PROJECT DRAWING NUMBER

THIS SUBMISSION IS DECLARED TO BE STRICTLY IN ACCORDANCE


WITH THE REQUIREMENTS OF THE CONTRACT
PH10- 1C- 10- 60- C005
CLIENT NAME

STAMP

QATAR TRANSMISSION SYSTEM EXPANSION – PHASE 10


SUBSTATIONS PACKAGE S5 & S8
CONTRACT No. GTC/371C/2010
CONSULTANT NAME

SUBSTATION NAME / CIRCUIT NAME

Common

0 25- 07- 12 ISSUED FOR COMMENT S.H.B J.W.P MICHEL

REV. STAT. DATE DESCRIPTION DRAWN CHECK. APPRO.


CONTRACTOR NAME

MANUFACTURE NAME MANUFACTURE DRAWING NUMBER

DRAWING / DOCUMENT TITLE

LV EQUIPMENT LV ACDB BUSBAR SIZING CALCULATION


- SUBSTATION -
220/ 66/ 11kV NEW DOHA B SUPER SUBSTATION, 220/ 66/ 11kV ABU HAMUR SUPER SUBSTATION,
220/ 66/ 11kV AIN KHALID SUPER SUBSTATION, 220/ 66/ 11kV LUSAIL DEVELOPMENT SUPER SUBSTATION
PROJECT DRAWING NUMBER
SCALE NTS SIZE A4 REV

SHEET 01 OF 20 SHEETS 0 PH10- 1C- 10- 60- C005


CONTENTS

Page
1. Title Block 01

2. Content 02

3. Calculation for Busbar Size 03

4. Load List for LVAC Main Board 04

5. Appendix
Appendix-1.1 : AC Load for Battery Charger 1, 2, 05-07
AC Load for 220/66kV 200MVA DB-T1, T2, T3 LCP

AC Load for 66/11kV 40MVA BA-T1, T2, T3 LCP

AC Load for 220/66kV 200MVA DB-T1, T2, T3 MDU

AC Load for 66/11kV 40MVA BA-T1, T2, T3 MDU

AC Load for Fire Pump Control System

Appendix-1.2 : AC Load for PDB-1 PANEL 08


Appendix-1.3 : AC Load for PDB-2 PANEL 09
Appendix-1.4 : AC Load for PDB-3 PANEL 10 - 11
Appendix-1.5 : AC Load for PDB-4 PANEL 12 - 13
Appendix-1.6 : AC Load for SDB-N1, N2 14 - 15
Appendix-1.7 : AC Load for SDB-N3, N4 16 - 17
Appendix-1.8 : AC Load for ACCP-1,3 18
Appendix-1.9 : AC Load for ACCP-4,5 & 6 19 - 20

2 of 20
PH10-1C-10-60-C005_Rev.0
CALCULATION FOR BUSBAR SIZE

1. GENERAL

This calculation is vaild for


- NEW DOHA B SUPER SUBSTATION
- ABU HAMUR SUPER SUBSTATION
- AIN KHALID SUPER SUBSTATION
- LUSAIL DEVELOPMENT SUPER 3 SUBSTATION
As Hyosung used for calculation the quantity of equipment from the largest S/S
(AIN KHALID SUPER SUBSTATION)

2. NOTES FOR CALCULATION

2.1 FOMURLA

  3  , I 
A
3
P : Power consumption
I : Current on busbar
V : Nominal Voltage

2.2 CASE 1 (based on Aux. TR size)


Adapted Aux. TR size is 1000kVA as per PH10-1C-10-25-C202
 1500
   2086.81  (CASE 1)
3 3  0.415

2.2 CASE 2 (based on actual load of feeder)


Grand Total Load is 877kVA (refer to attached APPENDIX)
 1211
   1684.75  (CASE 2)
3 3  0.415

3. Conclusion

According to the calculation, Case 1 is bigger than Case 2

2500 A (Selected Busbar Size) > 2086.81 A (CASE 1) > 1684.75 A (Case 2)

Hence the selected busbar size is 2500 A

3 of 20
PH10-1C-10-60-C005_Rev.0
LOAD LIST FOR LVAC MAIN BOARD
FEEDING
NO. LOAD DESCRIPTION QUANTITY Permanent Load Unusual Load REMARKS
SOURCE
1 110V BATTERY CHARGER-1,2 1 (Normal) MAIN BOARD 67.2 116.5* APPENDIX-1.1
+1 (Boosting)
2 200MVA TR-1 COOLER FEEDER-1,2 1 MAIN BOARD 12.7 APPENDIX-1.1

