PROJECT: CADANGAN PEMBANGUNAN 2 BLOK BANGUNAN KEDIAMAN PANGSAPURI (18 TINGKAT) YANG MENGANDUNGI :

(A) 2 BLOK PANGSAPURI 282 UNIT DI TINGKAT 6 HINGGA TINGKAT 17. (B) 6 TINGKAT PODIUM TEMPAT LETAK
KERETA DI TINGKAT BAWAH HINGGA TINGKAT 5. (C) 10 UNIT KEDAI DI TINGKAT BAWAH (D) KEMUDAHAN-
KEMUDAHAN FASILITI SEPERTI SURAU, KEDAI DOBI, SALON, TADIKA, PEJABAT PENGURUSAN, BILIK AV, BILIK
BACAAN, DEWAN SERBAGUNA, GELANGGANG BADMINTON,TAMAN PERMAINAN, KOLAM RENANG,GIMNASIUM,
KAFETERIA, TANDAS AWAM DI TINGKAT 6 DAN (E) 2 BUAH PENCAWANG ELEKTRIK BESERTA RUMAH SAMPAH DI
TINGKAT BAWAH DI ATAS HS(D) 74511 PT 7946 & HS(D) 74512 PT 7947, BUKIT HATAMAS, CHERAS, MUKIM HULU
LANGAT, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN. UNTUK TETUAN JIWA MEWAH SDN. BHD.

SUBJECT: OVERALL PROGRESS SUMMARY


DATE: 04 May 2019

Progress Summary
Item Description
Current Progress Previous Progress

1 Overall Site Progress 63.34% 61.81%

2 Structure Work 85.57% 83.24%

3 Architecture Work 39.86% 35.84%

4 M&E Installation Work 91.88% 91.50%

5 External & Infra Work 74.16% 74.16%

6 Authority Handover/ Inspection 0.00% 0.00%


PROJECT: CADANGAN PEMBANGUNAN 2 BLOK BANGUNAN KEDIAMAN PANGSAPURI (18 TINGKAT) YANG MENGANDUNGI : (A) 2 BLOK
PANGSAPURI 282 UNIT DI TINGKAT 6 HINGGA TINGKAT 17. (B) 6 TINGKAT PODIUM TEMPAT LETAK KERETA DI TINGKAT BAWAH
HINGGA TINGKAT 5. (C) 10 UNIT KEDAI DI TINGKAT BAWAH (D) KEMUDAHAN-KEMUDAHAN FASILITI SEPERTI SURAU, KEDAI DOBI,
SALON, TADIKA, PEJABAT PENGURUSAN, BILIK AV, BILIK BACAAN, DEWAN SERBAGUNA, GELANGGANG BADMINTON,TAMAN
PERMAINAN, KOLAM RENANG,GIMNASIUM, KAFETERIA, TANDAS AWAM DI TINGKAT 6 DAN (E) 2 BUAH PENCAWANG ELEKTRIK
BESERTA RUMAH SAMPAH DI TINGKAT BAWAH DI ATAS HS(D) 74511 PT 7946 & HS(D) 74512 PT 7947, BUKIT HATAMAS, CHERAS,
SUBJECT:
MUKIM HULU LANGAT, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN. UNTUK TETUAN JIWA MEWAH SDN. BHD.
ON SITE ACTIVITIES
DATE: 04 May 2019

Date
Item Description Remarks
Start Finish
1 Application of temporary electrical and water supply for construction.
10/9/2017 12/5/2018

2 Machineries and construction tools & Man power on site. • Progressively increase
Machineries on site:- Man Power On Site:- • Note:-
Backhoe - 1no. Carpenter 63
Mobile Crane -1 nos. Barbender 11
Bobcat - 1nos General Worker 24
Forklift-1nos RWDP & Plumber 9
Generator Set - 2nos. Electrichan 8
Machine Operator 3
Fire Fighting 2
Bricklayer 15
Plasterer 29
Skim coat 12
Floor Screder 5
Waterproofing 3
Tiler 6
Painter 5
Plaster Ceiling 7
Scaffolder 5
Total 207

STRUCTURE
3 Tower Crane position.
• Tower Crane 1 2/23/2018 4/17/2018 Succesfully operating

