Rate Quotation for Civil Work

Serial Item Unit Rate


1 Lay Out sft 3.6
2 Excavation and Filling in Foundation cft 13.2
3 Dressing & Levelling sft 7.2
4 Polythene Laying sft 1.8
5 Removal of rubbish, sand up to 150 ft sft 9.6
6 Palisading Work sft 6
7 CC Casting (2" to 3") with Mixture Machine sft 14.4
8 Brick Flat Soling sft 6
9 End Edging with Brick rft 1.8
10 Herringbone Bond sft 12
CC Casting (Hand Mixing and Head Load Carrying) -
11 cft 36
Column, Beam, Ramp, Stair, Slab
12 Steel & Wooden Shutter (Fitting & Fixing) sft 30
13 M.S Rod Work (Straight rod) Ton 7200
14 M.S Rod Work (Curved rod) Ton 8400
15 10” Brick Wall (Straight) 0
16 10” Brick Wall (Straight) cft 21.6
17 10” Brick Wall (Curved) cft 21.6
18 5” Brick Wall sft 18
19 3”/4” Hollow Brick Wall sft 24
20 Inside Plaster sft 16.8
21 Outside Plaster sft 18
22 Window Grill fitting sft 14.4
23 Wooden Door Threshold Fitting Nos. 480
24 Exhaust Fan Fitting Nos. 240
25 Groove Cutting Rft 24
26 Plastic Door Frame Fitting Nos 360
27 Thai Bit rft 24
28 Chipping Work sft 3
29 Sand Screening or Wash cft 3.6
30 Stone Screening or Wash cft 3.6
31 Mason Wage Head 840
32 Mason(Steel Fixer) Wage Head 840
33 Helper Head 600
34 Angle or Post Fitting cft 60
35 Door Fitting Nos. 480
36 Window Fitting Nos. 480
37 Brick Soling with Cement Mortar sft 18
38 Cat Door Fitting Nos. 300
39 8"X2" Ceramic Brick Work sft 108
40 Neat Cement Finishing sft 4.8
41 Scaffolding (Working Platform with Bamboo sft 4.8
42 Soaking of brick (24 Hours) Nos. 1.2