You are on page 1of 24

KEPERLUAN PIPA CONDUIT,KLEM SHOCK,FLEXIBLE,T-DUST,X-DUST,STAPING VISER 6MM/UNIT

No ITEM MATERIAL SATUANJUMLAH


Pipa Conduit 20mm btg 92
Klem Conduit 20mm bh 112
Shock Conduit 20mm bh 51
T-Dust Conduit 20mm bh 18
Cross -Dust Conduit 20mm bh 3
Flexible Conduit 20mm mtr 8
Staping iser 6mm pak 2
Inbowdust bh 18
Box MCB 6 Geng bh 1
Kabel NYA 1 X 2,5mm mtr 157.9

KEPERLUAN MATERIAL ELEKTRONIK

No ITEM PEKERJAAN SAT VOL

Keperluan material Tata Suara per lantai ( 2,3, ) di x 2 lantai


Kabel NYMHY 2 X 1,5mm mtr 741.9
Pipa Conduit 20mm btg 278
Flexible Conduit 20mm mtr 57
Shock Conduit 20mm bh 137
Staping Viser 6mm pak 6
T-Dust Conduit 20mm bh 70
Cross -Dust Conduit 20mm bh 28
Klem Conduit 20mm bh 725
Keperluan material Tata Suara per lantai ( 4,5,6, ) di x 3 lantai
Kabel NYMHY 2 X 2,5mm mtr 642.6
Pipa Conduit 20mm btg 234
Flexible Conduit 20mm mtr 45
Shock Conduit 20mm bh 99
Staping Viser 6mm pak 6
T-Dust Conduit 20mm bh 43
Cross -Dust Conduit 20mm bh 20
Klem Conduit 20mm bh 648
Keperluan material Tata Suara Tangga Kebakarn 1,2,3 ( di x 3 tangga )
Kabel FRC 2 X 1,5mm mtr 568.9
Pipa Conduit 20mm btg 225
Shock Conduit 20mm bh 108
Staping Viser 6mm pak 5
T-Dust Conduit 20mm bh 24
Klem Conduit 20mm bh 667

Keperluan Material CCTV Per lantai (lantai 1 )


Kabel Coaxial RG 11 mtr 333.5
Kabel NYA 3 X 2,5mm mtr 240.2
Pipa Conduit 25mm btg 115
Pipa Conduit 20mm ( u/kbel NYA ) btg 83
Shock Conduit 20mm ( u/kbel NYA ) bh 83
Flexible Conduit 20mm ( u/kbel NYA ) mtr 7
Klem Conduit 25mm bh 332
Shock Conduit 25mm bh 44
Flexible Conduit 25mm mtr 7
Connector RG 11 bh 7
Keperluan Material CCTV PERLANTAI ( lantai 2,3 ) di x 2 lantai
Kabel Coaxial RG 11 mtr 611
Kabel NYA 3 X 2,5mm mtr 175
Pipa Conduit 20mm ( u/kbel NYA ) btg 60
Pipa Conduit 25mm btg 211
Flexible Conduit 20mm mtr 5
Connector RG 11 bh 5
Flexible Conduit 25mm mtr 5
Keperluan material CCTV PerlaNTAI ( lantai 4,5,6 ) di x 3 lantai
Kabel Coaxial RG 11 mtr 631
Kabel NYA 3 X 2,5mm mtr 185
Pipa Conduit 20mm btg 64
Pipa Conduit 25mm btg 215
Flexible Conduit 20mm mtr 25
Flexible Conduit 25mm mtr 77
Shock Conduit 20mm bh 5
Shock Conduit 25mm bh 5
Connector RG 11 bh 5
Keperluan material MATV per lantai ( lantai 1 )
Kabel Coaxial RG 6 mtr 23.2
Kabel Coaxial RG 11 mtr 81.6
Pipa Conduit 20mm btg 8
Pipa Conduit 25mm btg 28
Shock Conduit 20mm bh 3
Shock Conduit 25mm bh 10
Flexible Conduit 20mm mtr 1
Flexible Conduit 25mm mtr 1
Spliter 2 way bh 3
Connector RG 6 bh 4
Connector RG 11 bh 2
Keperluan Material MATV per lantai ( lantai 2,3,4,5,6 ) di x 4 lantai
Kabel Coaxial RG 6 mtr 585
Kabel Coaxial RG 11 mtr 145.2
Pipa Conduit 20mm btg 202
Pipa Conduit 25mm btg 40
Shock Conduit 20mm bh 70
Shock Conduit 25mm bh 14
Klem Conduit 20mm bh 192
Flexible Conduit 20mm mtr 25
Flexible Conduit 25mm mtr 8
Spliter 2 way bh 2
Spliter 4 way bh 2
Spliter 5 way bh 2
Spliter 6 way bh 2
Connecor RG 6 bh 30
Connector RG 11 bh 14