3 200MVA TR-2 COOLER FEEDER-1,2 1 MAIN BOARD 12.7 APPENDIX-1.1

4 200MVA TR-3 COOLER FEEDER-1,2 1 MAIN BOARD 12.7 APPENDIX-1.1

5 40MVA TR-1 COOLER FEEDER-1,2 1 MAIN BOARD 9.6 APPENDIX-1.1

6 40MVA TR-2 COOLER FEEDER-1,2 1 MAIN BOARD 9.6 APPENDIX-1.1

7 40MVA TR-3 COOLER FEEDER-1,2 1 MAIN BOARD 9.6 APPENDIX-1.1

8 200MVA TR-1,2 & 3 MDU 1 MAIN BOARD 6.9 APPENDIX-1.1

9 40MVA TR-1,2 & 3 MDU 1 MAIN BOARD 6.9 APPENDIX-1.1

10 PDB-1 1 MAIN BOARD 4.1 APPENDIX-1.2

11 PDB-2 1 MAIN BOARD 3.7 APPENDIX-1.3

12 PDB-3 1 MAIN BOARD 24.4 APPENDIX-1.4

13 PDB-4 1 MAIN BOARD 17.9 APPENDIX-1.5

14 SDB-N1 1 MAIN BOARD 66.2 APPENDIX-1.6

15 SDB-N2 1 MAIN BOARD 42.1 APPENDIX-1.6

16 SDB-N3 1 MAIN BOARD 47.5 APPENDIX-1.6

17 SDB-N4 1 MAIN BOARD 49.9 APPENDIX-1.6

18 ACCP-1 1 MAIN BOARD 152.2 APPENDIX-1.7

19 ACCP-3 1 MAIN BOARD 184.7 APPENDIX-1.8

20 ACCP-4 1 MAIN BOARD 52.9 APPENDIX-1.8

21 ACCP-5 1 MAIN BOARD 2.6 APPENDIX-1.8

22 ACCP-5 1 MAIN BOARD 68.8 APPENDIX-1.8

23 FIRE PUMP CONTROL PANEL (Normal Condition) 1 MAIN BOARD 8.7 APPENDIX-1.1

24 FIRE PUMP SYSTEM (Unusual Condition) 1 MAIN BOARD 88.2* APPENDIX-1.1

250A TPN W/P INDUSTRIAL SOCKET OUTLET FOR TR


25 1 MAIN BOARD 196.4
OIL TREATMENT EQUIP.

26 UPS BYPASS 1 MAIN BOARD 6.0

*- Notes: 1) Fire pump motor and Transformer oil filtration socket load will not work at same time. Hence fire pump system load not considered in this calculation

2) UPS load not considered in this calculation. Hence the UPS bypass load is not permanent it will operate when UPS inverter is failed or maintenance.

3) Battery charger load will be 119.9kVA in Unusual(Boosting) mode. However, we already considerded 69.3kVA in the permanent load.

Hence, remaining load of 49.3kVA(116.5-67.2) only added in the unusual load.

Normal Condtion Unusual Condtion

SUM OF MAXIMUM DEMAND OF PERMANENT LOAD (A) 874 -


<WITHOUT SPARE>

OVER-ALL MAXIMUM LOAD (B) 743 -


=<PERMANENT LOAD(A) x DIVERSITY FACTOR(0.85)>

+ 30% SPARE 223 -

250A TPN W/P INDUSTRAL SOCKET OUTLET + 110V BATTERY CHARGER (Unusual mode) - 246

TOTAL LOAD(kVA) 966 246

GRAND TOTAL(kVA) 1,211

CALCULATION NOTE

  3  , 
3
Therefore,
 1211
   1684.75

3 3  0.415

SELECTION OF BUSBAR SIZE [A] 2,500

4 of 20
PH10-1C-10-60-C005_Rev.0
Appendix-1.1

1. AC LOAD FOR 110V BATTERY CHARGER-1,2


1) Battery charger rating
2) AC LOAD
* Usual mode
Charger Output Load 1.3
AC LOAD = x
Efficiency x Power Factor 1000
317A x 110V DC 1.3
= x
0.9 x 0.75 1000

= 67.16 KVA

* Unusual mode
Charger Output Load 1.3
AC LOAD = x
Efficiency x Power Factor 1000
550A x 110V DC 1.3
= x
0.9 x 0.75 1000