4 5th Flr Slab


•Install column rebar GL E-H/29-35 3/8/2018 4/8/2018 Completed

5 6th Flr Slab


• Concrete 6th Floor Slab GL A-H/ 15-20 19/11/2018 19/11/2018 Completed
• Concrete 6th Floor Enlarge Column GL G1-H/9-12 (1st cast) 8/12/2018 8/12/2018 Completed
PROJECT: CADANGAN PEMBANGUNAN 2 BLOK BANGUNAN KEDIAMAN PANGSAPURI (18 TINGKAT) YANG MENGANDUNGI : (A) 2 BLOK
PANGSAPURI 282 UNIT DI TINGKAT 6 HINGGA TINGKAT 17. (B) 6 TINGKAT PODIUM TEMPAT LETAK KERETA DI TINGKAT BAWAH
HINGGA TINGKAT 5. (C) 10 UNIT KEDAI DI TINGKAT BAWAH (D) KEMUDAHAN-KEMUDAHAN FASILITI SEPERTI SURAU, KEDAI DOBI,
SALON, TADIKA, PEJABAT PENGURUSAN, BILIK AV, BILIK BACAAN, DEWAN SERBAGUNA, GELANGGANG BADMINTON,TAMAN
PERMAINAN, KOLAM RENANG,GIMNASIUM, KAFETERIA, TANDAS AWAM DI TINGKAT 6 DAN (E) 2 BUAH PENCAWANG ELEKTRIK
BESERTA RUMAH SAMPAH DI TINGKAT BAWAH DI ATAS HS(D) 74511 PT 7946 & HS(D) 74512 PT 7947, BUKIT HATAMAS, CHERAS,
SUBJECT:
MUKIM HULU LANGAT, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN. UNTUK TETUAN JIWA MEWAH SDN. BHD.
ON SITE ACTIVITIES
DATE: 04 May 2019

Date
Item Description Remarks
Start Finish

6 7th Flr Slab


•Concrete Slab GL A-D/9-13 9/1/2019 9/1/2019 Completed
•Concrete column GL A-D/9-13 15/1/2018 15/1/2018 Completed

7 8th Flr Slab


•Concrete Slab GL A-D/9-13 24/1/2019 24/1/2019 Completed

8 9th Flr Slab


•Concrete column GL 2-6/A-D 10/12/2018 10/12/2018 Completed
•Concrete Slab GL 9-13/A-H 11/2/2019 11/2/2019 Completed
•Concrete column GL 9-13/A-D 16/2/2019 16/2/2019 Completed

9 10th Flr Slab


•Concrete Slab GL 9-13/A-H 22/2/2019 22/2/2019 Completed
•Concrete column GL 9-13/A-H 27/2/2019 27/2/2019 Completed

10 11th Flr Slab


•Concrete Slab GL 9-13/A-H 11/3/2019 11/3/2019 Completed
•Concrete column GL 9-13/A-H 11/3/2019 13/3/2019 Completed

11 12th Flr Slab


•Concrete Slab GL 9-13/A-H 21/3/2019 21/3/2019 Completed
•Concrete column GL 9-13/A-H 23/3/2019 25/3/2019 Completed

12 13th Flr Slab


•Concrete Slab GL 9-13/A-H 4/4/2019 4/4/2019 Completed
•Concrete column GL 9-13/A-H 8/4/2019 10/4/2019 Completed

13 14th Flr Slab


•Concrete Slab GL 9-13/A-H 16/4/2019 16/4/2019 Completed
•Concrete column GL 9-13/A-H 18/4/2019 20/4/2019 Completed

14 15th Flr Slab


•Concrete Slab GL 9-13/A-H 27/4/2019 27/4/2019 Completed
•Concrete column GL 9-13/A-H 27/4/2019 30/4/2019 Completed

15 16th Flr Slab


•Concrete Slab GL 9-13/A-H 9/5/2019 9/5/2019 In Progress
•Concrete column GL 9-13/A-H 13/5/2019 13/5/2019 In Progress

16 17th Flr Slab


•Concrete Slab GL 9-13/A-H In Progress
•Concrete column GL 9-13/A-H In Progress

17 18th Flr Slab (Water tank Level slab)


PROJECT: CADANGAN PEMBANGUNAN 2 BLOK BANGUNAN KEDIAMAN PANGSAPURI (18 TINGKAT) YANG MENGANDUNGI : (A) 2 BLOK
PANGSAPURI 282 UNIT DI TINGKAT 6 HINGGA TINGKAT 17. (B) 6 TINGKAT PODIUM TEMPAT LETAK KERETA DI TINGKAT BAWAH
HINGGA TINGKAT 5. (C) 10 UNIT KEDAI DI TINGKAT BAWAH (D) KEMUDAHAN-KEMUDAHAN FASILITI SEPERTI SURAU, KEDAI DOBI,
SALON, TADIKA, PEJABAT PENGURUSAN, BILIK AV, BILIK BACAAN, DEWAN SERBAGUNA, GELANGGANG BADMINTON,TAMAN
PERMAINAN, KOLAM RENANG,GIMNASIUM, KAFETERIA, TANDAS AWAM DI TINGKAT 6 DAN (E) 2 BUAH PENCAWANG ELEKTRIK
BESERTA RUMAH SAMPAH DI TINGKAT BAWAH DI ATAS HS(D) 74511 PT 7946 & HS(D) 74512 PT 7947, BUKIT HATAMAS, CHERAS,
SUBJECT:
MUKIM HULU LANGAT, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN. UNTUK TETUAN JIWA MEWAH SDN. BHD.
ON SITE ACTIVITIES
DATE: 04 May 2019

Date
Item Description Remarks
Start Finish
•Concrete Slab GL 9-13/A-H In Progress
•Concrete column GL 9-13/A-H In Progress

