You are on page 1of 8

Daily Issued Concrete from Batching plan BTR 2018

Date Lokasi Volume Presure No Truck


NO
1 9/18/2018 Workshop Construction 2M³ 15 MPA Mixer LT 03
2 9/19/2018 Kitchen Messhall 2M³ 20 MPA Mixer LT 03
3 9/19/2018 Kitchen Messhall 1M³ 20 MPA Mixer LT 03
4 9/21/2018 Workshop Construction 1M³ 20MPA Mixer LT 03
5 9/21/2018 Kitchen Messhall 2M³ 20MPA Mixer LT 03
6 10/3/2018 Carpenter Workshop 1,5M³ 20MPA Mixer LT 03
7 10/3/2018 Kamar Mandi Camp WB 1,5M³ 20MPA Mixer LT 03
8 10/3/2018 Kamar Mandi Camp WB 1,5M³ 20MPA Mixer LT 03
9 10/3/2018 Carpenter Workshop 2M³ 20MPA Mixer LT 03
10 10/26/2018 Pondasi Tower 1.5M³ 25MPA Mixer LT 03
11 10/26/2018 Pondasi Tower 2M³ 25MPA Mixer LT 05
12 10/12/2018 Slab Masjid MIA 10M³ 20MPA Mixer LT 03
13 11/21/2018 Slab Masjid MIA 1M³ 20MPA Mixer LT 03
14 11/21/2018 Slab Masjid MIA 1M³ 20MPA Mixer LT 04
15 11/21/2018 Slab Masjid MIA 1.5M³ 20MPA Mixer LT 04
16 11/21/2018 Slab Masjid MIA 1.5M³ 20MPA Mixer LT 05
17 11/21/2018 Slab Masjid MIA 1.5M³ 20MPA Mixer LT 04
18 11/21/2018 Slab Masjid MIA 1M³ 20MPA Mixer LT 05
19 11/21/2018 Slab Masjid MIA 1.5M³ 20MPA Mixer LT 05
20 11/21/2018 Slab Masjid MIA 1.5M³ 20MPA Mixer LT 04
21 11/21/2018 Slab Masjid MIA 1.5M³ 20MPA Mixer LT 03
22 11/21/2018 Slab Masjid MIA 1.5M³ 20MPA Mixer LT 05
23 11/21/2018 Slab Masjid MIA 1.5M³ 20MPA Mixer LT 04
24 11/21/2018 Slab Masjid MIA 1.5M³ 20MPA Mixer LT 03
25 11/21/2018 Slab Masjid MIA 1.5M³ 20MPA Mixer LT 05
26 11/21/2018 Slab Masjid MIA 1.5M³ 20MPA Mixer LT 03
27 11/21/2018 Slab Masjid MIA 1.5M³ 20MPA Mixer LT 03
28 11/21/2018 Slab Masjid MIA 1.5M³ 20MPA Mixer LT 05
29 11/21/2018 Slab Masjid MIA 1.5M³ 20MPA Mixer LT 03
30 11/21/2018 Slab Masjid MIA 1.5M³ 20MPA Mixer LT 05
31 11/21/2018 Slab Masjid MIA 1.5M³ 20MPA Mixer LT 04
32 11/21/2018 Slab Masjid MIA 1.5M³ 20MPA Mixer LT 03
33 11/21/2018 Slab Masjid MIA 1.5M³ 20MPA Mixer LT 05
34 11/21/2018 Slab Masjid MIA 1.5M³ 20MPA Mixer LT 03
35 11/21/2018 Slab Masjid MIA 1.5M³ 20MPA Mixer LT 04
36 11/28/2018 Genset Shelter 1.5M³ 20MPA Mixer LT 04
37 11/28/2018 Genset Shelter 1.5M³ 20MPA Mixer LT 04
38 11/28/2018 Genset Shelter 1.5M³ 20MPA Mixer LT 04
39 11/28/2018 Genset Shelter 1.5M³ 20MPA Mixer LT 04
40 11/28/2018 Genset Shelter 1.5M³ 20MPA Mixer LT 04
41 11/28/2018 Genset Shelter 1.5M³ 20MPA Mixer LT 04
42 11/28/2018 Genset Shelter 1.5M³ 20MPA Mixer LT 04
43 11/28/2018 Genset Shelter 1.5M³ 20MPA Mixer LT 04
44 11/28/2018 Genset Shelter 1.5M³ 20MPA Mixer LT 04
45 11/28/2018 Genset Shelter 1.5M³ 20MPA Mixer LT 04
46 11/30/2018 Lab MIA 1.5M³ 20MPA Mixer LT 04
47 11/30/2018 Lab MIA 1.5M³ 20MPA Mixer LT 05
48 11/30/2018 Lab MIA 1.5M³ 20MPA Mixer LT 03
49 11/30/2018 Lab MIA 1.5M³ 20MPA Mixer LT 04
50 12/1/2018 Lab MIA 1.5M³ 20MPA Mixer LT 04
51 12/1/2018 Lab MIA 1.5M³ 20MPA Mixer LT 05
52 12/1/2018 Lab MIA 1.5M³ 20MPA Mixer LT 03
53 12/1/2018 Lab MIA 1.5M³ 20MPA Mixer LT 04
54 12/1/2018 Lab MIA 1.5M³ 20MPA Mixer LT 05
55 12/1/2018 Lab MIA 1.5M³ 20MPA Mixer LT 03
56 12/1/2018 Lab MIA 1.5M³ 20MPA Mixer LT 04
57 12/1/2018 Lab MIA 1.5M³ 20MPA Mixer LT 05
58 12/1/2018 Lab MIA 1.5M³ 20MPA Mixer LT 03
59 12/1/2018 Lab MIA 1.5M³ 20MPA Mixer LT 05
60 12/1/2018 Lab MIA 1.5M³ 20MPA Mixer LT 03
61 12/4/2018 Kali koreng 24.M 32MPA Mixer LT 03
62 12/5/2018 Kali koreng 2M 32MPA Mixer LT 04
63 12/6/2018 Kali koreng 2M 32MPA Mixer LT 04
64 12/6/2018 Kali koreng 2M 32MPA Mixer LT 04
65 12/6/2018 Kali koreng 2M 32MPA Mixer LT 03
66 12/8/2018 MIA 1.5M³ 20MPA Mixer LT05
67 12/8/2018 Office mia 1.5M³ 20MPA Mixer LT 03
68 12/8/2018 Office mia 1.5M³ 20MPA Mixer LT 04
69 12/17/2018 Kali koreng 2M 32MPA Mixer LT 04
70 12/17/2018 Kali koreng 2M 32MPA Mixer LT 03
71 12/17/2018 Kali koreng 2.5M 32MPA Mixer LT 05
72 12/17/2018 Kali koreng 2M 32MPA Mixer LT 04
73 12/17/2018 Kali koreng 2M 32MPA Mixer LT 03
74 12/17/2018 Kali koreng 2M 32MPA Mixer LT 04
75 12/17/2018 Kali koreng 2M 32MPA Mixer LT 05
76 12/17/2018 Kali koreng 2M 32MPA Mixer LT 04
77 12/17/2018 Kali koreng 2M 32MPA Mixer LT 05
78 12/17/2018 Kali koreng 2M 32MPA Mixer LT 05
79 12/17/2018 Kali koreng 2M 32MPA Mixer LT 04
80 12/20/2018 Lerokis 13M 20MPA
81 12/26/2018 Mia 0ffice 1.5M³ 20MPA
82 12/28/2018 Mia 0ffice 1.5M³ 20MPA
83 12/29/2018 Magazine 5M 7MPA
84 12/29/2018 Kali koreng 3.8M 20MPA
85 12/30/2018 Mia 0ffice 1.5M³ 20MPA Mixer LT 04
86 12/30/2018 1.5M³ 20MPA Mixer LT 05
87 12/31/2018 kelapa 3 1.5M³ 32MPA mixer LT 03
1/5/2019 Box Culvert 1.8 m3 32
1/21/2019 Tower 2.6 m3
1/31/2019 Wokrshop 9.5 m3
1/28/2019 Box Culvert 38 m3
26 des workshop 4.5 m3
20 des qc lab 13 m3
24 des Box Culvert 3 m3
1/4/2019 workshop 1.5 m3
31 des Box Culvert 1.5 m3
n BTR 2018