= 116.5 KVA

2. AC LOAD FOR 220/66kV 200MVA DB-T1,T2 & T3 LCP


Load [VA]
Description Q'ty Unit load [W] P.F Unit Load [VA] Demand
Total
Factor
3-Phase AC load for Motor(AC 415V)
Cooling Fan 18 503 0.85 592 1.00 10655

Sub-total 10655

1-Phase AC load(AC 240V)


Receptacle 1 2400 1 2400 0.50 1200

Space Heater 2 100 0.85 118 1.00 235

Fluorescent Lamp 2 10 0.85 12 0.50 12

LCP Control 1 200 1 200 1.00 200

Gas monitoring
3 144 1 144 1.00 432
device & Breather

Sub-total 2079

Total 12,734

5 of 20
PH10-1C-10-60-C005_Rev.0
Appendix-1.1

3. AC LOAD FOR 66/11kV 40MVA BA-T1,T2 & T3 LCP


Load [VA]
Description Q'ty Unit load [W] P.F Unit Load [VA] Demand
Total
Factor
3-Phase AC load for Motor(AC 415V)
Cooling Fan 13 503 0.85 592 1.00 7695

Sub-total 7695

1-Phase AC load(AC 240V)


Receptacle 1 2400 1 2400 0.50 1200

Space Heater 2 100 0.85 118 1.00 235

Fluorescent Lamp 2 10 0.85 12 0.50 12

LCP Control 1 200 1 200 1.00 200

Breather 2 144 1 144 1.00 288

Sub-total 1935

Total 9,630

4. AC LOAD FOR 220/66kV 200 MVA DB-T1,T2 & T3 MDU


Load [VA]
Description Q'ty Unit load [W] P.F Unit Load [VA] Demand
Total
Factor
3-Phase AC load for Motor(AC 415V)
MDU Motor 1 2156 1 2156 1.00 2156

Sub-total 2156

1-Phase AC load(AC 240V)


MDU Heater
1 150 1 150 1.00 150
& Control

Sub-total 150

Total[VA] 2,306

6 of 20
PH10-1C-10-60-C005_Rev.0
Appendix-1.1

5. AC LOAD FOR 66/11kV 40MVA BA-T1,T2 & T3 MDU


Load [VA]
Description Q'ty Unit load [W] P.F Unit Load [VA] Demand
Total
Factor
3-Phase AC load for Motor(AC 415V)
MDU Motor 1 2156 1 2156 1.00 2156

Sub-total 2156

1-Phase AC load(AC 240V)


MDU Heater
1 150 1 150 1.00 150
& Control

Sub-total 150

Total[VA] 2,306

6. AC LOAD FOR FIRE PUMP CONTROL SYSTEM


The load of fire pump motor : 100HP=74.57kW
The load of fire pump control panel : 7.43kW = 8.74kVA

7 of 20
PH10-1C-10-60-C005_Rev.0
Appendix-1.2

LOAD LIST FED FROM PDB-1

LOAD [W] DEMAND TOTAL LOAD


NO. LOAD DESCRIPTION Q'TY P.F LOAD [VA]
FACTOR [VA]
C I
1 AUX SUPPLY TO 110V BATTERY CHARGER 1
SPACE HEATER & LAMP 4 200 1.00 200 1.00 800
SUB TOTAL 800

2 AUX SUPPLY TO AUX. TR AT1


1) RECEPTACLE 1 200 1.00 200 0.50 100
2) SPACE HEATER 3 300 0.85 353 1.00 1,059
3) LAMP 1 10 0.85 12 0.50 6
4) BREATHER 2 288 1.00 288 1.00 576
SUB TOTAL 1,741

3 AUX SUPPLY TO ACDB PANEL


1) SPACE HEATER 10 55 1.00 55 1.00 550
2) LAMP 10 14 0.85 16 0.50 82
SUB TOTAL 632

4 AUX SUPPLY TO DCDB PANEL


1) SPACE HEATER 6 20 1.00 20 1.00 120
2) LAMP 6 14 0.85 16 0.50 49
SUB TOTAL 169

5 AUX SUPPLY TO TELECOM PANEL 2 320 0.90 356 1.00 711


SUB TOTAL 711

GRAND TOTAL FROM PDB-1 [VA] 4,054

NOTE : 1. C=Continuous, I=Intermittent


2. Demand factor is assumed to be 0.50 and 0.20 since all the intermittent loads are not envisaged to be operating simultaneously.