15 TNB Sub-Station
• Setting Out 16/03/2018 17/03/2018 Completed
• Excavation for Foundation 17/03/2018 24/03/2018 Completed
• Stump 27/03/2018 29/03/2018 Completed
• Trenches 29/03/2018 14/04/2018 Completed
• Backfilling 19/04/2018 21/04/2018 Completed
• Leanconcrete 27/4/2018 27/4/2018 Completed
•Ground Floor Slab Concrete 4/5/2018 4/5/2018 Completed
•Column 11/5/2018 12/5/2018 Completed
•Roof Beam 14/5/2018 19/5/2018 Completed
•Roof 23/5/2018 26/5/2018 Completed
•Brickwork 9/6/2018 11/7/2018 Completed
•Plastering 12/7/2018 4/8/2018 Completed
•FRP Door 10/8/2018 10/8/2018 Completed
•Perimeter Drain 11/8/2018 6/10/2018 Completed
•Crusher Run 06/10/2018 06/10/2018 Completed
•Fencing 22/10/2018 18/2/2019 Completed

ARCHITECTURE

6th Flr Slab A1


•Door Frame 24/12/2018 3/1/2019 Completed
•Brickwork 24/12/2018 5/1/2019 Completed
•Subframe 7/1/2019 9/1/2019 Completed
•Plastering 10/1/2019 31/1/2019 Completed
•Skimcoat 10/1/2019 31/1/2019 Completed
•External Plaster 3 Unit Complete
•Tiling 29/4/2019 10/5/2019 In Progress

6th Flr Slab A2 (2 Unit)


•Door Frame 8/2/2019 14/2/2019 Completed
•Brickwork 8/2/2019 14/2/2019 Completed
•Subframe 15/2/2019 16/2/2019 Completed
•Plastering 18/3/2019 26/3/2019 Completed
•Skimcoat 20/3/2019 28/3/2019 Completed
•External Plaster
•Tiling 3/5/2019 15/5/2019 In Progress

7th Flr Slab A1


•Door Frame 14/12/2018 24/12/2018 Completed
•Brickwork 14/12/2019 24/12/2018 Completed
•Subframe 4/1/2019 7/1/2019 Completed
PROJECT: CADANGAN PEMBANGUNAN 2 BLOK BANGUNAN KEDIAMAN PANGSAPURI (18 TINGKAT) YANG MENGANDUNGI : (A) 2 BLOK
PANGSAPURI 282 UNIT DI TINGKAT 6 HINGGA TINGKAT 17. (B) 6 TINGKAT PODIUM TEMPAT LETAK KERETA DI TINGKAT BAWAH
HINGGA TINGKAT 5. (C) 10 UNIT KEDAI DI TINGKAT BAWAH (D) KEMUDAHAN-KEMUDAHAN FASILITI SEPERTI SURAU, KEDAI DOBI,
SALON, TADIKA, PEJABAT PENGURUSAN, BILIK AV, BILIK BACAAN, DEWAN SERBAGUNA, GELANGGANG BADMINTON,TAMAN
PERMAINAN, KOLAM RENANG,GIMNASIUM, KAFETERIA, TANDAS AWAM DI TINGKAT 6 DAN (E) 2 BUAH PENCAWANG ELEKTRIK
BESERTA RUMAH SAMPAH DI TINGKAT BAWAH DI ATAS HS(D) 74511 PT 7946 & HS(D) 74512 PT 7947, BUKIT HATAMAS, CHERAS,
SUBJECT:
MUKIM HULU LANGAT, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN. UNTUK TETUAN JIWA MEWAH SDN. BHD.
ON SITE ACTIVITIES
DATE: 04 May 2019

Date
Item Description Remarks
Start Finish
•Plastering 1/2/2019 15/2/2019 Completed
•Skimcoat 1/2/2019 15/2/2019 Completed
•External Plaster 3 Unit Complete
•Tiling 6/3/2019 25/3/2019 Completed

7th Flr Slab A2


•Door Frame 22/2/2019 1/3/2019 Completed
•Brickwork 22/2/2019 1/3/2019 Completed
•Subframe 4/3/2019 6/3/2019 Completed
•Plastering 20/3/2019 29/3/2019 Completed
•Skimcoat 20/3/2019 2/4/2019 Completed
•External Plaster
•Tiling

8th Flr Slab A1


•Door Frame 5/1/2019 11/1/2019 Completed
•Brickwork 5/1/2019 11/1/2019 Completed
•Subframe 16/1/2019 18/1/2019 Completed
•Plastering 16/2/2019 27/2/2019 Completed
•Skimcoat 16/2/2019 27/2/2019 Completed
•External Plaster 3 Unit Complete
•Tiling 3/4/2019 15/4/2019 Completed

8th Flr Slab A2


•Door Frame 13/3/2019 19/3/2019 Completed
•Brickwork 13/3/2019 19/3/2019 Completed
•Subframe 16/3/2019 22/3/2019 Completed
•Plastering 21/4/2019 2/5/2019 Completed
•Skimcoat 21/4/2019 2/5/2019 Completed
•External Plaster
•Tiling

