Sl. No. RUB Box Completion FIT For NTCOver all RUB Completion
4 LC69 Completed Completed Completed
5 LC71 Completed Completed Completed
3 LC77 Completed Completed Completed
4 LC78 Completed Completed Completed
2 LC79 Completed Completed
3 LC80 Completed Completed
4 LC81 Completed Completed
5 LC82 Completed Completed Completed
6 LC83 Completed Completed Completed
5 LC84 Completed Completed
6 LC85 Completed Completed
7 LC86 Completed Completed
8 LC87 Completed Completed
9 LC89 Completed 2-Apr-19
10 LC90 18-Apr-18 26-Apr-19
11 LC91 21-Apr-18 30-Apr-19
12 LC92 30-Apr-18 10-May-19
13 LC93 Completed Completed
14 LC94 Completed 30-May-19
15 LC95 15-May-19 30-May-19
16 LC96 30-Apr-19 28-May-19
17 LC101 31-May-19 30-Jun-19
18 LC102 30-Apr-19 28-May-19
19 LC103 20-May-19 20-May-19
20 LC104 30-Apr-19 30-Apr-19
21 LC105 30-May-19 30-Jun-19
22 LC107 18-May-19 30-May-19
MIB
Scope Completed Balance
138 133 5
Agency
Sl. No. Fabrication Supply
Identified
1
2
3
4
5
6
7
8
Major Bridges
Scope Completed Balance
34 25 9
TDC Without Canopy Sl. No. PS Box Completion FIT For NTC
Completed 1 Rani PS 1 Completed Completed
Completed 2 Rani PS 2 Completed Completed
Completed 3 Jawaibandh PS Completed 7-Apr-19
Completed 4 Kothar PS 30-Apr-19 15-May-19
30-Apr-19 5 NANA PS Completed 15-Apr-19
30-Apr-19 6 Keshavganj PS 12-May-19 30-May-19
IR Box Bal. 7 Sirohi Road PS 30-Apr-19 30-May-19
Completed
Completed
30-Apr-19
31-May-19
30-Apr-19
31-May-19
31-May-19
30-Jun-19
30-Jun-19
30-Jun-19
30-May-19
30-Jul-19
30-Jun-19
30-Jun-19
30-Jul-19
30-Jun-19
IR Box Bal. 4
30-May-19 5
30-Jul-19
30-Jun-19 6
FOB
Scope Completed Balance
7 0 7
Approach Slab
20-Apr-19
3-Apr-19
30-Apr-19
10-May-19
5-May-19
10-May-19
9-Jun-19
25-May-19
25-May-19
lance
lance
TDC
30-Apr-19
Subject to Supply
Subject to Supply
Budget in Cr
Mar-18 Mar-19 Sl. No. Item SCOPE Cumm Achvd till Mar'19Budget Plan
266.99 354.13 1 MJB 399 354 93
107.977 127.615 2 MIB 138.74 128 36
0.955738 3.7 3 PS 13.817 4 6.8
11.2608 20.9 4 RUB 70.91 21 27.5
5 FOB 10.78 0 2
Budget in Cr
0
Sl. No. Item SCOPE Cumm Achvd till Mar'19Budget Plan
52.51 100.13 1 MJB 137 48 55
31.15354 36.84527 2 MIB 41 6 12
0 0.7216 3 PS 5 1 3
0 4.83473 4 RUB 33 5 14
0 0 5 FOB 7 0 0
6 Safety Wall
Budget in Cr
Mar-18 Mar-19 Sl. No. Item SCOPE Cumm Achvd till Mar'19Budget Plan
214.48 254 1 MJB 262 254 80
76.82346 90.77 2 MIB 97.46 92.77 31
0.955738 2.948 3 PS 8.38 3.67 5.2
11.2608 16.07 4 RUB 37.62 16.07 26
5 FOB 4.18 0 2
6 Safety Wall
rete)
rete)
G D1"
Budget Achd Shortfall Balance Desc
60 84 43.18 Invoice
50028 14692 Concrete
rete)
Achd Shortfall Balance Sl. No. Item
17432 3537 3537 1 MJB
9917 1795 1880.8772 2 MIB
4869 1223 2451 3 PS
17603 7516 15,412 15412.303 4 RUB
207 621 1380 5 FOB
0 6 Safety Wall
Budget FY 19-20 "PKG D"
Budget Plan Concrete Plan
124 60942
Budget in Cr
Budget Plan Q1 Q2 Q3 Q4
45.05 44.8 0.2 0 0
8.69 8.7 0 0 0
9.42 6.8 2.7 0 0
50.01 31.5 18.5 0 0
10.78 5.4 3.0 1.8 0.6
123.95 97.18 24.39 1.80 0.60
Budget Plan Q1 Q2 Q3 Q4
Budget FY 19-20 "PKG D2"
Budget Plan Achd Shortfall
81 66 15
36281 492 1145
Budget in Cr