8 of 20
PH10-1C-10-60-C005_Rev.0
Appendix-1.3

LOAD LIST FED FROM PDB-2

LOAD [W] DEMAND TOTAL LOAD


NO. LOAD DESCRIPTION Q'TY P.F LOAD [VA]
FACTOR [VA]
C I
1 AUX SUPPLY TO 110V BATTERY CHARGER 2
SPACE HEATER & LAMP 4 200 1.00 200 1.00 800
SUB TOTAL 800

2 AUX SUPPLY TO AUX. TR AT2


1) RECEPTACLE 1 200 1.00 200 0.50 100
2) SPACE HEATER 3 300 0.85 353 1.00 1,059
3) LAMP 1 10 0.85 12 0.50 6
4) BREATHER 2 288 1.00 288 1.00 576
SUB TOTAL 1,741

3 AUX SUPPLY TO NER FOR 40MVA BA-T1


1) SPACE HEATER 1 200 1.00 200 1.00 200
2) LAMP 1 75 0.85 88 0.50 44
SUB TOTAL 244

4 AUX SUPPLY TO NER FOR 40MVA BA-T2


1) SPACE HEATER 1 200 1.00 200 1.00 200
2) LAMP 1 75 0.85 88 0.50 44
SUB TOTAL 244

5 AUX SUPPLY TO NER FOR 40MVA BA-T3


1) SPACE HEATER 1 200 1.00 200 1.00 200
2) LAMP 1 75 0.85 88 0.50 44
SUB TOTAL 244

6 AUX SUPPLY TO SPACE HEATER UPS 2 200 1.00 200 1.00 400
SUB TOTAL 400

7 AUX SUPPLY TO PDM LOCAL UNIT 1 1 0 1.00 0 1.00 0


SUB TOTAL 0

8 AUX SUPPLY TO PDM LOCAL UNIT 2 1 0 1.00 0 1.00 0


SUB TOTAL 0

GRAND TOTAL FROM PDB-2 [VA] 3,673

NOTE : 1. C=Continuous, I=Intermittent


2. Demand factor is assumed to be 0.50 and 0.20 since all the intermittent loads are not envisaged to be operating simultaneously.

9 of 20
PH10-1C-10-60-C005_Rev.0
Appendix-1.4

LOAD LIST FED FROM PDB-3

LOAD [W] DEMAND TOTAL LOAD


NO. LOAD DESCRIPTION Q'TY P.F LOAD [VA]
FACTOR [VA]
C I
1 AUX SUPPLY TO SCS PANEL
1) SPACE HEATER 5 100 1.00 100 1.00 500
2) LAMP 5 11 0.85 13 0.50 32
3) RECEPTACLE(Only 1 in use for SCS PNL) 1 3,600 1.00 3600 0.10 360
4) SUPERVISION RELAY 1 24 1.00 24 1.00 24
SUB TOTAL 916

2 AUX SUPPLY TO 220kV PROTN PANEL


1) SPACE HEATER 15+(6*) 100 1.00 100 1.00 2,100
2) LAMP 15+(6*) 11 0.85 13 0.50 136
3) RECEPTACLE(Only 2 in use for 66kV PROTN PNL) 2 3,600 1.00 3600 0.10 720
4) SUPERVISION RELAY 2 24 1.00 24 1.00 48
SUB TOTAL 3,004

3 AUX SUPPLY TO 220kV BUSBAR PROTN PANEL


1) SPACE HEATER 5 100 1.00 100 1.00 500
2) LAMP 5 11 0.85 13 0.50 32
3) RECEPTACLE(Only 1 in use for 66kV BBP PNL) 1 3,600 1.00 3600 0.10 360
4) SUPERVISION RELAY 1 24 1.00 24 1.00 24
SUB TOTAL 916

4 AUX SUPPLY TO 220kV GIS LCC (LHS)


1) LCC( HEATER, LAMP, etc.) 7+(3*) 200 1.00 200 0.50 1,000
2) CB( HEATER, etc.) 21+(9*) 100 1.00 100 0.50 1,500
3) DS( HEATER, etc.) 16+(9*) 50 1.00 50 0.50 625
4) ES( HEATER, etc.) 20+(9*) 50 1.00 50 0.50 725
SUB TOTAL 3,850

5 AUX SUPPLY TO 66kV GIS LCC (LHS)


1) LCC( HEATER, LAMP, etc.) 11+(3*) 200 1.00 200 0.50 1,400
2) CB( HEATER, etc.) 11+(3*) 50 1.00 50 0.50 350
3) 3PDS( HEATER, etc.) 25+(9*) 50 1.00 50 0.50 850
4) H-ES( HEATER, etc.) 11+(3*) 50 1.00 50 0.50 350
SUB TOTAL 2,950

