Saudi Aramco 2616-ENG (11/99)

OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENGG CERT

CATHODIC PROTECTION MATERIALS


INSPECTION AND TEST PLAN (FAT)
JP
ISSUED FOR APPROVAL
DESCRIPTION

Project:
SALES GAS METERING SYSTEM FOR BEEA'H

Client:
JO/EWO
21-00080
15-DEC-16 -0001
DATE
REV
NO

DISCIPLINE
SAUDI ARABIAN OIL COMPANY
ENGINEER
_________
DATE: _______
PROJECT
ENGINEER
Contractor:
DATE:________
CERTIFIED GAS Arabian Services Co. Ltd.
_______________
P.O. Box 3422, Dammam 31471
DATE:__________ Kingdom of Saudi Arabia
CONSTRUCTION
AGENCY
_______________
DATE:_________
OPERATIONS CP Contractor:
_______________
DATE: Corrpro Arabia Cathodic Protection Co. Ltd.
P.O. Box 32444, Al-Khobar 31952
CONTROL NUMBER
VERIFICATION

Kingdom of Saudi Arabia


EDSD

DATE:
BY:
BY DRAWING COMPLETION CERTIFICATE (DCC)
REVISION CERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL
THIS INDICATES THAT REV.NO.

CATHODIC PROTECTION SYSTEM DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

INSPECTION AND TEST PLAN (FAT) DOC 1


E74 X RE-286329 of
BJBFG-1 PIPELINE JUBAIL SECOND INDUSTRIAL CITY A
1
NO. :

JUBAIL SAUDI ARABIA JO/EWO: 21-00080-0001


Corrpro Arabia Job # 2016-I-020
Inspection Level: 2

Factory Inspection and Test Plan (ITP)


For Galvanic Anode with Cable

SURVEILLANCE/ INSPECTION
DOCUMENT ACCEPTANCE VERIFYING
No INSPECTION ACTIVITIES
REFERENCE CRITERIA DOCUMENT
Corrpro Gas
Aramco
Arabia Arabian/3P
Pre-Fabrication/Production
1
Requirements
Supplier’s Test
17-SAMSS-006 Approved Project
a) Material Test Certificate Certificate, R R R
Section 6.2 Drawings
IR171300
Corrpro QC Test
Approved Project
b) Anode Dimensions Compliance Report/Complian H R R
Drawings
ce Certificate
In Process Inspection &
2
Test Requirements
a) Chemical Analysis, Supplier’s Test
17-SAMSS-006 Approved Project
Open Circuit Potential and Certificate, R R R
Section 6.2 Drawings
Capacity Test IR171300
Supplier’s Test Corrpro QC Test
NACE RP-0387
b) Surface Irregularities Certificate, Report/Complian H R R
Section 3.4
IR171300 ce Certificate
Approved Project Corrpro QC Test
c) Dimensions and Weight Drawings, Compliance Report/Complian H R R
IR171300 ce Certificate
Approved Project Corrpro QC Test
d) Anode to cable
Drawings, Compliance Report/Complian H R R
connection
IR171300 ce Certificate
Corrpro QC Test
e) Pre-packed anode & Approved Project 17-SAMSS-006
Report/Complian A R R
weight Drawings Section 7.3
ce Certificate
Final Inspection & Test
3
Requirements
Corrpro QC Test
a) Cable Connection
IR171300 Compliance Report/Complian H W W
Strength
ce Certificate
Corrpro QC Test
b) Cable to Anode
IR171300 < 1 ohms Report/Complian H W W
Resistance
ce Certificate
Corrpro QC Test
Approved Project
c) Anode Dimensions Compliance Report/Complian H W W
Drawings
ce Certificate
Approved Project Corrpro QC Test
d) Anode Labeling Drawings, Compliance Report/Complian H R R
IR171300 ce Certificate
Packing Procedure, Approved Project
e) Packaging for delivery Compliance H R R
IR171300 Drawings
Corrpro QC Test Buyer’s
f) Inspection Release Note Report/Compliance Buyer’s P.O. Inspection H H R
Certificate Release Note

Inspection Action Codes:


A - Actual Inspection. S - Surveillance Point
H - Hold Point N - No Inspection Required
R - Review Documents W - Witness Inspection
RI - Random Inspection W1- Witness Point, One per Each Size and Type or 10%

Page 2 of 3
Inspection Level: 0

Factory Inspection and Test Plan (ITP)


For Miscellanies CP Materials
(3 pin test station, 8 AWG THHN/THWN Cable, Thermite Weld Mould, Chargers & Fling Gun etc.)

SURVEILLANCE/ INSPECTION
DOCUMENT ACCEPTANCE VERIFYING
No INSPECTION ACTIVITIES
REFERENCE CRITERIA DOCUMENT
Corrpro Gas
Aramco
Arabia Arabian/3P
Final Inspection & Test
1
Requirements
Approved Project
Supplier’s Test
a) Material Test Certificate Drawings & Data Compliance R R R
Certificate
Sheets
b) Workmanship, Approved Project Corrpro QC Test
Components and Drawings & Data Compliance Report/Complian H W W
Dimensions Sheets ce Certificate
LEP-B0-PE-0004
Rev 1& LEP-
c) Packaging for delivery Compliance Inspection Report H W R
NQ1000-CACP-
0010
Buyer’s
Corrpro QC Test
d) Inspection Release Inspection
Report/Compliance Buyer’s P.O. H H R
Certificate Release
Certificate
Certificate
e) Inspection Disposition
Buyer’s P.O. Buyer’s P.O. IDR H H R
Report

Inspection Action Codes:


A - Actual Inspection. S - Surveillance Point
H - Hold Point N - No Inspection Required
R - Review Documents W - Witness Inspection
RI - Random Inspection W1- Witness Point, One per Each Size and Type or 10%

Page 3 of 3