Budget Plan Q1 Q2 Q3 Q4
37 37
4 4.0
4.7 3.61 1.1
28 16.36 12
7 4.8 1.8
Budget Plan Q1 Q2 Q3 Q4
11541
492 492
2181 1145
19708
2359
0
Budget in Cr
Budget Plan Q1 Q2 Q3 Q4
8.05 7.83 0.23
4.7 4.7 0
4.7 3.15 1.56
21.55 15.14 6.42
4.18 0.6 1.18 1.8 0.6
330.1435406699
6280
MMV 2512
PS 3768
Concrete- NSB Scope "PKG D"
Sl. No. Item Scope Completed Balance
1 MJB 185006 169928 15078
2 MIB 69216 66843 2373
3 PS 12464 7832 4632
4 RUB 71026 35906 35120
5 FOB 4250 511 3739
341962 281020 60942
SMC 5 4.1 Validation Survey Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0.0 Err:504
4.2 IMB/MJB Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0.0 Err:504
4.3 MIB Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0.0 Err:504
4.3 RUB Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0.0 Err:504
4.3 PS Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0.0 Err:504
4.4 Earthwork Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 1.6 Err:504
4.4 Blanket Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 2.2 Err:504
4.4.5 ERS/Drains/Turfing/C&G Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 34.1 Err:504
4.5 FOB Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
4.6 Utility Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0.0 Err:504
4.7 BUILDING Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Total - SMC Err:504 Err:504 Err:504 ### ### ### ### ### ### ### ### ### ### ### ### ### Err:504 Err:504 Err:504
GST 6 4.1 Validation Survey Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0.0 Err:504
4.2 IMB/MJB Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 3.1 Err:504
4.3 MIB Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0.0 Err:504
4.3 RUB Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 3.0 Err:504
4.3 PS Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0.0 Err:504
4.4 Earthwork Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 1.7 Err:504
4.4 Blanket Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 1.1 Err:504
4.4.5 ERS/Drains/Turfing/C&G Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 29.3 Err:504
4.5 FOB Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
4.6 Utility Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0.0 Err:504
4.7 BUILDING Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Total - GST Err:504 Err:504 Err:504 ### ### ### ### ### ### ### ### ### ### ### ### ### Err:504 Err:504 Err:504
LKS D 4.1 Validation Survey Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
4.2 IMB/MJB Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 25.0 Err:504
4.3 MIB Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 10.0 Err:504
4.3 RUB Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 23.0 Err:504
4.3 PS Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 10.0 Err:504
4.4 Earthwork Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 6.0 Err:504
4.4 Blanket Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 8.0 Err:504
4.4.5 ERS/Drains/Turfing/C&G Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
4.5 FOB Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