6 AUX SUPPLY TO 11KV PROTN PNL (LHS)


1) SPACE HEATER 13+(3*) 100 1.00 100 1.00 1,600
2) LAMP 13+(3*) 11 0.85 13 0.50 104
3) RECEPTACLE(Only 1 in use for 11kV PROTN PNL) 1 3,600 1.00 3600 0.10 360
4) SUPERVISION RELAY 1 24 1.00 24 1.00 24
SUB TOTAL 2,088

7 AUX SUPPLY TO 11KV BUSBAR PROTN PNL


1) SPACE HEATER 3 100 1.00 100 1.00 300
2) LAMP 3 11 0.85 13 0.50 19
3) RECEPTACLE(Only 1 in use for 11kV PROTN PNL) 1 3,600 1.00 3600 0.10 360
4) SUPERVISION RELAY 1 24 1.00 24 1.00 24
SUB TOTAL 703

10 of 20
PH10-1C-10-60-C005_Rev.0
Appendix-1.4

LOAD [W] DEMAND TOTAL LOAD


NO. LOAD DESCRIPTION Q'TY P.F LOAD [VA]
FACTOR [VA]
C I
8 AUX SUPPLY TO 11KV SWGR
1) SPACE HEATER 42+(6*) 100 1.00 100 1.00 4,800
2) LAMP 42+(6*) 11 0.85 13 0.50 311
3) FORCED COOLING 2 365 0.85 429 1.00 859
4) AUX RELAY 42+(6*) 1.3 1.00 1 1.00 25
SUB TOTAL 5,994

9 AUX SUPPLY TO 220/66kV 200MVA DB-T1, T2, T3 RTCC


1) SPACE HEATER 3 100 1.00 100 1.00 300
2) LAMP 3 11 0.85 13 0.50 19
3) RECEPTACLE 1 3,600 1.00 3,600 0.10 360
4) SUPERVISION RELAY 1 24 1.00 24 1.00 24
SUB TOTAL 703

10 AUX SUPPLY TO 220kV 60MVAr D-R1 LCP (MAIN)


1) SPACE HEATER 1 100 1.00 100 1.00 100
2) LAMP 1 20 0.85 24 0.50 12
3) RECEPTACLE 1 2,400 1.00 2,400 0.10 240
4) GMD, BREATHER & CABLE BOX HEATER 1 1,270 1.00 1,270 1.00 1,270
SUB TOTAL 1,622

11 AUX SUPPLY TO 220kV 60MVAr D-R2 LCP (MAIN)


1) SPACE HEATER 1 100 1.00 100 1.00 100
2) LAMP 1 20 0.85 24 0.50 12
3) RECEPTACLE 1 2,400 1.00 2,400 0.10 240
4) GMD, BREATHER & CABLE BOX HEATER 1 1,270 1.00 1,270 1.00 1,270
SUB TOTAL 1,622

GRAND TOTAL FROM PDB-3 [VA] 24,369

NOTE : 1. C=Continuous, I=Intermittent


2. Demand factor is assumed to be 0.50 and 0.20 since all the intermittent loads are not envisaged to be operating simultaneously.

11 of 20
PH10-1C-10-60-C005_Rev.0
Appendix-1.5

LOAD LIST FED FROM PDB-4

LOAD [W] DEMAND TOTAL LOAD


NO. LOAD DESCRIPTION Q'TY P.F LOAD [VA]
FACTOR [VA]
C I
1 AUX SUPPLY TO 220kV GIS LCC (RHS)
1) LCC( HEATER, LAMP, etc.) 6+(3*) 200 1.00 200 0.50 900
2) CB( HEATER, etc.) 18+(9*) 100 1.00 100 0.50 1,350
3) DS( HEATER, etc.) 14+(9*) 50 1.00 50 0.50 575
4) ES( HEATER, etc.) 18+(9*) 50 1.00 50 0.50 675
SUB TOTAL 3,500

2 AUX SUPPLY TO 66kV PROTN PANEL


1) SPACE HEATER 20+(6*) 100 1.00 100 1.00 1,900
2) LAMP 20+(6*) 11 0.85 13 0.50 123
3) RECEPTACLE(Only 2 in use for 66kV PROTN PNL) 2 3,600 1.00 3600 0.10 720
4) SUPERVISION RELAY 2 24 1.00 24 1.00 48
SUB TOTAL 2,791