9th Flr Slab A1


•Door Frame 14/1/2019 20/1/2019 Completed
•Brickwork 14/1/2019 20/1/2019 Completed
•Subframe 22/1/2019 24/1/2019 Completed
•Plastering 24/2/2019 10/3/2019 Completed
•Skimcoat 24/2/2019 10/3/2019 Completed
•External Plaster 3 Unit Complete
•Tiling 15/4/2019 25/4/2019 Completed

9th Flr Slab A2


•Door Frame 20/3/2019 28/3/2019 Completed
•Brickwork 20/3/2019 28/3/2019 Completed
•Subframe 20/3/2019 28/3/2019 Completed
•Plastering 4/29/2019 7/5/2019 In Progress
•Skimcoat 4/29/2019 7/5/2019 In Progress
PROJECT: CADANGAN PEMBANGUNAN 2 BLOK BANGUNAN KEDIAMAN PANGSAPURI (18 TINGKAT) YANG MENGANDUNGI : (A) 2 BLOK
PANGSAPURI 282 UNIT DI TINGKAT 6 HINGGA TINGKAT 17. (B) 6 TINGKAT PODIUM TEMPAT LETAK KERETA DI TINGKAT BAWAH
HINGGA TINGKAT 5. (C) 10 UNIT KEDAI DI TINGKAT BAWAH (D) KEMUDAHAN-KEMUDAHAN FASILITI SEPERTI SURAU, KEDAI DOBI,
SALON, TADIKA, PEJABAT PENGURUSAN, BILIK AV, BILIK BACAAN, DEWAN SERBAGUNA, GELANGGANG BADMINTON,TAMAN
PERMAINAN, KOLAM RENANG,GIMNASIUM, KAFETERIA, TANDAS AWAM DI TINGKAT 6 DAN (E) 2 BUAH PENCAWANG ELEKTRIK
BESERTA RUMAH SAMPAH DI TINGKAT BAWAH DI ATAS HS(D) 74511 PT 7946 & HS(D) 74512 PT 7947, BUKIT HATAMAS, CHERAS,
SUBJECT:
MUKIM HULU LANGAT, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN. UNTUK TETUAN JIWA MEWAH SDN. BHD.
ON SITE ACTIVITIES
DATE: 04 May 2019

Date
Item Description Remarks
Start Finish
•External Plaster
•Tiling

10th Flr Slab A1


•Door Frame 21/1/2019 30/1/2019 Completed
•Brickwork 21/1/2019 30/1/2019 Completed
•Subframe 7/2/2019 8/2/2019 Completed
•Plastering 3/3/2019 15/3/2019 Completed
•Skimcoat 4/3/2019 16/3/2019 Completed
•External Plaster 3 Unit Complete
•Tiling 25/4/2019 7/5/2019 In Progress

10th Flr Slab A2


•Door Frame 14/4/2019 20/4/2019 Completed
•Brickwork 14/4/2019 20/4/2019 Completed
•Subframe 14/4/2019 22/4/2019 Completed
•Plastering 8/5/2019 17/5/2019 In Progress
•Skimcoat 8/5/2019 17/5/2019 In Progress
•External Plaster
•Tiling

11th Flr Slab A1


•Door Frame 14/2/2019 20/2/2019 Completed
•Brickwork 14/2/2019 20/2/2019 Completed
•Subframe 23/2/2019 25/2/2019 Completed
•Plastering 12/3/2019 23/3/2019 Completed
•Skimcoat 12/3/2019 25/3/2019 Completed
•External Plaster 3 Unit Complete
•Tiling 3/5/2019 13/5/2019 In Progress

11th Flr Slab A2


•Door Frame 21/4/2019 27/4/2019 Completed
•Brickwork 21/4/2019 27/4/2019 Completed
•Subframe 21/4/2019 28/4/2019 Completed
•Plastering 18/5/2019 28/5/2019 In Progress
•Skimcoat 18/5/2019 28/5/2019 In Progress
•External Plaster
•Tiling