4.6 Utility Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0.0 Err:504
4.7 BUILDING Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Total - LKS Err:504 Err:504 Err:504 ### ### ### ### ### ### ### ### ### ### ### ### ### Err:504 Err:504 Err:504
KCY Marwar 4.8.1.a Rail-80% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0.0 Err:504
4.8.2.a Sleeper-80% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
4.8.1 & 2.b Sleeper-20% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0.0 Err:504
4.8.3 Track-50KMPH Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
4.8.3.1 Track-100KMPH Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0.0 Err:504
Total - KCY Err:504 Err:504 Err:504 ### ### ### ### ### ### ### ### ### ### ### ### ### Err:504 Err:504 Err:504
RKJ 4.1 Validation Survey Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
4.2 IMB/MJB Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 28.1 Err:504
4.3 MIB Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 10.0 Err:504
4.3 RUB Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 26.0 Err:504
4.3 PS Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 10.0 Err:504
CP 4.4 Earthwork Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 9.3 Err:504
CP 4.4 Blanket Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 11.3 Err:504
4.4.5 ERS/Drains/Turfing/C&G Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
4.5 FOB Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
4.6 Utility Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0.0 Err:504
4.7 BUILDING Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
4.8.1.a Rail-80% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0.0 Err:504
4.8.2.a Sleeper-80% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
4.8.1 & 2.b Sleeper-20% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0.0 Err:504
4.8.3 Track-50KMPH Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
4.8.3.1 Track-100KMPH Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 0.0 Err:504
Grand Total - RKJ Err:504 Err:504 Err:504 ### ### ### ### ### ### ### ### ### ### ### ### ### Err:504 Err:504 Err:504
CTP2
Given to Top Management
Earthwork 13.0 13.2 13.8 40.0 3.0 4.0 7.6 14.6 10.8 9.0 9.2 29.0 9.5 9.0 9.0 27.5 111.0 Err:504
Blanket 7.5 6.3 9.6 23.4 3.4 7.0 10.3 20.7 14.4 10.0 13.3 37.7 13.5 14.0 14.0 41.5 123.3 Err:504
ERS/Drains/Turfing/C&G 3.0 5.0 5.0 13.0 12.0 12.0 14.0 38.0 14.0 15.0 15.0 44.0 10.0 27.0 27.0 64.0 159.0 Err:504
IMB/MJB 31.5 22.4 22.8 76.7 13.9 10.0 19.5 43.4 17.8 20.0 20.0 57.8 30.0 35.0 35.0 100.0 277.9 Err:504
Minor Str. 10.0 10.0 20.2 40.2 15.4 10.0 18.5 43.9 25.5 15.0 22.0 62.5 20.0 25.0 35.0 80.0 226.6 Err:504
BUILDING 1.2 2.3 2.8 6.3 2.7 4.0 11.0 17.7 15.0 15.0 15.0 45.0 15.0 15.0 15.0 45.0 114.0 Err:504
FOB, Util. Etc. 1.5 2.5 1.9 5.9 0.7 0.6 1.3 2.6 1.3 1.7 2.2 5.2 1.0 2.5 1.1 4.6 18.3 Err:504
Rail Supply 0.0 20.0 0.0 20.0 29.0 29.0 0.0 58.0 0.0 29.0 29.0 58.0 0.0 37.4 0.0 37.4 173.4 Err:504
Sleeper Production 5.7 5.7 5.7 17.1 5.7 5.7 5.7 17.1 5.7 5.7 5.7 17.1 5.7 5.7 5.7 17.1 68.4 Err:504
