You are on page 1of 3

EAST COAST CENTER 2

80 ~120
HANDRAIL
PT. PAKUWON JATI Tbk.

100
25~100
STRUCTURE OPENING BALUSTRADE

RAILING (BY OTHERS)


MITRA

BALUSTRADE HEIGHT
<120
DECKINGS KONSTRUKSI
300
151 B 151

Min.2300
STEP WIDTH
FFL: FIN. FLOOR COVERING (BY
00
10 OTHERS AFTER INSTALLATION)
SKIRTING
PT. BERCA SCHINDLER LIFTS
5

RISE
SKIRT BRUSHES
25
~1
5 0 SFL: ROUGH CONCRETE

43
1000

STEP
Degr
ee

STRUCTURE OPENING

ELEVATION
PIT LENGTH

- SECTION - A
--
>2500 >2500
- SCALE 1:10 PT. PAKUWON JATI Tbk.
DATE
>2000 >2000

SHOP DRAWING SIGN

APPROVED
>2xB+2x80mm

>2xB+2x80mm
STRUCTURE
>B+2x80mm

>B+2x80mm
CM

OPENING
APPROVED AS NOTED
B

B
RETURN FOR CORRECTION ARS

PERSPEX HANDRAIL DISAPPROVED


STR

PIT LENGTH NOTE :

25~100
UNTUK DI KOORDINASIKAN DENGAN SHOP ME.EL
STRUCTURE OPENING BALUSTRADE DRAWING PEKERJAAN LAIN. PERSETUJUAN INI
TIDAK MEMBEBASKAN TANGGUNG JAWAB
KONTRAKTOR ATAS PEMENUHAN PERSYARATAN
DALAM DOKUMEN KONTRAK.

PLAN VIEW OF ESCALATOR (SINGLE ARRANGEMENT) ME.M

COPY OF

RESTRICTION DEVICES
DECKINGS (BY OTHERS)

STEP WIDTH

SKIRTING

SKIRT BRUSHES

STEP WIDTH (mm) B


600 838
800 1038 STEP
1000 1238

SAFETY ACCEPTANCE REQUIREMENT

- SECTION - A1
--
- SCALE 1:10

SS-805888242
-ESC11-14-LB-01 AS_SHOWN 1/3
ARRANGEMENT : INDOOR, PARALLEL ARRANGEMENT

30
TYPE : 9300AE-11-EN-30-100-M-R
VERTICAL RISE (mm) : 6800
INCLINATION : 30°

1525+10
78 kN (ESC 14)

-0

1465
1294
1000
STEP WIDTH : 1000
STEP RUN : 3 FLAT STEPS
SPEED (m/s)
MOTOR CAPACITY
: 0.5
: 11Kw / Unit ∅100mm ∅100mm EAST COAST CENTER 2

30
MAINS SUPPLY MOTOR : 5x10mm², 35A FUSE PROTECT (BY OTHERS) OPENING FOR OPENING FOR
MOTOR NOMINAL CURRENT : 26.7 A HOISTING HOOKS HOISTING HOOKS

600
MOTOR STARTING CURRENT : 51A BY OTHERS BY OTHERS

30
MAINS SUPPLY LIGHTING : 3x2.5mm²,16A FUSE PROTECT (BY OTHERS) REFER DET-3 REFER DET-3
POWER SUPPLY : 3Phase 380V ±6%, 50HZ
LIGHTING SUPPLY : 1Phase 220V ±6%, 50HZ

1525+10
78 kN (ESC 13)

-0

1465
1294
1000
PT. PAKUWON JATI Tbk.
NAME LEVEL SERVICES
ESC 11 - 12 G - 1st FLOOR

30
0
160

13
M-B
0
200
ARRANGEMENT : INDOOR, PARALLEL ARRANGEMENT
MITRA

13'
TYPE : 9300AE-11-EN-30-100-K-R
VERTICAL RISE (mm) : 5450 175 STRUCTURE OPENING = 14149+5
-5 175
INCLINATION : 30° 2ND FLOOR 0 KONSTRUKSI
265

13''
STEP WIDTH : 1000
STEP RUN : 2 FLAT STEPS
SPEED (m/s) : 0.5 250
MOTOR CAPACITY : 7.5Kw / Unit
5
MAINS SUPPLY MOTOR : 5x10mm², 25A FUSE PROTECT (BY OTHERS) 212

15'
MOTOR NOMINAL CURRENT : 18.7 A
MOTOR STARTING CURRENT : 36A 5
MAINS SUPPLY LIGHTING : 3x2.5mm²,16A FUSE PROTECT (BY OTHERS) 117
POWER SUPPLY : 3Phase 380V ±6%, 50HZ
PT. BERCA SCHINDLER LIFTS