12th Flr Slab A1


•Door Frame 3/3/2019 11/3/2019 Completed
•Brickwork 3/3/2019 11/3/2019 Completed
•Subframe 6/3/2019 13/3/2019 Completed
•Plastering 24/3/2019 8/4/2019 Completed
•Skimcoat 24/3/2019 8/4/2019 Completed
•External Plaster 3 Unit Complete
•Tiling
PROJECT: CADANGAN PEMBANGUNAN 2 BLOK BANGUNAN KEDIAMAN PANGSAPURI (18 TINGKAT) YANG MENGANDUNGI : (A) 2 BLOK
PANGSAPURI 282 UNIT DI TINGKAT 6 HINGGA TINGKAT 17. (B) 6 TINGKAT PODIUM TEMPAT LETAK KERETA DI TINGKAT BAWAH
HINGGA TINGKAT 5. (C) 10 UNIT KEDAI DI TINGKAT BAWAH (D) KEMUDAHAN-KEMUDAHAN FASILITI SEPERTI SURAU, KEDAI DOBI,
SALON, TADIKA, PEJABAT PENGURUSAN, BILIK AV, BILIK BACAAN, DEWAN SERBAGUNA, GELANGGANG BADMINTON,TAMAN
PERMAINAN, KOLAM RENANG,GIMNASIUM, KAFETERIA, TANDAS AWAM DI TINGKAT 6 DAN (E) 2 BUAH PENCAWANG ELEKTRIK
BESERTA RUMAH SAMPAH DI TINGKAT BAWAH DI ATAS HS(D) 74511 PT 7946 & HS(D) 74512 PT 7947, BUKIT HATAMAS, CHERAS,
SUBJECT:
MUKIM HULU LANGAT, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN. UNTUK TETUAN JIWA MEWAH SDN. BHD.
ON SITE ACTIVITIES
DATE: 04 May 2019

Date
Item Description Remarks
Start Finish

12th Flr Slab A2


•Door Frame 28/4/2019 3/5/2019 Completed
•Brickwork 28/4/2019 3/5/2019 Completed
•Subframe 28/4/2019 4/5/2019 Completed
•Plastering
•Skimcoat
•External Plaster
•Tiling

13th Flr Slab A1


•Door Frame 29/3/2019 6/4/2019 Completed
•Brickwork 29/3/2019 6/4/2019 Completed
•Subframe 29/3/2019 9/4/2019 Completed
•Plastering 9/4/2019 20/4/2019 Completed
•Skimcoat 9/4/2019 20/4/2019 Completed
•External Plaster
•Tiling

13th Flr Slab A2


•Door Frame 5/5/2019 11/5/2019
•Brickwork 5/5/2019 11/5/2019
•Subframe 6/5/2019 12/5/2019
•Plastering
•Skimcoat
•External Plaster
•Tiling

14th Flr Slab A1


•Door Frame 7/4/2019 13/4/2019 Completed
•Brickwork 7/4/2019 13/4/2019 Completed
•Subframe 9/4/2019 14/4/2019 Completed
•Plastering 19/4/2019 28/4/2019 Completed
•Skimcoat 19/4/2019 28/4/2019 Completed
•External Plaster
•Tiling

14th Flr Slab A2


•Door Frame
•Brickwork
•Subframe
•Plastering
•Skimcoat
•External Plaster
•Tiling

15th Flr Slab A1


PROJECT: CADANGAN PEMBANGUNAN 2 BLOK BANGUNAN KEDIAMAN PANGSAPURI (18 TINGKAT) YANG MENGANDUNGI : (A) 2 BLOK
PANGSAPURI 282 UNIT DI TINGKAT 6 HINGGA TINGKAT 17. (B) 6 TINGKAT PODIUM TEMPAT LETAK KERETA DI TINGKAT BAWAH
HINGGA TINGKAT 5. (C) 10 UNIT KEDAI DI TINGKAT BAWAH (D) KEMUDAHAN-KEMUDAHAN FASILITI SEPERTI SURAU, KEDAI DOBI,
SALON, TADIKA, PEJABAT PENGURUSAN, BILIK AV, BILIK BACAAN, DEWAN SERBAGUNA, GELANGGANG BADMINTON,TAMAN
PERMAINAN, KOLAM RENANG,GIMNASIUM, KAFETERIA, TANDAS AWAM DI TINGKAT 6 DAN (E) 2 BUAH PENCAWANG ELEKTRIK
BESERTA RUMAH SAMPAH DI TINGKAT BAWAH DI ATAS HS(D) 74511 PT 7946 & HS(D) 74512 PT 7947, BUKIT HATAMAS, CHERAS,
SUBJECT:
MUKIM HULU LANGAT, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN. UNTUK TETUAN JIWA MEWAH SDN. BHD.
ON SITE ACTIVITIES
DATE: 04 May 2019

Date
Item Description Remarks
Start Finish
•Door Frame 4/5/2019 10/5/2019 In Progress
•Brickwork 4/5/2019 10/5/2019 In Progress
•Subframe 4/5/2019 10/5/2019 In Progress
•Plastering
•Skimcoat
•External Plaster
•Tiling

15th Flr Slab A2


•Door Frame
•Brickwork
•Subframe
•Plastering
•Skimcoat
•External Plaster
•Tiling

16th Flr Slab A1


•Door Frame 11/5/2019 17/5/2019 In Progress
•Brickwork 11/5/2019 17/5/2019 In Progress
•Subframe 11/5/2019 17/5/2019 In Progress
•Plastering
•Skimcoat
•External Plaster
•Tiling

16th Flr Slab A2


•Door Frame
•Brickwork
•Subframe
•Plastering
•Skimcoat
•External Plaster
•Tiling

17th Flr Slab A1


•Door Frame 18/5/2019 24/5/2019 In Progress
•Brickwork 18/5/2019 24/5/2019 In Progress
•Subframe 18/5/2019 24/5/2019 In Progress
•Plastering
•Skimcoat
•External Plaster
•Tiling

