You are on page 1of 4

Community Market Place _Standard BoQ TEMPLATE

Item Unit Total Contribution


Description of works Unit Spec. QTY
N0. Cost Cost
CommunityCDRD
1.10 Substructure work

Allow for clearing the site from any debris,


trees,roots etc, filling hollows and
1.11 levelling. LS 0.00

Excavation of found trench 0.4m x


1,12 0.5m depth. M3 0.00
Mass concrete in 50 mm thick
blinding layer (1:4:8 mix ) under the
1.13 foundation wall. M3 0.00
Rubble stone foundation wall in
cement & sand mortar 1:4 ( 0.8 m x
0.4m wide) min. 15cm above ground
1.14 level. M3 0.00
R.C (1:2:4 mix) in ground beam
(0.4m x0.15m ), with 4N0. Y12 re-
1.15 bars & R6 links @ 300 mm c/c. M3 0.00
200 mm thick stone hardcore filling
1.16 well compacted and leveled. M3 0.00

75mm thick murram or other


approved backfill material, well
1.17 compacted and leveled. M3 0.00
Total for Item 1.10 0.00

1.20 Bill of materials for Item 1.10 (Substructure works)


1.21 Ordinary portland Cement Bags 0.00 0.00
1.22 River sand or other approved sand tonne 0.00 0.00
1.23 Stone ballast (20mm size) tonne 0.00 0.00
1.24 Foundation stone tonne 0.00 0.00
1.25 Hardcore stone tonne 0.00 0.00
1.26 Murram or approved backfill material tonne 0.00 0.00
1.27 Re-bar Y12 Pcs 0.00 0.00
1.28 Re-bar R 6 Pcs 0.00 0.00
1.29 White timber 12x1 Pcs 0.00 0.00
1.30 White timber 2x1 Pcs 0.00 0.00
1.31 Wire nails 3 Kg 0.00 0.00
1.32 Binding wire Kg 0.00 0.00
1.33 Water Truck 0.00 0.00
Total materials 0.00
1.34 Transport cost % 0.00 0.00
1.35 Labour Costs % 0.00 0.00
Total transport & labour 0.00
Total for I tem 1.20 0.00

2.10 Superstructure works including conc. floor slab


Mass concrete (1:3:6 mix ) in conc. floor
2.11 slab 50 mm thick. M3 0.00
40cm thick rubble stone walling in cement
2.12 & sand mortar 1;4 mix M3 0.00
20cm thick cement block walling laid in
cement & sand mortar 1:4 mix ( rate to
2.13 include making of blocks) M2 0.00
R.C (1:2:4 mix) in two level conc. ring
beams (40 cm x15 cm ), each with
4N0. Y12 re-bars & R6 links @ 250
2.14 mm c/c. M3 0.00
R.C (1:2:4 mix) in 20 cm x 20 cm
column shaft, each with 4N0. Y12 re-
2.15 bars & R6 links @ 200 mm c/c. M3 0.00
R.C (1:2:4 mix) in display tables (1m
2.16 x 0.7m x 0.05m x 12 N0. ). M3 0.00
Total for Item 2.10 0.00

2.20 Bill of materials for Item 2.10 ( Superstructure works )


2.21 Ordinary portland Cement bags 0.00 0.00
2.22 River sand or other approved sand tonne 0.00 0.00
2.23 Stone ballast (20mm size) tonne 0.00 0.00
2.24 Re-bar Y12 Pcs 0.00 0.00
2.25 Re-bar R 6 Pcs 0.00 0.00
Well cured Sand /cement hollow blocks
2.26 (size 40x20x20 cm) Pcs 0.00 0.00
2.27 Walling stones tonne 0.00 0.00
2.28 Water Truck 0.00 0.00
2.29 White timber 12x1 Pcs 0.00 0.00
2.3 White timber 2x3 Pcs 0.00 0.00
2.31 White timber 2x1 Pcs 0.00 0.00
2.32 Wire nails 3 Kg 0.00 0.00
2.33 Binding wire Kg 0.00 0.00
Total materials 0.00
2.34 Transport cost % 0.00 0.00
2.35 Labour Costs % 0.00 0.00
Total transport & labour 0.00
Total for Item 2.20 0.00

