You are on page 1of 10

11/23/2018 Healthcare Specialization Test

Healthcare Specialization Test Robin

Congratulations and thank you for attending the Healthcare Specialization


course, part of Schneider Electric's EcoXpert Program. If you scored more
than 70% on this test congratulations you have successfully passed the
course and your certificate will be emailed directly to you within the next 2
weeks. If you scored less than 70% we will contact you and arrange for a
retest

Your score: 70% (21 points out of 30)

Question #1 (1 point)

The best time to use an end-user value proposition is during the competitive
construction bid stage.

Your answer:
False Correct
Explanation:

Once the project is at bid stage it is very hard to influence the customer.
Design will normally be well-advanced by that time, so the ability to impact
the design will be difficult.

Question #2 (1 point)

Hospitals are NOT concerned with financial issues when operating a public
hospital.

Your answer:
False Correct
Explanation:

False, financial challenges are the top concern for most CEO's, for private
and public hospitals.

Question #3 (1 point)

Productivity is NOT a concern for hospitals, as they are already operating at


full capacity.
https://testmozusercontent.com/1794398/student/review 1/10
11/23/2018 Healthcare Specialization Test

Your answer:
False Correct
Explanation:

Productivity is a major challenge for all hospitals both in how they operate
their facilities to reduce maintenance backlog, but also in how they improve
the pathways for patients.

Question #4 (1 point)

EcoStruxure™ is an IoT architecture made up how many layers?

Your answer:
4 Incorrect
Explanation:

EcoStruxure™ is our open, interoperable, IoT-enabled system architecture


and platform. EcoStruxure™ delivers enhanced value around safety,
reliability, efficiency, sustainability, and connectivity. EcoStruxure™
leverages advancements in IoT, mobility, sensing, cloud, analytics and
cybersecurity to deliver Innovation at Every Level. This includes Connected
Products, Edge Control, and Apps, Analytics & Services.

Question #5 (1 point)

When following the solution-design approach, which statement is true?

Your answer:
Understand the needs, define the functions then select the
hardware/software Correct

Question #6 (1 point)

It is acceptable to change a negative pressure isolation room (infectious


patient room) into a positive pressure room in certain circumstances.

Your answer:

https://testmozusercontent.com/1794398/student/review 2/10
11/23/2018 Healthcare Specialization Test

False Correct
Explanation:

For infection reasons a negative pressure isolation room can NOT be


changed to a positive pressure room. A neutral pressure room can become
negative in case of pandemic situations.

Question #7 (1 point)

Which project delivery model is normally based on the lowest price?

Your answer:
Construction Manager at Risk Incorrect
Explanation:

Design-Bid-Build is normally a competitive bid situation against a


specification. The design stage has been completed and the project will now
go into build phase.

Question #8 (1 point)

At what stage of a project should a risk analysis be carried out? Select all
that you think are correct.

Your answer:
All of above Correct
Explanation:

Risk should be managed throughout the project, it is an ongoing activity, at


the sales stage and through execution. It is the responsibility of the project
manager to maintain the risk register through the project and report back to
management to decide how to mitigate risk. It should not be on request of
the management.

Question #9 (1 point)

What does ICRA stand for?

https://testmozusercontent.com/1794398/student/review 3/10
11/23/2018 Healthcare Specialization Test

Your answer:
International Certificate Risk Awareness Incorrect

Question #10 (1 point)

Temperature and humidity is important to control infection. Which 2


statements below are true?

Your answer:
Viruses thrive best in cold temperatures and humid conditions, Bacteria will
thrive best in dark, humid conditions Incorrect
Explanation:

“Influenza” from the Italian name “influenza di freddo” or influence of the


cold thrive in cold, dry conditions.

Bacteria and mold thrive in dark and moist areas.

Question #11 (1 point)

Air quality is very important for patients with weak immune systems who
may have undergone procedures such as bone marrow transplant. These
patients will be placed into protective patient rooms where HEPA filters are
normally installed where?

Your answer:
The supply air into the room Correct
Explanation:

It is important that clean air is provided to patients who have weak immune
systems (like bone marrow transplant patients) as they are more
susceptible to infection. To provide clean air, HEPA filters are found in the
supply ducts in the room.

Question #12 (1 point)

Patients with infectious diseases should be isolated from other patients and
workers and placed in isolation rooms. In these isolation rooms it is

https://testmozusercontent.com/1794398/student/review 4/10
11/23/2018 Healthcare Specialization Test

acceptable for the exhaust air to be recirculated into other areas when a
HEPA filter has been installed.

Your answer:
False Correct
Explanation:

The exhaust can NOT be recirculated. The air needs to be exhausted outside
of the building and away from areas where it can come into contact with the
public and staff. HEPA filters are installed on the exhaust to clean the air
before its exhausted outside.

Question #13 (1 point)

EcoStruxure™ can be used to control medical gas systems in a hospital.

Your answer:
False Correct
Explanation:

EcoStruxure™ is used only to MONITOR alarms from medical gas systems,


so the right person can be alerted to the fault.

Question #14 (1 point)

What are the key challenges addressed through EcoStruxure™ for


Healthcare? Select all that you think are correct.

