Description:
Labeling inspection on exposed steel conduits for Lighting System at Zone M 2nd Floor, between
21)/(M-P.5) excluding toilets,IDF room,Stair M2 and Stair M3, as per highlighted area on attache
drawings.
Attachments:
2 sketch of A3 size.
We certify that the above items have been coordinated by the following Subcontractors:
All requests must be submitted at least 24 hours prior to the required inspection and approval.
Consultant's Comments:
Consultant Date:
Permission to proceed shall not constutitue acceptance or approval of Design Details, Calculations, Analyses, Test Methods, Materials, Work in Progr
Methods developed or selected by the contractor and shall not relieve contractor from full compliance with contract documents