1. WATER SUPPLY
Tabel 1. Kebutuhan Air (l/min) Tunnel Simeme
= 264 l/min
= 0,1 x 720 = 72 m
= 5,924 m
H = (hf+hd)
= 5,928+10
= 15,928 m
= 15,928 x 2
q = 7 + (3,3x2) + (3x10)
= 43,60 m3/min
Q = q x C1 x C2
= 36,624 m3/min
4017𝑥1000 36,624/60
= 𝑥
7 10,𝑥531
= 0,659 kg/cm2
3. Electric Supply
Tabel 3. Kebutuhan Listrik (KW) Tunnel Simeme
Q = 200 + (2x1) + (3x3) + (2x1,5) + 3,7 + (2,2x2) + (240x0,04) + (2x0,5) + 2 + (2x37) + (2x10,5) + 1 +25
= 345,7 KW
Q1 = 345,7 x 1,20
= 414,84 KW
= 440,768 KVA
4. Ventilation System
Tabel 4. Perencanaan Ventilation System Tunnel Simeme
Kebutuhan Udara
1. Mucking = Q1+Q2+Q4 = 374,37+412,12+90 = 876,49 m3/min
2. Blasting = Q3+Q4 = 404,61+90 = 494,61 m3/min
3. Shotcrete = Q4+Q5 = 90+254 = 344 m3/min
876,49
= 600
(1−0,015)𝑥
100
= 959,68 m3/min