17th Flr Slab A2


•Door Frame
•Brickwork
•Subframe
•Plastering
•Skimcoat
•External Plaster
•Tiling
PROJECT: CADANGAN PEMBANGUNAN 2 BLOK BANGUNAN KEDIAMAN PANGSAPURI (18 TINGKAT) YANG MENGANDUNGI : (A) 2 BLOK
PANGSAPURI 282 UNIT DI TINGKAT 6 HINGGA TINGKAT 17. (B) 6 TINGKAT PODIUM TEMPAT LETAK KERETA DI TINGKAT BAWAH
HINGGA TINGKAT 5. (C) 10 UNIT KEDAI DI TINGKAT BAWAH (D) KEMUDAHAN-KEMUDAHAN FASILITI SEPERTI SURAU, KEDAI DOBI,
SALON, TADIKA, PEJABAT PENGURUSAN, BILIK AV, BILIK BACAAN, DEWAN SERBAGUNA, GELANGGANG BADMINTON,TAMAN
PERMAINAN, KOLAM RENANG,GIMNASIUM, KAFETERIA, TANDAS AWAM DI TINGKAT 6 DAN (E) 2 BUAH PENCAWANG ELEKTRIK
BESERTA RUMAH SAMPAH DI TINGKAT BAWAH DI ATAS HS(D) 74511 PT 7946 & HS(D) 74512 PT 7947, BUKIT HATAMAS, CHERAS,
SUBJECT:
MUKIM HULU LANGAT, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN. UNTUK TETUAN JIWA MEWAH SDN. BHD.
ON SITE ACTIVITIES
DATE: 04 May 2019

Date
Item Description Remarks
Start Finish

M&E

6th Flr Slab A1


•RWDP 20/12/2018 17/12/2018 Completed
•Sanitary 20/12/2018 17/12/2018 Completed
•Cold Water 5/1/2019 9/1/2019 Completed
•Wiring 27/12/2019 9/1/2019 Completed

6th Flr Slab A2


•RWDP 29/1/2019 5/2/2019 Completed
•Sanitary 29/1/2019 5/2/2019 Completed
•Cold Water 9/2/2019 15/2/2019 Completed
•Wiring 9/2/2019 15/2/2019 Completed

7th Flr Slab A1


•RWDP 19/12/2018 23/12/2018 Completed
•Sanitary 19/12/2018 23/12/2018 Completed
•Cold Water 18/12/2018 24/12/2018 Completed
•Wiring 22/12/2018 27/12/2018 Completed

7th Flr Slab A2


•RWDP 14/2/2019 21/2/2019 Completed
•Sanitary 14/2/2019 21/2/2019 Completed
•Cold Water 24/2/2019 5/3/2019 Completed
•Wiring 24/2/2019 5/3/2019 Completed

8th Flr Slab A1


•RWDP 24/12/2018 9/1/2019 Completed
•Sanitary 24/12/2018 9/1/2019 Completed
•Cold Water 13/1/2019 18/1/2019 Completed
•Wiring 25/12/2018 12/1/2019 Completed

8th Flr Slab A2


•RWDP 21/2/2019 28/2/2019 Completed
•Sanitary 21/2/2019 28/2/2019 Completed
•Cold Water 14/3/2019 19/3/2019 Completed
•Wiring 14/3/2019 19/3/2019 Completed
PROJECT: CADANGAN PEMBANGUNAN 2 BLOK BANGUNAN KEDIAMAN PANGSAPURI (18 TINGKAT) YANG MENGANDUNGI : (A) 2 BLOK
PANGSAPURI 282 UNIT DI TINGKAT 6 HINGGA TINGKAT 17. (B) 6 TINGKAT PODIUM TEMPAT LETAK KERETA DI TINGKAT BAWAH
HINGGA TINGKAT 5. (C) 10 UNIT KEDAI DI TINGKAT BAWAH (D) KEMUDAHAN-KEMUDAHAN FASILITI SEPERTI SURAU, KEDAI DOBI,
SALON, TADIKA, PEJABAT PENGURUSAN, BILIK AV, BILIK BACAAN, DEWAN SERBAGUNA, GELANGGANG BADMINTON,TAMAN
PERMAINAN, KOLAM RENANG,GIMNASIUM, KAFETERIA, TANDAS AWAM DI TINGKAT 6 DAN (E) 2 BUAH PENCAWANG ELEKTRIK
BESERTA RUMAH SAMPAH DI TINGKAT BAWAH DI ATAS HS(D) 74511 PT 7946 & HS(D) 74512 PT 7947, BUKIT HATAMAS, CHERAS,
SUBJECT:
MUKIM HULU LANGAT, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN. UNTUK TETUAN JIWA MEWAH SDN. BHD.
ON SITE ACTIVITIES
DATE: 04 May 2019