Keperluan material Fire Alarm per lantai ( lantai 1 )


Kabel NYA 2 x 1,5mm mtr 943
Pipa Conduit 20mm btg 256
Shock Conduit 20mm bh 143
Flexible Conduit 20mm mtr 40
Klem Conduit 20mm bh 924
Staping Viser pak 19
T-dust Conduit 20mm bh 66
Cross dust Conduit 20mm bh 24
Jack Phone Hydrant ( kabel ITC 2 x 0,6 ) mtr 107.4
Resistor 10k/Ohm bh 8
Keperluan material Fire Alarm per lantai ( lantai 2,3 & BOH ) di x 2 lantai
Kabel NYA 2 x 1,5mm mtr 1162.7
Pipa Conduit 20mm btg 365
Shock Conduit 20mm bh 131
Flexible Conduit 20mm mtr 131
Klem Conduit 20mm bh 549
Staping Viser pak 13
T-dust Conduit 20mm bh 38
Cross dust Conduit 20mm bh 48
Indikator lamp ( kbel itc 2 x 0,6mm) mtr 300.9
Jack Phone Hydrant ( kabel ITC 2 x 0,6 ) mtr 95.4
Resistor 10k/Ohm bh 12
Keperluan material Fire Alarm per lantai ( 4,5,6 ) di x 3 lanatai
Kabel NYA 2 x 1,5mm mtr 937.9
Pipa Conduit 20mm btg 287
Shock Conduit 20mm bh 106
Flexible Conduit 20mm mtr 34
Klem Conduit 20mm bh 345
Staping Viser pak 8
T-dust Conduit 20mm bh 23
Cross dust Conduit 20mm bh 36
Indikator lamp ( kbel itc 2 x 0,6mm) mtr 300.9
Jack Phone Hydrant ( kabel ITC 2 x 0,6 ) mtr 95.4
Resistor 10k/Ohm bh 8
keperluan material Fire Alarm Tangga kebakaran 1,2,3 (di x 3 tangga )
Kabel FRC 2 x 1,5mm mtr 568.8
Pipa Conduit 20mm btg 230
Shock Conduit 20mm bh 108
Klem Conduit 20mm bh 697
Staping Viser pak 15
Resistor 10k/Ohm bh 3

Material Fire Fighthing (pipa BSCH Black Steel )

No ITEM MATERIAL SAT VOL


Material Fire Figthing Lantai 1
NG VISER 6MM/UNIT
KETERANGAN No
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit

JUMLAH

di x 2 lantai
di x 2 lantai
di x 2 lantai
di x 2 lantai
di x 2 lantai
di x 2 lantai
di x 2 lantai
di x 2 lantai