Track Linking 10.0 10.0 25.0 45.0 30.0 30.0 30.0 90.0 30.0 30.0 30.0 90.0 30.0 30.0 35.0 95.0 320.0 Err:504
83 98 107 288 116 112 118 346 135 150 161 446 135 201 177 512 1592 Err:504
Budget Budget Budget Budget
Q1, 2018-19 Q2, 2018-19 Q3, 2018-19 Q4, 2018-19
Budget Details from Apr-18 to Mar-19
Apr-18 May-18 June-18 Budget July-18 Aug-18 Sep-18 Budget Oct-18 Nov-18 Dec-18 Budget Jan-19 Feb-19 Mar-19 Budget
Budget Budget Budget (Q1) Budget Budget Budget (Q2) Budget Budget Budget (Q3) Budget Budget Budget (Q4) Total Budget
Total Amount 89 113 93 294 96 64 107 267 120 117 122 359 125 90 76 291 1211
PKG-5 7 9 13 30 12 9 12 33 17 17 19 53 17 12 8 37 153
PKG-6 13 18 12 44 42 24 30 96 15 21 11 47 12 2 2 16 203
PKG-D 35 28 52 116 24 10 21 55 30 17 40 87 36 24 30 90 348
Tracks 34 56 14 105 18 22 44 83 59 61 52 172 60 52 36 148 508
Structure 32 34 52 118 62 29 43 133 40 37 43 120 39 15 21 75 446
PKG-5 2 2 6 10 6 4 6 16 8 9 9 26 8 4 2 14 67
PKG-6 9 18 12 40 42 21 23 86 15 21 11 47 12 2 2 16 189
PKG-D 21 14 33 68 14 4 13 30 17 6 23 46 19 9 17 45 189
Formation 23 22 26 72 16 14 20 50 21 19 27 67 26 22 20 68 258
PKG-5 5 7 7 20 5 5 6 17 9 8 10 26 9 8 6 23 86
PKG-6 4 0 0 4 0 3 6 9 0 0 0 0 0 0 0 0 13
PKG-D 14 15 19 48 11 6 7.5 24 12.4 11.2 17.5 41.0 17.0 14.7 13.7 45.4 159
Tracks 34 56 14 105 18 22 44 83 59 61 52 172 60 52 36 148 508
Budget Details from Apr-18 to Mar-19
Sl. No. Desc Package Bridge/WS No. Description Type Apr-18 May-18 June-18 Budget July-18 Aug-18 Sep-18 Budget Oct-18 Nov-18 Dec-18 Budget Jan-19 Feb-19 Mar-19 Budget Total budget
Budget Budget Budget (Q1) Budget Budget Budget (Q2) Budget Budget Budget (Q3) Budget Budget Budget (Q4) amount Jan to
Sep-18
1 Structure 5 379 Superstructure IMB/MJB 0.38 0.38 0.00 0.00 0.00 0.38
2 Structure 5 391 Superstructure IMB/MJB 1.40 1.40 0.00 0.00 0.00 1.40
3 Structure 5 332 Completion MIB 0.19 0.19 0.00 0.00 0.00 0.19
4 Structure 5 334B Completion MIB 0.11 0.11 0.00 0.00 0.00 0.11
5 Structure 5 379B Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
6 Formation 5 WS-66/1/3 Blanket- 50% Blanket 0.17 0.17 0.00 0.00 0.00 0.17
7 Formation 5 WS-66/1/4 Blanket- 100% Blanket 0.06 0.06 0.00 0.00 0.00 0.06
8 Formation 5 WS-66/1/5 Blanket- 100% Blanket 0.07 0.07 0.00 0.00 0.00 0.07
9 Formation 5 WS-70/1/3 Embankment- 100% Earthwork 0.02 0.02 0.00 0.00 0.00 0.02
10 Formation 5 WS-70/1/3 Subgrade- 50% Earthwork 0.03 0.03 0.00 0.00 0.00 0.03
11 Formation 5 WS-70/1/4 Embankment- 50% Earthwork 0.06 0.06 0.00 0.00 0.00 0.06
12 Formation 5 WS-75/1 Cutting- 50% Earthwork 0.02 0.02 0.00 0.00 0.00 0.02
13 Formation 5 WS-75/1 Cutting- 100% Earthwork 0.02 0.02 0.00 0.00 0.00 0.02
14 Formation 5 WS-78/6 Embankment- 50% Earthwork 0.18 0.18 0.00 0.00 0.00 0.18
15 Formation 5 WS-80/2 Cutting- 50% Earthwork 0.03 0.03 0.00 0.00 0.00 0.03
16 Formation 5 WS-80/2 Embankment- 50% Earthwork 0.13 0.13 0.00 0.00 0.00 0.13
17 Formation 5 WS-83/2 Cutting- 50% Earthwork 0.15 0.15 0.00 0.00 0.00 0.15
18 Formation 5 WS-86/3 Cutting- 100% Earthwork 0.11 0.11 0.00 0.00 0.00 0.11
