Professional Documents
Culture Documents
APR10Q4
a) A level network A-B-C-D (Figure 1) was measured and the elevation differences and standard
deviation between points were recorded as shown in Table 4. The elevation of point A is 500.00m.
It is required to determine the elevations of points B, C and D. 20M
B – A = 8.50 + V1
C – B = 4.28 + V2
D – C = -6.60 + V3
A – D = -5.72 + V4
D – B = -2.16 + V5
C – A = 12.91 + V6
B = 508.5 + V1
-B + C = 4.28 + V2
-C+D = -6.60 + V3
- D = -505.72 + V4
-B +D = -2.16 + V5
C = 512.91 + V6
0 0 508.5 1
0 4.28 2
0
6.60
3
= +
0 0
505.72
4
0
2.16
5
0 0 512.91 6
1 0 0 508.5 1
1 1 0 4.28 2
0 1 1
6.60
3
A= L= V=
X =
0 0 1
505.72
4
1 0 1
2.16
5
0 1 0 512.91 6
1 0 0 508.5 1
1 1 0 4.28 2
0 1 1
X =
6.60
3
+
0 0 1
505.72
4
1 0 1
2.16
5
0 1 0 512.91 6
140000 0 0 0 0 0
0 111111.1111 0 0 0 0
0 0 62500 0 0 0
0 0 0 111111.1111 0 0
0 0 0 0 27777.7778 0
0 0 0 0 0 6944.4444