14
950

15
LIGHTING SUPPLY : 1Phase 220V ±6%, 50HZ
850 ∅100mm

16
OPENING FOR
NAME LEVEL SERVICES

15''
HOISTING HOOKS
ESC 13 - 14 1st - 2nd FLOOR BY OTHERS

16'
REFER DET-3

30

30
1525+10

1525+10
100 kN (ESC 12) (ESC 14) 73 kN

-0

-0
1294
1000

1000
1294
1465

1465
30

30
600

600
30

30
1525+10

1525+10
100 kN (ESC 11) (ESC 13) 73 kN
-0

-0
1294
1000

1000
1294
1465

1465
PT. PAKUWON JATI Tbk.
DATE
M-B

30

30
SHOP DRAWING SIGN
0
160

13
APPROVED
0
200 CM

13'
APPROVED AS NOTED

175 STRUCTURE OPENING = 17287+5


-5 175 RETURN FOR CORRECTION ARS
0
265

13''
DISAPPROVED
STR
250
NOTE :
5
212 UNTUK DI KOORDINASIKAN DENGAN SHOP ME.EL

15'
DRAWING PEKERJAAN LAIN. PERSETUJUAN INI
TIDAK MEMBEBASKAN TANGGUNG JAWAB
KONTRAKTOR ATAS PEMENUHAN PERSYARATAN
5
117 DALAM DOKUMEN KONTRAK.
ME.M

14
1st FLOOR
950

15
COPY OF

850

16
15''
16'

1525+10
(ESC 12) 92 kN

-0
1000
1294
1465
3030
600
30
1525+10
(ESC 11) 92 kN

-0
1000
1294
1465
ESCALATOR LAYOUT PLAN
ESC 11 - 14

30
M-B

0
160

13
0
200

13'
0
265

13''
G FLOOR

5
212
250
15'

5
117
950
14
15

850
SS-805888242
AS_SHOWN 2/3
16

- LAYOUT PLAN -ESC11-14-LB-02


15''

--
- SCALE 1:50
16'
EAST COAST CENTER 2

END SUPPORT TOP


∅100mm OPENING FOR STYROFOAM STRIP FOR PT. PAKUWON JATI Tbk.
HOISTING HOOKS SEPARATING FLOOR
BY OTHERS COVER FROM BUILDING
REFER DET-3 FLOOR
STRUCTURE OPENING = 14149+5
-5
FIN. FLOOR COVERING
∅100mm OPENING FOR (BY OTHERS AFTER
TBA

2482 9440 2227


HOISTING HOOKS INSTALLATION OF 175+10

MITRA
BY OTHERS ESCALATOR) -0 STRUCT. OPNG.
773 min. 4677
REFER DET-3 10
FFL
KONSTRUKSI

135+10
-0
2x78kN RAILING
REFERDET-2 BY OTHERS
900

300
2ND FLOOR 2ND FLOOR
+11500 +11500

min. 300
1043

6
∅100mm OPENING FOR STYROFOAM TO PROTECT

78
HOISTING HOOKS THE END SUPPORT AGAINST PT. BERCA SCHINDLER LIFTS
BY OTHERS 40+10
-0
MORTAR AND CONCRETE
REFER DET-3 (BY OTHERS)

8
93

Min.2300
INLET FOR ELECTRICAL
LIGHT AND POWER SUPPLY

200
FRONT SIDE TOP CENTER
RISE : 5450+5

-
-5

400
DETAIL - 2
--
- SCALE 1:10

773
ES
C.
13
-1 773
4
2x100kN RAILING 2x73kN
REFERDET-2 REFERDET-1
900

900
BY OTHERS

30°
1ST FLOOR 1ST FLOOR 1ST FLOOR
+6050 +6050 +6050 END SUPPORT BOTTOM
PT. PAKUWON JATI Tbk.
min. 300
1043

1043
6

DATE
78

STYROFOAM STRIP FOR


SEPARATING FLOOR
COVER FROM BUILDING SHOP DRAWING SIGN
62

∅100mm OPENING FOR FLOOR


10

Min.2300 HOISTING HOOKS


FIN. FLOOR COVERING APPROVED
BY OTHERS
CM
REFER DET-3 175+10 (BY OTHERS AFTER
STRUCT. OPNG. -0 APPROVED AS NOTED
INSTALLATION OF
10
FFLESCALATOR)
200

RETURN FOR CORRECTION ARS

135+10
DISAPPROVED

-0
400
RISE : 6800+5
-5

STR

NOTE :

UNTUK DI KOORDINASIKAN DENGAN SHOP ME.EL


DRAWING PEKERJAAN LAIN. PERSETUJUAN INI
TIDAK MEMBEBASKAN TANGGUNG JAWAB
STYROFOAM TO PROTECT KONTRAKTOR ATAS PEMENUHAN PERSYARATAN
DALAM DOKUMEN KONTRAK.
THE END SUPPORT AGAINST ME.M
40+10
-0
MORTAR AND CONCRETE
COPY OF
ES (BY OTHERS)
C .11
-1 - DETAIL - 1
2
--
- SCALE 1:10
773

2x92kN
1000

REFERDET-1

900
30°
LANTAI DASAR G FLOOR
±0000 ±0000

1100+20
1043
0
4950+20
0

HOLE ∅100mm FOR ESCALATOR ELEVATION


2882 11778 2627 100kN HOISTING HOOKS
(BY OTHERS)
ESC 11 - 14
STRUCTURE OPENING = 17287+5
-5

- DETAIL - 3
--
- SCALE 1:25
- ELEVATION
--
- SCALE 1:50

SS-805888242
-ESC11-14-LB-03 AS_SHOWN 3/3

You might also like