1-3 3 25.370 909.362 309.131 3.704

Print Time/Date: 02/08/2018 10:55 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 7 of 9
Job No Sheet No Rev
8
Part
Software licensed to
Job Title DESIGN - ANALYSIS OF TRMPORARY STAGING FOR BR_231 Ref

By UDAYAN Date 2-Aug-18 Chd

Client MAX INFRASTRUCTURE LTD. File Date/Time 02-Aug-2018 10:43


staging_modified2_with_soil_spring.std

Utilization Ratio Cont...


Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (in2) (in4) (in4) (in4)
171 Taper Taper 0.049 1.000 0.049 AISC- H1-3 3 25.370 909.362 309.131 3.704
173 Taper Taper 0.049 1.000 0.049 AISC- H1-3 3 25.370 909.362 309.131 3.704
175 Taper Taper 0.049 1.000 0.049 AISC- H1-3 3 25.370 909.362 309.131 3.704
177 Taper Taper 0.049 1.000 0.049 AISC- H1-3 3 25.370 909.362 309.131 3.704
179 Taper Taper 0.049 1.000 0.049 AISC- H1-3 3 25.370 909.362 309.131 3.704
181 Taper Taper 0.049 1.000 0.049 AISC- H1-3 3 25.370 909.362 309.131 3.704
183 Taper Taper 0.051 1.000 0.051 AISC- H1-3 3 25.370 909.362 309.131 3.704
185 Taper Taper 0.127 1.000 0.127 AISC- H2-1 3 25.370 909.362 309.131 3.704
187 Taper Taper 0.127 1.000 0.127 AISC- H2-1 3 25.370 909.362 309.131 3.704
189 Taper Taper 0.051 1.000 0.051 AISC- H1-3 3 25.370 909.362 309.131 3.704
206 PIPE PIPE 0.297 1.000 0.297 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
207 PIPE PIPE 0.118 1.000 0.118 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
208 PIPE PIPE 0.072 1.000 0.072 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
209 PIPE PIPE 0.071 1.000 0.071 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
212 PIPE PIPE 0.207 1.000 0.207 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
213 PIPE PIPE 0.138 1.000 0.138 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
214 PIPE PIPE 0.122 1.000 0.122 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
215 PIPE PIPE 0.120 1.000 0.120 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
218 PIPE PIPE 0.225 1.000 0.225 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
219 PIPE PIPE 0.156 1.000 0.156 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
220 PIPE PIPE 0.139 1.000 0.139 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
221 PIPE PIPE 0.138 1.000 0.138 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
224 PIPE PIPE 0.219 1.000 0.219 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
225 PIPE PIPE 0.150 1.000 0.150 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
226 PIPE PIPE 0.133 1.000 0.133 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
227 PIPE PIPE 0.132 1.000 0.132 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
230 PIPE PIPE 0.225 1.000 0.225 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
231 PIPE PIPE 0.156 1.000 0.156 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
232 PIPE PIPE 0.139 1.000 0.139 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
233 PIPE PIPE 0.138 1.000 0.138 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
236 PIPE PIPE 0.207 1.000 0.207 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
237 PIPE PIPE 0.138 1.000 0.138 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
238 PIPE PIPE 0.122 1.000 0.122 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
239 PIPE PIPE 0.120 1.000 0.120 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
242 PIPE PIPE 0.297 1.000 0.297 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
243 PIPE PIPE 0.118 1.000 0.118 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
244 PIPE PIPE 0.072 1.000 0.072 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
245 PIPE PIPE 0.071 1.000 0.071 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
248 PIPE PIPE 0.150 1.000 0.150 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
249 PIPE PIPE 0.084 1.000 0.084 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
250 PIPE PIPE 0.066 1.000 0.066 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
251 PIPE PIPE 0.065 1.000 0.065 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
254 PIPE PIPE 0.169 1.000 0.169 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
255 PIPE PIPE 0.128 1.000 0.128 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
256 PIPE PIPE 0.119 1.000 0.119 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3

Print Time/Date: 02/08/2018 10:55 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 8 of 9
Job No Sheet No Rev
9
Part
Software licensed to
Job Title DESIGN - ANALYSIS OF TRMPORARY STAGING FOR BR_231 Ref

By UDAYAN Date 2-Aug-18 Chd

Client MAX INFRASTRUCTURE LTD. File Date/Time 02-Aug-2018 10:43


staging_modified2_with_soil_spring.std

Utilization Ratio Cont...


Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (in2) (in4) (in4) (in4)
257 PIPE PIPE 0.117 1.000 0.117 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
260 PIPE PIPE 0.187 1.000 0.187 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
261 PIPE PIPE 0.145 1.000 0.145 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
262 PIPE PIPE 0.136 1.000 0.136 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
263 PIPE PIPE 0.135 1.000 0.135 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
266 PIPE PIPE 0.181 1.000 0.181 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
267 PIPE PIPE 0.139 1.000 0.139 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
268 PIPE PIPE 0.130 1.000 0.130 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
269 PIPE PIPE 0.129 1.000 0.129 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
272 PIPE PIPE 0.187 1.000 0.187 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
273 PIPE PIPE 0.145 1.000 0.145 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
274 PIPE PIPE 0.136 1.000 0.136 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
275 PIPE PIPE 0.135 1.000 0.135 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
278 PIPE PIPE 0.169 1.000 0.169 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
279 PIPE PIPE 0.128 1.000 0.128 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
280 PIPE PIPE 0.119 1.000 0.119 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
281 PIPE PIPE 0.117 1.000 0.117 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
284 PIPE PIPE 0.150 1.000 0.150 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
285 PIPE PIPE 0.084 1.000 0.084 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
286 PIPE PIPE 0.066 1.000 0.066 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3
287 PIPE PIPE 0.065 1.000 0.065 AISC- H1-3 3 23.860 1.11E+3 1.11E+3 2.22E+3

Print Time/Date: 02/08/2018 10:55 STAAD.Pro V8i (SELECTseries 6) 20.07.11.45 Print Run 9 of 9
ALL-PILE Version 6 CivilTech Software www.civiltech.com Licensed to

Non-displacement pile: H pile or


open-ended pipe. Little soil is
displaced. Friction is less than
FOUNDATION PROFILE & SOIL CONDITIONS displacement pile. Effective area
is used.

Depth FOUNDATION PROPERTIES SOIL PROPERTIES Depth


from from
Ground-m Ground-m
Depth Width-cm A'-cm2 Per.-cm I'-cm4 E -MP W -kN/m Depth  -kN/m3  C-kN/m2 k-MN/m3 e50 % Nspt
0 0
0.0 50 157.1 157.1 47123.9 199938 1.203 0.0 15.5 0.0 12.4 8.14 0.02 2
Steel (smooth) Soft Clay

1 1

2 2

3 3

4 4

4.5 17.1 28.0 0.0 16.29 9


5 Sandy Silt 5

6 6

7 7

8 8

9 9

10 10
10.0 50 157.1 157.1 47123.9 199938 1.203
Steel (smooth)
10.5 18.2 35.0 0.0 16.29 29
11 Fine Sand 11

12 12

13 13

14 14

15 15

Batter Angle=0 (Pile diameter not to scale) Surface Angle=0

CivilTech MS PIPE EMBEDMENT CALCULATION


Software Figure 1
VERTICAL ANALYSIS Figure 1

Loads:
Load Factor for Vertical Loads= 1.0

Vertical Load, Q= 350.0 -kN

Profile:
Pile Length, L= 10.0 -m
Top Height, H= 0.000 -m
Slope Angle, As= 0
Batter Angle, Ab= 0

Driving Steel Pile (Open end)

Soil Data: Pile Data:


Depth Gamma Phi C K e50 or Dr Nspt Depth Width Area Per. I E Weight
-m -kN/m3 -kN/m2 -MN/m3 % -m -cm -cm2 -cm -cm4 -MP -kN/m
0.000 15.5 0.0 12.4 8.14 0.02 2 0.0 50 157.1 157.1 47123.9 199938 1.203
4.5 17.1 28.0 0.0 16.29 0 9 10.0 50 157.1 157.1 47123.9 199938 1.203
10.5 18.2 35.0 0.0 16.29 0 29
16.5 17.1 0.0 25 27.14 0.01 5
24 18.2 32 0.0 16.29 0 14

Vertical capacity:
Weight above Ground= 0.00 Total Weight= -7.21-kN *Soil Weight is not included
Side Resistance (Down)= 454.622-kN Side Resistance (Up)= 271.230-kN
Tip Resistance (Down)= 112.550-kN Tip Resistance (Up)= 0.000-kN
Total Ultimate Capacity (Down)= 567.172-kN Total Ultimate Capacity (Up)= 264.018-kN
Total Allowable Capacity (Down)= 359.356-kN Total Allowable Capacity (Up)= 128.403-kN
OK! Qallow > Q

Settlement Calculation:
At Q= 350.00-kN Settlement= 0.05860-cm

CivilTech MS PIPE EMBEDMENT CALCULATION


Software
ALL-PILE Version 6 CivilTech Software www.civiltech.com Licensed to

Vertical Load vs. Settlement

600

540

480
Compression Load, Qdw -kN

420

360

300

240

180

120

60

0
0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 0.22 0.24 0.26 0.28 0.30 0.32 0.34 0.36 0.38 0.40

Settlement, X -cm
Total Side Tip

CivilTech MS PIPE EMBEDMENT CALCULATION


Software Figure 1
ALL-PILE Version 6 CivilTech Software www.civiltech.com Licensed to