3.10 Roof work


Roof with timber rafters covered with N0.
28 GCI sheets with two coats anti- rust
3.11 paint M2 0.00

Supply and fix 200mm x 20mm fascia


3.12 board, including two coats enamel paint LM 0.00

Supply and erect 75 mm diam black steel


pipes (or class A pipes), to include two
coats gloss paint, for verandah roof
3.13 support. Pcs 0.00
Total for Item 3.10 0.00

3.20 Bill of materials for Item 3.10 ( Roof work )


3.21 White timber 3 x 2 Pcs 0.00 0.00
3.22 White timber 2 x 2 Pcs 0.00 0.00
3.23 White timber 6 x1 Pcs 0.00 0.00
3.24 White timber 12x1 Pcs 0.00 0.00
3.25 GCI Sheets ( N0.28 ) Pcs 0.00 0.00
3.26 Roofing nails Kg 0.00 0.00
3.27 Wire nails (assorted) Kg 0.00 0.00
3.28 75 mm diam. Class A steel pipes Pcs 0.00 0.00
Total materials 0.00
3.29 Transport cost % 0.00 0.00
3.30 Labour Costs % 0.00 0.00
Total transport & labour 0.00 0.00
Total for Item 3.20 0.00

4.10 Plastering and other finishing


External & internal plastering ,12 mm
thick, cement / sand mix 1:5, with
4.11 wood float finish. M2 0.00
Apply two coats white wash and
distemper paint to the plastered wall
4.12 surface. M2 0.00
40 mm thick 1;3 cement/sand floor
4.13 screed. M2 0.00
Total for Item 4.10 0.00

4.20 Bill of materials for Item 4.10 ( Plastering & other finishes )
4.21 Ordinary portland Cement bags 0.00 0.00
4.22 River sand or other approved sand tonne 0.00 0.00
4.24 Water Trucks 0.00 0.00
4.25 Lime bags 0.00 0.00
4.26 Emulsion paint Litres 0.00 0.00
4.27 Gloss paint Litres 0.00 0.00
Total materials 0.00
4.29 Transport cost % 0.00 0.00
4.30 Labour Costs % 0.00 0.00
Total transport & Labour 0.00 0.00
Total for Item 4.20 0.00

5.10 Gates, Doors & Windows

Supply and fix wooden panel doors (2.0m


x 0.9m) single leaf, complete with hinges
& locks and to include two coats of gloss
paint. Pcs Metal 0.00 0.00

Supply and fix metal gate ( 3m x 2.5m)


complete with hinges and locks and to
5.12 include 2 coats of gloss paint. Pcs 0.00 0.00

Supply and fix wooden panel windows


(1.0m x 1.2m ) complete with wooden
frame, hinges & locks and to include two
5.13 coats of gloss paint. Pcs 0.00 0.00
Total for Item 5.10 0.00
6.10 Provisional Items (includes materials & labour )
6.11 Water tank / Plumbing works LS 1 0.00 0.00
6.12 Standard latrine units as per BoQ LS 0.00 0.00
6.13 Electrical installation works LS 1 0.00 0.00
Total for Item 6.10 0.00

7.10 Other inputs


7.11 Land 1 0.00 0.00
7.12 Miscellaneus 1 0.00 0.00
Total for Item 7.10 0.00

Grand Total (Bill of materials, provisional items & other inputs 0.00 0.00 0.00
Grand Total (BoQ, provisional items & other inputs) 0.00
Note: 1) Ideally the two Grand Totals should be the same, but this is difficult to achieve as long as the
estimation methods are not based on exactly the same assumptions and criteria.
2) The higher of the two totals should be considered for costing purposes.

Percentage of community contribution #DIV/0!