Project:

REPAIR AND STRENGHTENING


OF EXISTING PLATFORM

Location: AF/CA
Proj Duration: 18 HOURS
Date Start: 5/14/2019
Date Finish: 5/14/2019

s
cc
t
WORK SCOPE

our
%W

%A

#h
Work hours 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM

Mobilization: Materials, Labor, tools /eqpt at site. 2% 0.5 Plan


1
Secure permits.
Actual

2% 0.5 Plan
2 Installation of barricade and safety signages.

Actual

13% 3 Plan
5 Installation of diagonal
Actual

37.50% 9 Plan
6 Installation of columns
6 Installation of columns
Actual

37.50% 9 Plan
6 Installation of H-Beam
Actual

4.17% 1 Plan
6 Painting
Actual

4.17% 1 Plan
7 Housekeeping
Actual
100% 24.0
Total Weighted Accomplishment =
Total Project Accomplishment =

Prepared by: Reviewed by:

Marvey E. Ojeda Bimbo P. Becera


Field Engineer Proj. In-charge
12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM 11:00 PM 12:00 AM 1:00 AM
Approved by / Date:

PASAR Representative
Ending Acc
2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 7:00 AM
Project: On-Site Overhaul of CF Boiler #2
Location: Smelter
Proj Duration: 25 Working days
Date Start: 1/21/2019
Date Finish: 2/15/2019

Work days 1 2 3 4 5

cc

ays
t
WORK SCOPE

%W

%A

#d
Work days 3-Feb 4-Feb 5-Feb 6-Feb 7-Feb

0.7% 0.17 Plan


1 Boiler depressuring/draining

Actual

0.3% 0.083 Plan


2 Installation of scaffolding outside WHB

Actual

Removal of insulation and cladding(outside 2.4% 0.60 Plan


3
WHB)
Actual

4
Visual inspection of related supports for corroded 8.1% 2 Plan
structural elements(outside WHB)
Actual
Repair/repainting of dilapidated structural
5
element supports for boiler such as buck stay, 12.2% 3 Plan 73% 75% 77% 80% 83%
Repair/repainting of dilapidated structural
5
element supports for boiler such as buck stay,
beams,angular's, purlins, hammering anvilm
plates and supports (outside WHB). Actual

Repair/re-conditioning/repainting of penthouse 8.1% 2 Plan


6
casing manholes (outside WHB).
Actual

Replacement/repair/repainting of delapidated 2.0% 0.5 Plan


7
Boiler hanger cover cups(outside WHB).
Actual

9.4% 2.33 Plan


8 Installation of scaffolding at boiler.
Actual

Visual inspection/UTG of boiler tubes for tinned 12.2% 3 Plan


9
out and corrosion.
Actual

Repair of dilapidated air-vents,drain lines as well


10
as replacement of damaged vent/drain isolation 12.2% 3 Plan 20% 40% 60% 80%
valves(as per NDT/Operation recommendations)
(outside WHB)
Actual

Replacement of noted(as per NDT 20.3% Plan 75% 77% 79% 80%
5
11 recommendation )thinned-out and corroded
boiler tubes.
Actual

12.2% 3 Plan 65% 70% 80% 90%


12 Dye Penetrant Test
Actual
Filling of water/pressurized for hydro testing of
Plan
13
waste heat boiler including air-vent/drain pipe
line @ 48kg/sq. cm. Test pressure with 20 mins
holding time
Actual

Depressurized and draining of tubes ready to Plan


14
work
Actual

Plan
15 Repair of noted leaks after hydro testing

Actual

Plan
16 Commissioning

Actual
100% 24.68
Total Weighted Accomplishment =
Total Project Accomplishment =

Prepared by: Reviewed by:

Engr. Archie Sevilla Bimbo P. Becera


Field Engineer Proj. In-charge
Ending Acc
6 7 8 9 10 11 12 13 14 15

8-Feb 9-Feb 10-Feb 11-Feb 12-Feb 13-Feb 14-Feb 15-Feb 16-Feb 17-Feb

85% 88% 90% 100%


100%

90% 100%

95% 100%
Approved by / Date:

PASAR Representative