di x 3 lantai
di x 3 lantai
di x 3 lantai
di x 3 lantai
di x 3 lantai
di x 3 lantai
di x 3 lantai
di x 3 lantai
( 6 Zone + flowswith + Hydrant )
JUMLAH
BQ ELEKTRONIK & ELEKTRIKAL
ITEM PEKERJAAN SAT VOL
pekerjaan instalasi fire Alarm lt 1 & BOH
Instalasi Head Detector Bedroom, Room Boy & Koridor Kabel NYA 2 x 1,5mm ttk 33
Instalasi Flow swith ( NYA 2 x 1,5mm ) ttk 1
Instalasi pusbotton & bell Hydrant ( NYA 2 x 1,5mm ) ttk 2
Instalasi JackPhone Hydrant ( Kabel ITC 2 x 0,6mm ) ttk 2
Instalasi kabel FRC 2 x 1,5mm tangga kebakaran 1,2,3 ttk 21
Instalasi kbl Twist Sheild AWG 18,FRC 2 x 1 x 1,5mm ITC 2 x 0,6mm dr R,kontrl ke TBFA lt 1 mtr
Instalasi kbl Twist Sheild AWG 18,FRC 2 x 1 x 1,5mm ITC 2 x 0,6mm dr TBFA lt 1 ke Ruko 1,2 M,market , GM mtr
Instalasi kbl Twist sheild AWG 18,FRC 2 x 1 x 1,5mm Ruang kntrl ke TBFA lt 7 mtr
Instalasi Kabel ITC 2 x 0,6mm dari TBFA lt 1 ke TBFA lt 2 mtr
Asesoris ttk 1
pekerjaan instalasi Tata suara lt 1
instalasi kabel NYMHY 2 x 1,5mm ttk 17
Instalasi Kabel 5x NYMHY 3(2 x 1,5mm)ruko 1, 2,M.market mtr
Instalasi COS ttk 4
Instalasi Volume Control ttk 1
Instalasi kabel 5x NYMHY 3(2 x 1,5mm) dari Ruang kontrol ke lt 3 mtr
Instalasi Kabel 5x NYMHY 3(2 x 1,5mm) dari Ruang kontrol ke lt 5 mtr
Instalasi kabel FRC 2 x 1,5mm tangga kebakaran 1,2,3 ttk 21
Asesoris lot 1
pekerjaan Instalasi CCTV lantai 1
Instalasi Kabel RG 11 ttk 10
Instalasi kabel NYA 2 X 2,5mm Power CCCTV ttk 10
Asesoris lot 1
pekerjaan Instalasi MATV lantai 1
Instalasi Kabel Coaxial RG 6 ttk 2
Instalasi Kabel Coaxial RG 11 Line ke lt 2 mtr 81.6
Asesoris + Spliter lot 1
Pekerjaan Instalasi Telepon lt 1
Instalasi Kabel ITC 2 x 0,6 ( smua line ) ttk 28
Instalasi Kabel ITC 2 x 0,6 Ruko 1,2 & mini market ttk 9
Instalasi Kabel ITC 6 x 2 x 0,6mm ( Ruko 1 ) mtr 57
Instalasi Kabel ITC 3 x 2 x 0,6 ( 2x ) Ruko 2 & M.market mtr 68
Asesoris ttk 1
Pekerjaa Elektrikal lantai 1
Instalasi penerangan Kabel NYA 2 x 2,5mm ttk
Instalasi stop kontak ttk
Instalasi Exhaust Fan kabel NYA 3 x 2,5mm BOH lt 1 ttk
Instalasi AC Kabel NYA 3 x 2,5mm BOH lt 1 ttk 26
Instalasi kabel FRC 2 x 1,5mm tangga kebakaran 1,2,3 ttk 48
Asesoris lot 1
Pekerjaan Instalasi Fire Alarm lt 2 & BOH
Instalasi Head Detector Bedroom,Room Boy,R,Panel & Koridor Kabel NYA 2 X 1,5mm ttk 51
Instalasi indikator lamp kabel Itc 2 X 0,6 Bed room & Room Boy ttk 34
Instalasi Flow swith ( NYA 2 x 1,5mm ) ttk 1