Your answer:
Patient Safety, Patient Satisfaction, Operational Efficiency Correct

Question #15 (1 point)

The clinical environmental optimization solution connects to hospital clinical


system (such as patient admission) to achieve which functionalities?

Your answer:
Reduce energy usage in patient and operating rooms Correct
https://testmozusercontent.com/1794398/student/review 5/10
11/23/2018 Healthcare Specialization Test

Explanation:

The CEO application has no impact on patient data or admitting patients to


rooms. The application recieves messages from the clincal systems to allow
HVAC systems to be put into energy-saving modes.

Question #16 (1 point)

EcoStruxure™ can ONLY connect to 3rd party systems using BACnet, LON
works or Modbus?

Your answer:
False Correct
Explanation:

With tools like SmartConnector and Web Services, EcoStruxure™ is flexible


to allow API's to be created to connect to other systems such as nurse call,
RTLS, etc

Question #17 (1 point)

When a fire alarm is activated in a hospital, it is common practice for the


hospital to operate which evacuation policy?

Your answer:
Horizontal evacuation Correct
Explanation:

Full evacuation is the last measure for a hospital. Smoke/fire compartments


are designed to manage the spread of fire and smoke. Hospitals operate a
horizontal evacuation where patients are moved to an adjacent smoke/fire
zone. Integration with ventilation systems is important to help prevent the
spread of smoke and fire.

Question #18 (1 point)

General contractors are looking for ways to deliver projects on time and
under budget. Which of the following methods is a reactive approach and
https://testmozusercontent.com/1794398/student/review 6/10
11/23/2018 Healthcare Specialization Test

and will not help?

Your answer:
Increased labour on site Correct

Question #19 (1 point)

Hospitals are concerned about noise levels as it leads to which issues?


Select all that you think are correct.

Your answer:
All of above Correct

Question #20 (1 point)

Installing a measuring device to monitor noise levels is an important step on


the road to a silent hospital strategy.

Your answer:
True Correct

Question #21 (1 point)

When designing negative pressure rooms, the following statement is


correct.

Your answer:
The flow of air should be from the corridor to the room Correct

Question #22 (1 point)

EcoStruxure™ for Healthcare is a software application that brings the right


information to the right person, anytime, anywhere.

Your answer:
True Incorrect
Explanation:

https://testmozusercontent.com/1794398/student/review 7/10
11/23/2018 Healthcare Specialization Test

EcoStruxure™ for Healthcare is an architecture, which is made up of best-


in-class software applications. EcoStruxure™ for Healthcare allows for
interoperability between these applications, that allow the right information
to be sent to the right person, anytime, anywhere.

Question #23 (1 point)

What are the basics concepts of the healthcare security department? Select
all that you think are correct.

Your answer:
All of above Correct

Question #24 (1 point)

When designing a hospital, redundancy is only important for electrical


systems?

Your answer:
False Correct
Explanation:

Redundancy is needed for all critical systems and areas of a hospital,


including mechanical, electrical, security and IT systems.

Question #25 (1 point)

When working on systems (such as ventilation systems) that serve critical


areas like operating theatres, it's important to always coordinate with
whom?

Your answer:
Energy Manager Incorrect
Explanation:

The clinical team should always be made aware of any maintenance


work that could have an impact on how they deliver patient care. They also
need to be involved so they can evaluate the effect on infection control.

https://testmozusercontent.com/1794398/student/review 8/10
11/23/2018 Healthcare Specialization Test

Question #26 (1 point)

When integrating other systems with EcoStruxure™, what questions should


be asked? Select all that you think are correct.

Your answer:
What is the protocol Incorrect

Question #27 (1 point)

The classic Isolated Power System (IPS) panels are installed in senstive
areas of the hospital such as operating rooms. What is their function?

Your answer:
Eliminate most of the power quality problems Incorrect
Explanation:

The IPS panel incorporates an isolation transformer and a continuous


insulation monitor in conformity with the required standards to ensure the
supply of power to medical equipment in the event of a first insulation fault.

Question #28 (1 point)

EcoStruxure™ Power has the ability to generate reports that help comply
with the joint commission for testing of emergency power back up systems.

Your answer:
True Correct

Question #29 (1 point)

What analytical services can be used with EcoStruxure™ Power? Select all
that you think are correct.

Your answer:
Power Advisor Incorrect
Explanation:
https://testmozusercontent.com/1794398/student/review 9/10
11/23/2018 Healthcare Specialization Test

Power Advisor and Asset Advisor are services built around the electrical
distribution system that help to identify issues before they casue problems.

Building Advisor is used in connection with the BMS, EcoStruxureTM Building


Operation.

Question #30 (1 point)

EcoStruxure™ Power Monitoring Expert is used in healthcare to provide


which of the functions below?

Your answer:
All of above Correct
Explanation:

EcoStruxure™ Power Monitoring Expert is a complete supervisory software


package for power management applications. The software collects and
organizes data gathered from your facility’s electrical network and presents
it as meaningful, actionable information via intuitive web interface.

https://testmozusercontent.com/1794398/student/review 10/10

You might also like