3 AUX SUPPLY TO 66kV BUSBAR PROTN PANEL


1) SPACE HEATER 7 100 1.00 100 1.00 700
2) LAMP 7 11 0.85 13 0.50 45
3) RECEPTACLE(Only 1 in use for 66kV BBP PNL) 1 3,600 1.00 3600 0.10 360
4) SUPERVISION RELAY 1 24 1.00 24 1.00 24
SUB TOTAL 1,129

4 AUX SUPPLY TO 66kV GIS LCC (RHS)


1) LCC( HEATER, LAMP, etc.) 9+(3*) 200 1.00 200 0.50 1,200
2) CB( HEATER, etc.) 9+(3*) 50 1.00 50 0.50 300
3) 3PDS( HEATER, etc.) 25+(9*) 50 1.00 50 0.50 850
4) H-ES( HEATER, etc.) 9+(3*) 50 1.00 50 0.50 300
SUB TOTAL 2,650

5 AUX SUPPLY TO 11KV PROTN PNL (CENTER)


1) SPACE HEATER 14 100 1.00 100 1.00 1,400
2) LAMP 14 11 0.85 13 0.50 91
3) RECEPTACLE(Only 1 in use for 11kV PROTN PNL) 1 3,600 1.00 3600 0.10 360
4) SUPERVISION RELAY 1 24 1.00 24 1.00 24
SUB TOTAL 1,875

6 AUX SUPPLY TO 11KV PROTN PNL (RHS)


1) SPACE HEATER 12+(3*) 100 1.00 100 1.00 1,500
2) LAMP 12+(3*) 11 0.85 13 0.50 97
3) RECEPTACLE(Only 1 in use for 11kV PROTN PNL) 1 3,600 1.00 3600 0.10 360
4) SUPERVISION RELAY 1 24 1.00 24 1.00 24
SUB TOTAL 1,981

12 of 20
PH10-1C-10-60-C005_Rev.0
Appendix-1.5

LOAD [W] DEMAND TOTAL LOAD


NO. LOAD DESCRIPTION Q'TY P.F LOAD [VA]
FACTOR [VA]
C I

7 AUX SUPPLY TO 66/11kV 40MVA BA-T1, T2, T3 RTCC


1) SPACE HEATER 3 100 1.00 100 1.00 300
2) LAMP 3 11 0.85 13 0.50 19
3) RECEPTACLE 1 3,600 1.00 3,600 0.10 360
4) SUPERVISION RELAY 1 24 1.00 24 1.00 24
SUB TOTAL 703

8 AUX SUPPLY TO 220kV 60MVAr D-R1 LCP (BACK UP)


1) SPACE HEATER 1 100 1.00 100 1.00 100
2) LAMP 1 20 0.85 24 0.50 12
3) RECEPTACLE 1 2,400 1.00 2,400 0.10 240
4) GMD, BREATHER & CABLE BOX HEATER 1 1,270 1.00 1,270 1.00 1,270
SUB TOTAL 1,622

9 AUX SUPPLY TO 220kV 60MVAr D-R2 LCP (BACK UP)


1) SPACE HEATER 1 100 1.00 100 1.00 100
2) LAMP 1 20 0.85 24 0.50 12
3) RECEPTACLE 1 2,400 1.00 2,400 0.10 240
4) GMD, BREATHER & CABLE BOX HEATER 1 1,270 1.00 1,270 1.00 1,270
SUB TOTAL 1,622

GRAND TOTAL FROM PDB-3 [VA] 17,873

NOTE : 1. C=Continuous, I=Intermittent


2. Demand factor is assumed to be 0.50 and 0.20 since all the intermittent loads are not envisaged to be operating simultaneously.