Instalasi pusbotton & bell Hydrant ( NYA 2 x 1,5mm ) ttk 2
Instalasi JackPhone Hydrant ( Kabel ITC 2 x 0,6mm ) ttk 2
Instalasi Kabel Twist shielded AWG 18 & FRC 2 x 1 x 2,5mm Line dari lt 2 ke lt 3 mtr
Instalasi Kabel ITC 2 x 0,6mm Line dari lt 2 ke lt 3 mtr
Asesoris lot 1
Pekerjaan instalasi Tata suara lt 12 & BOH
instalasi kabel NYMHY 2 x 1,5mm ttk 56
Instalasi Kabel 5x NYHYM 3(2 x 1,5) 5x ( line T B) mtr 13.2
Asesoris lot 1
Pekerjaan Instalasi CCTV lantai 2 & BOH
Instalasi Kabel RG 11 ttk 7
Asesoris lot 1
Pekerjaan MATV lantai 2
Instalasi Kabel Coaxial RG 6 ttk 30
Instalasi Kabel Coaxial RG 11 mtr 145.2
Asesoris + Spliter lot 1
Pekerjaan Instalasi Telepon lt 2 & BOH
Instalasi kabel ITC 2 x 0,6mm Bedroom & Room Boy ,BOH ttk 36
Asesoris lot 1
Pekerjaan Instalasi Elektrikal lantai 2 & BOH
Instalasi penerangan Bedroom,Room Boy, koridor,usollah,& GYM kabel NYA 3 x 2,5mm ttk 388
Instalasi stop kontak BedRoom, koridor & R,Panel,Musollah & GYM kabel NYA 3 x 2,5mm ttk 24
Instalasi AC BedRoom Kabel NYA 3 x 2,5mm ttk 32
Instalasi Exshaust Fan Toilet Bedroom & BOH Kabel NYA 3 x 2,5mm ttk 34
Instalasi Bel Bedroom Kabel NYA 3 x 2,5mm ttk 30
Instalasi Line BedRoom kabel NYM 3 x 2,5mm mtr 1525
Instalasi lampu EXIT kabel NYA 3 X 2,5mm ttk 4
Instalasi Penerangan BOH & koridor BOH kabel NYA 3 x 2,5mm ttk 33
Instalasi Stop kontak BOH & Koridor BOH kabel NYA 3 x 2,5mm ttk 9
Instalasi AC BOH kabel NYA 3 X 2,5mm ttk 5
Asesoris ttk 1
pekerjaan Instalasi Fire Alarm Lantai 3 & BOH
Instalasi Head Detector Bedroom & Koridor Kabel NYA 2 X 1,5mm ttk 51
Instalasi indikator lamp kabel Itc 2 X 0,6 Bed room & Room Boy ttk 34
Instalasi Flow swith ( NYA 2 x 1,5mm ) ttk 1
Instalasi pusbotton & bell Hydrant ( NYA 2 x 1,5mm ) ttk 2
Instalasi JackPhone Hydrant ( Kabel ITC 2 x 0,6mm ) ttk 2
Instalasi Kabel twist shelded,FRC 2 x 1,5mm Line dari lt 3 ke lt 4 mtr
Instalasi Kabel ITC 2 x 0,6mm Line dari lt 3 ke lt 4 mtr
Asesoris lot 1
Pekerjaan Instalasi Tata suara lantai 3 & BOH
instalasi kabel NYMHY 2 x 1,5mm Bedroom,Koridor & BOH ttk 56
Instalasi Kabel 5x NYMHY 3(2 x 1,5mm) Line TB mtr
Asesoris lot 1
Pekerjaan Instalasi CCTV lantai 3 & BOH
Instalasi Kabel RG 11 ttk 7
Instalasi kabel NYA 2 X 2,5mm Power CCCTV ttk 7
Asesoris lot 1
Pekerjaan Instalasi MATV lantai 3
Instalasi Kabel Coaxial RG 6 ttk 32
Instalasi Kabel Coaxial RG 11 mtr 145.2
Asesoris + Spliter lot 1
pekerjaan Instalasi Telapon lantai 3 & BOH