Date
Item Description Remarks
Start Finish

9th Flr Slab A1


•RWDP 16/1/2019 20/1/2019 Completed
•Sanitary 16/1/2019 20/1/2019 Completed
•Cold Water 18/1/2019 24/1/2019 Completed
•Wiring 16/1/2019 24/1/2019 Completed

9th Flr Slab A2


•RWDP 28/2/2019 6/3/2019 Completed
•Sanitary 28/2/2019 6/3/2019 Completed
•Cold Water 23/3/2019 28/3/2019 Completed
•Wiring 23/3/2019 28/3/2019 Completed

10th Flr Slab A1


•RWDP 21/1/2019 25/1/2019 Completed
•Sanitary 21/1/2019 25/1/2019 Completed
•Cold Water 4/2/2019 11/2/2019 Completed
•Wiring 4/3/2019 11/2/2019 Completed

10th Flr Slab A2


•RWDP 13/3/2019 19/3/2019 Completed
•Sanitary 13/3/2019 19/3/2019 Completed
•Cold Water 19/4/2019 23/4/2019 Completed
•Wiring 19/4/2019 23/4/2019 Completed

11th Flr Slab A1


•RWDP 27/1/2019 7/2/2019 Completed
•Sanitary 27/1/2019 7/2/2019 Completed
•Cold Water 15/2/2019 22/2/2019 Completed
•Wiring 15/2/2019 22/2/2019 Completed

11th Flr Slab A2


•RWDP 15/4/2019 20/4/2019 Completed
•Sanitary 15/4/2019 20/4/2019 Completed
•Cold Water 22/4/2019 28/4/2019 Completed
•Wiring 22/4/2019 28/4/2019 Completed

12th Flr Slab A1


•RWDP 12/2/2019 22/2/2019 Completed
•Sanitary 12/2/2019 22/2/2019 Completed
•Cold Water 5/3/2019 13/3/2019 Completed
•Wiring 5/3/2019 13/3/2019 Completed

12th Flr Slab A2


•RWDP 22/4/2019 26/4/2019 Completed
•Sanitary 22/4/2019 26/4/2019 Completed
•Cold Water 28/4/2019 5/5/2019 In Progress
•Wiring 28/4/2019 5/5/2019 In Progress
PROJECT: CADANGAN PEMBANGUNAN 2 BLOK BANGUNAN KEDIAMAN PANGSAPURI (18 TINGKAT) YANG MENGANDUNGI : (A) 2 BLOK
PANGSAPURI 282 UNIT DI TINGKAT 6 HINGGA TINGKAT 17. (B) 6 TINGKAT PODIUM TEMPAT LETAK KERETA DI TINGKAT BAWAH
HINGGA TINGKAT 5. (C) 10 UNIT KEDAI DI TINGKAT BAWAH (D) KEMUDAHAN-KEMUDAHAN FASILITI SEPERTI SURAU, KEDAI DOBI,
SALON, TADIKA, PEJABAT PENGURUSAN, BILIK AV, BILIK BACAAN, DEWAN SERBAGUNA, GELANGGANG BADMINTON,TAMAN
PERMAINAN, KOLAM RENANG,GIMNASIUM, KAFETERIA, TANDAS AWAM DI TINGKAT 6 DAN (E) 2 BUAH PENCAWANG ELEKTRIK
BESERTA RUMAH SAMPAH DI TINGKAT BAWAH DI ATAS HS(D) 74511 PT 7946 & HS(D) 74512 PT 7947, BUKIT HATAMAS, CHERAS,
SUBJECT:
MUKIM HULU LANGAT, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN. UNTUK TETUAN JIWA MEWAH SDN. BHD.
ON SITE ACTIVITIES
DATE: 04 May 2019

Date
Item Description Remarks
Start Finish

13th Flr Slab A1


•RWDP 12/2/2019 22/2/2019 Completed
•Sanitary 12/2/2019 22/2/2019 Completed
•Cold Water 30/3/2019 9/4/2019 Completed
•Wiring 30/3/2019 9/4/2019 Completed

13th Flr Slab A2


•RWDP
•Sanitary
•Cold Water
•Wiring

14th Flr Slab A1


•RWDP 5/3/2019 12/3/2019 Completed
•Sanitary 5/3/2019 12/3/2019 Completed
•Cold Water 10/4/2019 18/4/2019 Completed
•Wiring 10/4/2019 18/4/2019 Completed

14th Flr Slab A2


•RWDP
•Sanitary
•Cold Water
•Wiring

15th Flr Slab A1


•RWDP 8/4/2019 13/4/2019 Completed
•Sanitary 8/4/2019 13/4/2019 Completed
•Cold Water 5/5/2019 11/5/2019 In Progress
•Wiring 5/5/2019 11/5/2019 In Progress

15th Flr Slab A2


•RWDP
•Sanitary
•Cold Water
•Wiring

16th Flr Slab A1


•RWDP 27/4/2019 4/5/2019 In Progress
•Sanitary 27/4/2019 7/5/2019 In Progress
•Cold Water 12/5/2019 18/5/2019 In Progress
•Wiring 12/5/2019 18/5/2019 In Progress