13 of 20
PH10-1C-10-60-C005_Rev.0
Appendix-1.6

LOAD LIST FED FROM SDB-N1

LOAD [W] DEMAND TOTAL LOAD


NO. LOAD DESCRIPTION Q'TY P.F LOAD [VA]
FACTOR [VA]
C I
1 DB-N1 FOR LV AC/DC ROOM 1 20,000 0.85 23,529 1.00 23,529

2 DB-NP1 FOR LV AC/DC ROOM 1 17,000 0.85 20,000 0.50 10,000

3 DB-EXT FOR LV AC/DC ROOM 1 26,000 0.85 30,588 0.50 15,294

4 ACCP-2 1 2,500 0.85 2,941 1.00 2,941

5 16A TP W/P ISOLATOR FOR SUMP PUMP 1 1,500 0.85 1,765 0.20 353

6 63A TP INDUSTRIAL SOCKET OUTLET AT 200MVA TR 1 20,000 0.85 23,529 0.20 4,706

7 63A TP INDUSTRIAL SOCKET OUTLET AT 200MVA TR 1 20,000 0.85 23,529 0.20 4,706

8 63A TP INDUSTRIAL SOCKET OUTLET AT AUX TR 1 20,000 0.85 23,529 0.20 4,706

TOTAL MAXIMUM DEMAND LOAD(VA) 66,235

14 of 20
PH10-1C-10-60-C005_Rev.0
Appendix-1.6

LOAD LIST FED FROM SDB-N2

LOAD [W] DEMAND TOTAL LOAD


NO. LOAD DESCRIPTION Q'TY P.F LOAD [VA]
FACTOR [VA]
C I
1 DB-N2 FOR 11kV SWGR ROOM 1 15,000 0.85 17,647 1.00 17,647

2 DB-NP2 FOR 11kV SWGR ROOM 1 14,000 0.85 16,471 0.50 8,235

3 16A TP W/P ISOLATOR FOR SUMP PUMP 1 1,500 0.85 1,765 0.20 353

4 63A TP INDUSTRIAL SOCKET OUTLET INSIDE OF 1 20,000 0.85 23,529 0.20 4,706
11kV SWGR ROOM

5 63A TP INDUSTRIAL SOCKET OUTLET AT 40MVA TR 1 20,000 0.85 23,529 0.20 4,706

6 63A TP INDUSTRIAL SOCKET OUTLET AT 200MVA TR 1 20,000 0.85 23,529 0.20 4,706

7 13A UNSWITCHED FUSE SPUR FOR FIRE ALARM 1 1,500 0.85 1,765 1.00 1,765
CONTROL PANEL

TOTAL MAXIMUM DEMAND LOAD(VA) 42,118

15 of 20
PH10-1C-10-60-C005_Rev.0
Appendix-1.7

LOAD LIST FED FROM SDB-N3

LOAD [W] DEMAND TOTAL LOAD


NO. LOAD DESCRIPTION Q'TY P.F LOAD [VA]
FACTOR [VA]
C I
1 DB-N3 FOR 66kV GIS ROOM 1 15,000 0.85 17,647 1.00 17,647

2 DB-NP3 FOR 66kV GIS ROOM 1 10,000 0.85 11,765 0.50 5,882

3 DB-PH 1 15,000 0.85 17,647 0.20 3,529

4 DB-GR 1 8,000 0.85 9,412 0.50 4,706

5 63A TP W/P ISOLATOR FOR CRANE 1 5,500 0.85 6,471 0.20 1,294

6 16A TP W/P ISOLATOR FOR SUMP PUMP 1 1,500 0.85 1,765 0.20 353

7 63A TP INDUSTRIAL SOCKET OUTLET INSIDE OF 1 20,000 0.85 23,529 0.20 4,706
66kV GIS ROOM

8 63A TP INDUSTRIAL SOCKET OUTLET AT 40MVA TR 1 20,000 0.85 23,529 0.20 4,706

9 63A TP INDUSTRIAL SOCKET OUTLET AT 40MVA TR 1 20,000 0.85 23,529 0.20 4,706

TOTAL MAXIMUM DEMAND LOAD(VA) 47,529

16 of 20
PH10-1C-10-60-C005_Rev.0
Appendix-1.7

LOAD LIST FED FROM SDB-N4

LOAD [W] DEMAND TOTAL LOAD


NO. LOAD DESCRIPTION Q'TY P.F LOAD [VA]
FACTOR [VA]
C I
1 DB-N4 FOR 220kV GIS ROOM 1 15,000 0.85 17,647 1.00 17,647

2 DB-NP4 FOR 220kV GIS ROOM 1 14,000 0.85 16,471 1.00 16,471

3 16A TP W/P ISOLATOR FOR SUMP PUMP 1 1,500 0.85 1,765 0.20 353

4 63A TP W/P ISOLATOR FOR CRANE 1 5,500 0.85 6,471 0.20 1,294