Instalasi kabel ITC 2 x 0,6mm Bedroom & Room Boy ttk 46
Instalasi Line kabel Itc mtr
Asesoris lot 1
Pekerjaan Elektrikal lantai 3 & BOH
Instalasi penerangan Bedroom,Room Boy, koridor & R.Panel kabel NYA 3 x 2,5mm ttk 383
Instalasi stop kontak BedRoom,Room Boy,R.Panel & koridor kabel NYA 3 x 2,5mm ttk 20
Instalasi AC BedRoom Kabel NYA 3 x 2,5mm ttk 32
Instalasi Exshaust Fan Toilet Bedroom Kabel NYA 3 x 2,5mm ttk 62
Instalasi Bel Bedroom Kabel NYA 3 x 2,5mm ttk 30
Instalasi lampu EXIT kabel NYA 3 X 2,5mm ttk 4
Instalasi Line BedRoom kabel NYM 3 x 2,5mm mtr 1525
Instalasi Penerangan BOH & koridor BOH kabel NYA 3 x 2,5mm ttk 33
Instalasi Stop kontak BOH & Koridor BOH kabel NYA 3 x 2,5mm ttk 13
Instalasi AC BOH kabel NYA 3 X 2,5mm mtr 5
Asesoris lot 1
Pekerjaan Instalasi Fire Alarm lantai 4
Instalasi Head Detector Bedroom,Room Boy,R,Panel & Koridor Kabel NYA 2 X 1,5mm ttk 49
Instalasi Kabel ITC 2 x 0,6mm indikator lamp Bedroom & Room Boy ttk 31
Instalasi Flowswith sprinkler ttk 1
Instalasi pusbotton & bell Hydrant ( NYA 2 x 1,5mm ) ttk 2
Instalasi JackPhone Hydrant ( Kabel ITC 2 x 0,6mm ) ttk 2
Asesoris lot 1
Pekerjaan Instalasi Tata suara lantai 4
instalasi kabel NYMHY 2 x 1,5mm ttk 49
Instalasi Kabel 5x NYMHY 3(2 x 1,5mm) Line TB ttk
Asesoris lot 1
Pekerjaan Instalasi CCTV lantai 4
Instalasi kabel Coaxial RG 11 ttk 7
Instalasi kabel NYA 2 X 2,5mm Power CCCTV ttk 4
Asesoris lot 1
Pekerjaan Instalasi MATV lantai 4
Instalasi kabel Coaxial RG 6 ttk 32
Instalasi kabel Coaxial RG 11 mtr 81.6
Asesoris lot 1
Pekerjaan Instalasi Telepon lantai 4
Instalasi kabel ITC 2 x 0,6mm Bedroom & Room Boy ttk 32
Instalasi Line kabel Itc mtr
Asesoris lot 1
Pekerjaan Instalasi Elekatrikal lantai 4
Instalasi Penerangan Bedroom,Room Boy,k0ridor & R,Panel Kabel NYA 3 X 2,5mm ttk 383
Instalasi Stop Kontak Bed Room,Room Boy,Koridor,R.Panel Kabel NYA 3 X 2,5mm ttk 20
Instalasi AC BedRoom Kabel NYA 3 x 2,5mm ttk 32
Instalasi Exshaust Fan Toilet Bedroom Kabel NYA 3 x 2,5mm ttk 32
Instalasi Bel Bedroom Kabel NYA 3 x 2,5mm ttk 30
Instalasi stop kontak BedRoom & koridor kabel NYA 3 x 2,5mm ttk 18
Instalasi Line BedRoom kabel NYM 3 x 2,5mm mtr 1526
Instalasi lampu EXIT kabel NYA 3 X 2,5mm ttk 4
Asesoris lot 1
Pekerjaan Instalasi Fire Alarm lantai 5
Instalasi Head Detector Bedroom,Room Boy,R,Panel & koridor Kabel NYA 2 X 1,5mm ttk 49
Instalasi kabel ITC 2 X 0,6mm indikator lamp Bedroom & Rom Boy ttk 31