16th Flr Slab A2


•RWDP
•Sanitary
•Cold Water
•Wiring

17th Flr Slab A1


•RWDP 3/5/2019 7/5/2019 In Progress
•Sanitary 8/5/2019 14/5/2019 In Progress
•Cold Water 19/5/2019 25/5/2019 In Progress
•Wiring 19/5/2019 25/5/2019 In Progress

17th Flr Slab A2


•RWDP
•Sanitary
•Cold Water
•Wiring
PROJECT: CADANGAN PEMBANGUNAN 2 BLOK BANGUNAN KEDIAMAN PANGSAPURI (18 TINGKAT) YANG MENGANDUNGI : (A) 2 BLOK PANGSAPURI 282 UNIT DI TINGKAT 6
HINGGA TINGKAT 17. (B) 6 TINGKAT PODIUM TEMPAT LETAK KERETA DI TINGKAT BAWAH HINGGA TINGKAT 5. (C) 10 UNIT KEDAI DI TINGKAT BAWAH (D)
KEMUDAHAN-KEMUDAHAN FASILITI SEPERTI SURAU, KEDAI DOBI, SALON, TADIKA, PEJABAT PENGURUSAN, BILIK AV, BILIK BACAAN, DEWAN SERBAGUNA,
GELANGGANG BADMINTON,TAMAN PERMAINAN, KOLAM RENANG,GIMNASIUM, KAFETERIA, TANDAS AWAM DI TINGKAT 6 DAN (E) 2 BUAH PENCAWANG ELEKTRIK
BESERTA RUMAH SAMPAH DI TINGKAT BAWAH DI ATAS HS(D) 74511 PT 7946 & HS(D) 74512 PT 7947, BUKIT HATAMAS, CHERAS, MUKIM HULU LANGAT, DAERAH
HULU LANGAT, SELANGOR DARUL EHSAN. UNTUK TETUAN JIWA MEWAH SDN. BHD.

SUBJECT: ONSITE PROGRESS PHOTO & LAYOUT


DATE: 04 May 2019

A2- level 16, cslab formwork In Progress A1- Level 18 lift shaft casting complete A1-Level 17, Dismantle formwork in Progress

A1-Level 16, RWDP Piping work Completed A1- Level 16 Soffit Wiring Work in progress A2- Level 12 Cold Water Piping Work complete

A2- Level 12 Electrical Conceal Conduct In Progress A1 Level 15 Brickwork In Progress A2- Level 9 Plaster In Progress

A2- Level 9, Skimcoat in progress A1-Level 11 Painting Work In Progress A1- Level 11 Floor Tiling Work In Progress
4th FLOOR LAYOUT

4th Floor Slab & Column Casting Completed


4th Floor Slab Casting Completed
4th Floor Formwork & Rebar In Progress

5th FLOOR LAYOUT

5th Floor Slab & Column Casting Completed


5th Floor Slab Casting Completed
5th Floor Formwork & Rebar In Progress
6th FLOOR LAYOUT

6th Floor Slab & Column Casting Completed


6th Floor Slab Casting Completed
6th Floor Formwork & Rebar In Progress

7th FLOOR LAYOUT

7th Floor Slab & Column Casting Completed


7th Floor Slab Casting Completed
7th Floor Formwork & Rebar In Progress
8th FLOOR LAYOUT

8th Floor Slab & Column Casting Completed


8th Floor Slab Casting Completed
8th Floor Formwork & Rebar In Progress

9th FLOOR LAYOUT

9th Floor Slab & Column Casting Completed


9th Floor Slab Casting Completed
9th Floor Formwork & Rebar In Progress
10th FLOOR LAYOUT

10th Floor Slab & Column Casting Completed


10th Floor Slab Casting Completed
10th Floor Formwork & Rebar In Progress

11th FLOOR LAYOUT

11th Floor Slab & Column Casting Completed


11th Floor Slab Casting Completed
11th Floor Formwork & Rebar In Progress
12th FLOOR LAYOUT

12th Floor Slab & Column Casting Completed


12th Floor Slab Casting Completed
12th Floor Formwork & Rebar In Progress

13th Floor Layout

13th Floor Slab & Column Casting Completed


13th Floor Slab Casting Completed
13th Floor Formwork & Rebar In Progress
14th Floor Layout

14th Floor Slab & Column Casting Completed


14th Floor Slab Casting Completed
14th Floor Formwork & Rebar In Progress

15th Floor Layout

15th Floor Slab & Column Casting Completed


15th Floor Slab Casting Completed
15th Floor Formwork & Rebar In Progress
16th Floor Layout

16th Floor Slab & Column Casting Completed


16th Floor Slab Casting Completed
16th Floor Formwork & Rebar In Progress

17th Floor Layout

17th Floor Slab & Column Casting Completed


17th Floor Slab Casting Completed
17th Floor Formwork & Rebar In Progress