You are on page 1of 4

JOB HAZARD ANALYSIS [JHA] WORKSHEET

COLD WORK
JHA No PTW No Work Permit Type
PLATFORM SPECIFIC
FACILITY LOCATION Samarang
WORKSTATION
PDG-01
EQUIPMENT NO. WORK DESCRIPTION
NOTE
1. JHA shall be applied for all work activities which required PTW
2. Personnel carrying out the work shall be fully familiar with the written work / operating procedures develop for the job. The work / operating procedures shall describe, in step-by-step instructions, the correct method
of executing the specified work.
3. Prior to commencement of work, the task specific JHA shall be discussed amongst all personnel involved in the execution; and requirements contained shall be fully understood and agreed by all involved personnel.

JOB
DESCRIPTION OF JOB POTENTIAL POTENTIAL ACTION ACTION
STE CONTROL BARRIERS RECOVERY BARRIERS
STEP HAZARD CONSEQUENCES
P PARTY PARTY
1 Obtain all necessary High noise Miscommunication Obtain information from the drilling Jazlan Review JHA with all involved All party
work permits from rig & contractor and operator on Permit crew during PJSM in dual Involved
platform prior to start Hazard Damage to equipment to Work requirements. language. Bahasa and English
the job
Unplanned Personal injuries Complete and activate permit before
simultaneous commencing work. Sign on log
operation Unaware of existing or book.
potential hazards.
Meeting to be done at a safe area
with limited noise

2 General Surface Dropped objects. The equipment dropped If possible cover the grating Najib First aid / Medical treatment. Medic,
Equipment handling Work may be and cause fatality/damage beneath the work area with a drop First Aid
Laptop/Tools/Pumps performed over to personnel & facility cloth. Double confirm on the SLB PDG
gratings leading to clearance of the escape route.
dropped hand tools Injury to the Stop outside operations during bad
and small parts. fingers/hands, becoming weather to prevent risk to
pinched, cut or punctured. equipment and personnel
Weather, wet work
environment may
result in equipment Use proper manual handling
damage. techniques always.

Slip and trip Wear appropriate PPE


hazards around
work area.

Internal
Page 1
Heavy and Simops – discuss with area
oversized items – authority and raise a permit if
physical strain required

3 Work with electrical Personnel Injury Najib First aid / Medical treatment. SLB PDG
cables/ Control line Slips, trips and
falls Damage to cable Double confirm on the Medic, First Aid
All cables to be installed properly clearance of the escape route.
Pinch point Certified personnel to lay cable tie
the cable/ control line
Incompetent Use proper manual handling
Personnel Hand Injury techniques always

Sim-ops – discuss with area


authority and raise a permit if
required

Wear appropriate PPE

4 Terminate cable at the Sharp Object Injury to hand, Use the right procedure Najib, jazlan First aid / Medical treatment Medic, First Aid
back and front of ,SLB PDG
acquisition Unit Pinch point Personnel injury Aware of pinch point area Double confirm on the
clearance of the escape route.
Slip and Trip Damage to equipment
Use hand glove impact glove. Spare equipment
Incompetent
personnel

5 Terminate cable at Improper Equipment damage Use procedure to perform task Jazlan First aid, Medic, First Aid
Cabinet Rack installation. SLB PDG
Finger injury Use hand glove Spare equipment
Pinch point.

Sharp object Aware of pinch point area

Incompetent
personnel

6 Power up Incompetent Damage to equipment Certified personnel to operate the Najib Spare equipment SLB PDG
Gauge/Acquisition Unit personnel equipment

Follow the procedure to operate the


equipment

Internal
Page 2
7 Using laptop and Incompetent Damage to equipment Certified personnel to operate the Najib Spare equipment SLB PDG
software personnel equipment

Follow the procedure to operate the


equipment

8 Housekeeping Slips, trips, falls. Body Injuries Ensure all the area being left in Najib, Jazlan First aid / Medical treatment Medic, First Aid
proper and no any obstacle on the Adequate supervision by SLB PDG
Pinch points Finger/hand injuries walkway. supervisor.
If work at night, ensure
Hands and finger placement enough light & visibility.
awareness

Be aware of surroundings

Wear appropriate PPE to prevent


finger injuries.

9 Closing/Suspending the Miscommunication Confusion during Close the PTW just after finishing all Jazlan Inform PCSB rep/ Sapura rep All party
PTW emergency the job. Sign off the log book

Internal
Page 3
JHA APPROVAL DURING PTW APPLICATION

REVIEWED BY APPROVED BY
NAME NAME

DESIGNATION WORK LEADER DESIGNATIO PRODUCTION SUPERVISOR /MAITENANCE SUPERVISOR


N /BASE SUPERVISOR/FUNCTIONAL SUPERVISOR
SIGNATURE SIGNATURE

DATE DATE

AFTER PTW HAS BEEN APPROVED


WORK TEAM (CONFIRMATION THAT JHA HAS BEEN COMMUNICATED TO WORK TEAM AS PART OF PRE_JOB/TOOLBOX MEETING _ AFTER PTW HAS BEEN
APPROVED)

Name Designat Signat Signat Signat Signat Signat Signat Signat Name Designati Signat Signat Signat Signat Signat Signat Signat
(S) ion ure ure ure ure ure ure ure (S) on ure ure ure ure ure ure ure

Internal
Page 4

You might also like