5 63A TP INDUSTRIAL SOCKET OUTLET INSIDE OF 1 20,000 0.85 23,529 0.20 4,706
220kV GIS ROOM

6 63A TP INDUSTRIAL SOCKET OUTLET AT SHUNT 1 20,000 0.85 23,529 0.20 4,706
REACTOR

7 63A TP INDUSTRIAL SOCKET OUTLET AT SHUNT 1 20,000 0.85 23,529 0.20 4,706
REACTOR

TOTAL MAXIMUM DEMAND LOAD(VA) 49,882

17 of 20
PH10-1C-10-60-C005_Rev.0
Appendix-1.7

LOAD LIST FED FROM ACCP-1

NO. LOAD DESCRIPTION Q'TY LOAD [W] DEMAND TOTAL LOAD


P.F LOAD [VA]
FACTOR [VA]
C I
1 PACU- 1 & 2 FIRST FLOOR MECHANICAL ROOM 1+1(*) 120,000 0.85 141,176 1.00 141,176

2 100A TP W/P ISOLATOR FOR HEATER BATTERY - 1 1 47,000 0.85 55,294 0.20 11,059

TOTAL MAXIMUM DEMAND LOAD 152,235

(*) 1+1: RUNNING + STAND BY

LOAD LIST FED FROM ACCP-3

NO. LOAD DESCRIPTION Q'TY LOAD [W] DEMAND TOTAL LOAD


P.F LOAD [VA]
FACTOR [VA]
C I
1 PACU- 3 & 4 FIRST FLOOR MECHANICAL ROOM 1+1(*) 140,000 0.85 164,706 1.00 164,706

2 100A TP W/P ISOLATOR FOR HEATER BATTERY -2 1 85,000 0.85 100,000 0.20 20,000

TOTAL MAXIMUM DEMAND LOAD 184,706

(*) 1+1: RUNNING + STAND BY

18 of 20
PH10-1C-10-60-C005_Rev.0
Appendix-1.8

LOAD LIST FED FROM ACCP-4

LOAD [W] DEMAND TOTAL LOAD


NO. LOAD DESCRIPTION Q'TY P.F LOAD [VA]
FACTOR [VA]
C I
1 40A TP W/P ISOLATOR FOR FAF-1 1 10,000 0.85 11,765 1.00 11,765

2 40A TP W/P ISOLATOR FOR FAF-2 1 10,000 0.85 11,765 1.00 11,765

3 16A TP W/P ISOLATOR FOR FAF-3 1 1,500 0.85 1,765 1.00 1,765

4 16A TP W/P ISOLATOR FOR FAF-4 1 1,500 0.85 1,765 1.00 1,765

5 40A TP W/P ISOLATOR FOR EF-1 1 10,000 0.85 11,765 1.00 11,765

6 40A TP W/P ISOLATOR FOR EF-2 1 10,000 0.85 11,765 1.00 11,765

7 10A DP W/P ISOLATOR FOR EF-5 1 500 0.85 588 1.00 588

8 10A DP W/P ISOLATOR FOR EF-6 1 500 0.85 588 1.00 588

9 10A DP W/P ISOLATOR FOR EF-7 1 500 0.85 588 1.00 588

10 10A DP W/P ISOLATOR FOR EF-8 1 500 0.85 588 1.00 588

TOTAL MAXIMUM DEMAND LOAD(VA) 52,941

19 of 20
PH10-1C-10-60-C005_Rev.0
Appendix-1.8

LOAD LIST FED FROM ACCP-5

LOAD [W] DEMAND TOTAL LOAD


NO. LOAD DESCRIPTION Q'TY P.F LOAD [VA]
FACTOR [VA]
C I
1 16A TP W/P ISOLATOR FOR EF-9 1 750 0.85 882 1.00 882

2 16A TP W/P ISOLATOR FOR EF-10 1 1,500 0.85 1,765 1.00 1,765

TOTAL MAXIMUM DEMAND LOAD(VA) 2,647

LOAD LIST FED FROM ACCP-6

LOAD [W] DEMAND TOTAL LOAD


NO. LOAD DESCRIPTION Q'TY P.F LOAD [VA]
FACTOR [VA]
C I
1 32A TP W/P ISOLATOR FOR SF-1 1 6,000 0.85 7,059 1.00 7,059

2 63A TP W/P ISOLATOR FOR SF-2 1 12,500 0.85 14,706 1.00 14,706

3 63A TP W/P ISOLATOR FOR SF-3 1 12,500 0.85 14,706 1.00 14,706

4 63A TP W/P ISOLATOR FOR SF-4 1 12,500 0.85 14,706 1.00 14,706

5 63A TP W/P ISOLATOR FOR SF-5 1 15,000 0.85 17,647 1.00 17,647

TOTAL MAXIMUM DEMAND LOAD(VA) 68,824