Operator Batching Plan Requestor Dept Cost Code


Sudirman Maxi R M Construction
Sudirman Maxi R M Construction CEA02637
Sudirman Maxi R M Construction CEA02637
Sudirman Maxi R M Construction LAB
Sudirman Maxi R M Construction CEA02637
Leonard Maxi R M Construction Warehouse
Leonard Maxi R M Construction CEA02637
Leonard Maxi R M Construction CEA02637
Leonard Maxi R M Construction Workshop
Biyanto Maxi R M Construction
Biyanto Maxi R M Construction
Sudirman Sundono Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Maxi R M Construction
Sudirman Daniel.M Construction
Sudirman Daniel.M Construction
Sudirman Daniel.M Construction
Sudirman Daniel.M Construction
Sudirman Daniel.M Construction
Sudirman Daniel.M Construction
Sudirman Maxi R M Construction
Sudirman Daniel.M Construction
Sudirman Arham Construction
Sudirman Arham Construction
Sudirman Arham Construction
Sudirman Arham Construction
Sudirman Arham Construction
Sudirman Arham Construction
Sudirman Arham Construction
Sudirman Arham Construction
Sudirman Arham Construction
Sudirman Arham Construction
Sudirman Arham Construction
Sudirman Nenda Construction
Sudirman Zainudin Construction
Sudirman Zainudin Construction
Sudirman Zainudin Construction
Sudirman Zainudin Construction
Sudirman Zainudin Construction
Sudirman Zainudin Construction
Sudirman Paulus Construction
Daily Issued Concrete from Batching plan BTR 2019

Date Lokasi Volume Presure No Truck


NO
1 1/2/2019 Magazine 2M 25MPA Mixer LT 03
2 1/3/2019 kelapa 3 1M³ 15MPA Mixer LT 03
n BTR 2019

Operator Batching Plan Requestor Dept Cost Code


Sudirman Maxi Construction
Sudirman Maxi Construction

You might also like