ULTIMATE CAPACITY vs FOUNDATION DEPTH

9000 9000

8100 8100

7200 7200
Compression Capacity, Qdw -kN

6300 6300

Uplift Capacity, Qup -kN


5400 5400

4500 4500

3600 3600

2700 2700

1800 1800

900 900

0 0
0 10 20 30 40 50 60 70 80 90 100 0 10 20 30 40 50 60 70 80 90 100
Foundation Depth, L -m Foundation Depth, L -m

CivilTech MS PIPE EMBEDMENT CALCULATION


Software Figure 1
ISSUE DATE ISSUE DESCRIPTION BY CTM JOINT VENTURE CONSISTS OF : SUBMITTED BY DOHWA-KRNA-OCG-BARSYL-DDC
0 NAME GERARD CUMMINGS Joint Venture AKHAURA-LAKSAM DOUBLE LINE
CHINA RAILWAY GROUP LIMITED
TOMA CONSTRUCTION & CO. LTD DESIGNATION PROJECT MANAGER PLAN, ELEVATION AND SECTION OF
MAX INFRASTRUCTURE LIMITED DOHWA ENGINEERING CO. LTD.
SIGNATURE TEMPORARY STAGING FOR BR #231
KOREA RAIL NETWORK AUTHORITY
PREPARED BY CHECKED BY (SHEET 1 OF 3)
ORIENTAL CONSULTANTS GLOBAL
NAME MOHAMMED MONIR HOSSAIN NAME MD. NAZRUL ISLAM KHAN DRAWING STATUS DRAWING NO. REV.
CONSTRUCTION OF DUAL GAUGE
DESIGNATION BRIDGE ENGINEER DESIGNATION HEAD OF BRIDGE & CULVERT BARSYL DOUBLE RAIL LINE AND CONVERSION OF
DEVELOPMENT DESIGN CONSULTANT LTD. EXISTING RAIL LINE INTO DUAL GAUGE FOR CONSTRUCTION 0
SIGNATURE SIGNATURE BETWEEN AKHAURA AND LAKSAM
ISSUE DATE ISSUE DESCRIPTION BY CTM JOINT VENTURE CONSISTS OF : SUBMITTED BY DOHWA-KRNA-OCG-BARSYL-DDC
0 NAME GERARD CUMMINGS Joint Venture AKHAURA-LAKSAM DOUBLE LINE
CHINA RAILWAY GROUP LIMITED
TOMA CONSTRUCTION & CO. LTD DESIGNATION PROJECT MANAGER PLAN, ELEVATION AND SECTION OF
MAX INFRASTRUCTURE LIMITED DOHWA ENGINEERING CO. LTD.
SIGNATURE TEMPORARY STAGING FOR BR #231
KOREA RAIL NETWORK AUTHORITY
PREPARED BY CHECKED BY SHEET (2 OF 3)
ORIENTAL CONSULTANTS GLOBAL
NAME MOHAMMED MONIR HOSSAIN NAME MD. NAZRUL ISLAM KHAN DRAWING STATUS DRAWING NO. REV.
CONSTRUCTION OF DUAL GAUGE
DESIGNATION BRIDGE ENGINEER DESIGNATION HEAD OF BRIDGE & CULVERT BARSYL DOUBLE RAIL LINE AND CONVERSION OF
DEVELOPMENT DESIGN CONSULTANT LTD. EXISTING RAIL LINE INTO DUAL GAUGE FOR CONSTRUCTION 0
SIGNATURE SIGNATURE BETWEEN AKHAURA AND LAKSAM
ISSUE DATE ISSUE DESCRIPTION BY CTM JOINT VENTURE CONSISTS OF : SUBMITTED BY DOHWA-KRNA-OCG-BARSYL-DDC
0 NAME GERARD CUMMINGS Joint Venture AKHAURA-LAKSAM DOUBLE LINE
CHINA RAILWAY GROUP LIMITED
TOMA CONSTRUCTION & CO. LTD DESIGNATION PROJECT MANAGER PLAN, ELEVATION AND SECTION OF
MAX INFRASTRUCTURE LIMITED DOHWA ENGINEERING CO. LTD.
SIGNATURE TEMPORARY STAGING FOR BR #231
KOREA RAIL NETWORK AUTHORITY
PREPARED BY CHECKED BY SHEET (3 OF 3)
ORIENTAL CONSULTANTS GLOBAL
NAME MOHAMMED MONIR HOSSAIN NAME MD. NAZRUL ISLAM KHAN DRAWING STATUS DRAWING NO. REV.
CONSTRUCTION OF DUAL GAUGE
DESIGNATION BRIDGE ENGINEER DESIGNATION HEAD OF BRIDGE & CULVERT BARSYL DOUBLE RAIL LINE AND CONVERSION OF
DEVELOPMENT DESIGN CONSULTANT LTD. EXISTING RAIL LINE INTO DUAL GAUGE FOR CONSTRUCTION 0
SIGNATURE SIGNATURE BETWEEN AKHAURA AND LAKSAM