NEW JET PROPULSION CENTER - PROJECT

INSPECTION REQUEST FORM


IRF# E-EL-0389
CONTRACTOR : FREYSSINET SAUDI ARABIA
PACKAGE TITLE Lighting System
PACKAGE NO.:

TO: GHAFARI LLC Date 2-Dec-17


The following items are ready for your inspection on (Date): 3-Dec-17 at (time):
LOCATION: JPC Job Site LEVEL: 2F AXIS:
DRAWING REF: Attached

Description:

Labeling inspection on exposed steel conduits for Lighting System at Zone M 2nd Floor, between
21)/(M-P.5) excluding toilets,IDF room,Stair M2 and Stair M3, as per highlighted area on attache
drawings.

Attachments:
2 sketch of A3 size.

We certify that the above items have been coordinated by the following Subcontractors:

Electrical Mechanical Elevators Others

All requests must be submitted at least 24 hours prior to the required inspection and approval.

Contractor Site Engineer Project Manager

Received Date Time Consultant's Signature

Consultant's Comments:

Consultant Date:

Received Date Time Contractor's Rep.

Distribution: Original to Contractor

Permission to proceed shall not constutitue acceptance or approval of Design Details, Calculations, Analyses, Test Methods, Materials, Work in Progr
Methods developed or selected by the contractor and shall not relieve contractor from full compliance with contract documents

FSA - QF001
PULSION CENTER - PROJECT

3:00 PM
(15-21)/(M-P.5)

duits for Lighting System at Zone M 2nd Floor, between axis(15-


ir M2 and Stair M3, as per highlighted area on attached

sign Details, Calculations, Analyses, Test Methods, Materials, Work in Progress, Means and
tractor from full compliance with contract documents

FSA - QF001

You might also like