Instalasi Flow swith ( NYA 2 x 1,5mm ) ttk 1
Instalasi pusbotton & bell Hydrant ( NYA 2 x 1,5mm ) ttk 2
Instalasi JackPhone Hydrant ( Kabel ITC 2 x 0,6mm ) ttk 2
Instalasi kabel twist shelded,FRC 2 x 1,5mm Line dari lt 4 ke lt 5 mtr
Instalasi kabel ITC 2 x 0,6mm Line dari lt 4 ke lt 5 mtr
Asesoris lot 1
Pekerjaan Instalasi Tata suara lantai 5
instalasi kabel NYMHY 2 x 1,5mm ttk 49
Instalasi 5x NYMHY 3(2 x 1,5mm ( Line TB ) mtr
Asesoris lot 1
Pekerjaan Instalasi CCTV lantai 5
Instalasi kabel Coaxial RG 11 ttk 4
Instalasi kabel NYA 2 X 2,5mm Power CCCTV ttk 4
Asespris lot 4
Pekerjaa Instalasi MATV lantai 5
Instalasi Kabel Coaxial RG 6 ttk 32
Instalasi Kabel Coaxial RG 11 Line mtr 103.4
Asesoris + Spliter lot 1
Pekerjaan Instalasi Telepon lantai 5
Instalasi kabel ITC 2 x 0,6mm Bedroom & Room Boy ttk 32
Instalasi Line mtr
Asesoris lot 1
Pekerjaan Instalasi Elektrikal lantai 5
Instalasi penerangan Bedroom,Room Boy,koridor & R.Panel kabel NYA 3 x 2,5mm ttk 383
Instalasi Stop Kontak Bedroom,Room Boy,Koridor & R,Panel Kabel NYA 3 x 2,5mm ttk 20
Instalasi AC BedRoom Kabel NYA 3 x 2,5mm ttk 32
Instalasi Exhaust Fan Toilet Bedroom kabel NYA 3 x 2,5mm BOH lt 1 ttk 32
Instalasi Line BedRoom kabel NYM 3 x 2,5mm ttk 1526
Asesoris lot 1
Pekerjaan Instalasi Fire Alarm lantai 6
Instalasi Head Detector Kabel NYA 2 X 1,5mm Bedroom,Room Boy,R.Panel & koridor ttk 32
Instalasi kabel ITC 2 X 0,6mm indikator lamp Bedroom & Rom Boy ttk 31
Asesoris lot 1
Pekerjaan Tata Suara lantai 6
Instalasi Kabel NYMHY 2 x 1,5mm Bedroom,Room Boy & Koridor ttk 49
Instalasi Kabel 5x NYMHY 3(2 x 1,5mm) Line TB mtr
Asesoris lot 1
Pekerjaan Instalasi CCTV lantai 6
Instalasi kabel Coaxial RG 6 ttk 7
Instalasi NYA 3 x 1,5mm Power CCTV ttk 7
Asesoris + Spliter lot 1
Pekerjaan Instalasi MATV lantai 6
Instalasi Kabel RG 6 ttk 32
Instalasi Kabel RG 11 Line mtr 81.6
Asesoris + Spliter lot 1
Pekerjaan Instalasi Telepon lantai 6
Instalasi Kabel ITC 2 x 0,6mm ttk 32
Instalasi Kabel Line mtr
Asesoris lot 1
Pekerjaan Instalasi Elektrikal lantai 6
Instalasi penerangan Bedroom,Room Boy,koridor & R.Panel kabel NYA 3 x 2,5mm ttk 383
Instalasi Stop Kontak Bedroom,Room Boy,Koridor & R,Panel Kabel NYA 3 x 2,5mm ttk 20
Instalasi Exhaust Fan Toilet Bedroom kabel NYA 3 x 2,5mm BOH lt 1 ttk 32
Instalasi AC BedRoom Kabel NYA 3 x 2,5mm ttk 32
Instali Line Bedroom kabel NYM 3 x 2,5mm ttk 1526
Asesoris lot 1
HRG SAT JMLH