19 Formation 5 WS-86/4 Cutting- 100% Earthwork 0.20 0.20 0.00 0.00 0.00 0.20
20 Formation 5 WS-87/1 Embankment- 50% Earthwork 0.06 0.06 0.00 0.00 0.00 0.06
21 Formation 5 WS-87/1 Embankment- 100% Earthwork 0.06 0.06 0.00 0.00 0.00 0.06
22 Formation 5 WS-87/2 Embankment- 50% Earthwork 0.15 0.15 0.00 0.00 0.00 0.15
23 Formation 5 WS-87/2 Embankment- 100% Earthwork 0.15 0.15 0.00 0.00 0.00 0.15
24 Formation 5 WS-87/5 Cutting- 100% Earthwork 0.11 0.11 0.00 0.00 0.00 0.11
25 Formation 5 WS-90/4 Blanket- 100% Blanket 0.10 0.10 0.00 0.00 0.00 0.10
26 Formation 5 WS-90/5 Blanket- 50% Blanket 0.28 0.28 0.00 0.00 0.00 0.28
27 Formation 5 WS-69 Bridge Gaps Earthwork 0.06 0.06 0.00 0.00 0.00 0.06
28 Formation 5 WS-70/2 Bridge Gaps Earthwork 0.34 0.34 0.00 0.00 0.00 0.34
29 Formation 5 WS-72/1 Bridge Gaps Earthwork 0.09 0.09 0.00 0.00 0.00 0.09
30 Formation 5 WS-72/2 Bridge Gaps Earthwork 0.07 0.07 0.00 0.00 0.00 0.07
31 Formation 5 WS-74/2 Bridge Gaps Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
32 Formation 5 WS-79 Bridge Gaps Earthwork 0.13 0.13 0.00 0.00 0.00 0.13
33 Formation 5 WS-84 Bridge Gaps Earthwork 0.28 0.28 0.00 0.00 0.00 0.28
34 Formation 5 WS-85 Bridge Gaps Earthwork 0.21 0.21 0.00 0.00 0.00 0.21
35 Formation 5 WS-86 Bridge Gaps Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
36 Formation 5 WS-90 Bridge Gaps Earthwork 0.23 0.23 0.00 0.00 0.00 0.23
37 Formation 5 WS-72/1/4 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.48 0.48 0.00 0.00 0.00 0.48
38 Formation 5 WS-74/1/1 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.49 0.49 0.00 0.00 0.00 0.49
39 Formation 5 WS-74/2/4 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.22 0.22 0.00 0.00 0.00 0.22
40 Structure 5 RFO-3 Substructure IMB/MJB 0.53 0.53 0.00 0.00 0.00 0.53
41 Structure 5 342/1 Completion MIB 0.04 0.04 0.00 0.00 0.00 0.04
42 Structure 5 342-B Completion MIB 0.05 0.05 0.00 0.00 0.00 0.05
43 Structure 5 379A Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
44 Structure 5 LC9 Completion RUB 1.26 1.26 0.00 0.00 0.00 1.26
45 Structure 5 382-B Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
46 Structure 5 412-A Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
47 Structure 5 Saradhana Building Station Building and Residential Quarters Building 0.15 0.15 0.00 0.00 0.00 0.15
48 Formation 5 WS-65/3 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.29 0.29 0.00 0.00 0.00 0.29
49 Formation 5 WS-66/1/5 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.51 0.51 0.00 0.00 0.00 0.51
50 Formation 5 WS-72/2/1 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.65 0.65 0.00 0.00 0.00 0.65
51 Formation 5 WS-74/2/5 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.11 0.11 0.00 0.00 0.00 0.11
52 Formation 5 WS-66/1/3 Blanket- 100% Blanket 0.17 0.17 0.00 0.00 0.00 0.17
53 Formation 5 WS-66/2/2 Embankment- 50% Earthwork 0.15 0.15 0.00 0.00 0.00 0.15
54 Formation 5 WS-67/1/1 Cutting- 50% Earthwork 0.11 0.11 0.00 0.00 0.00 0.11
55 Formation 5 WS-67/1/2 Cutting- 50% Earthwork 0.14 0.14 0.00 0.00 0.00 0.14
56 Formation 5 WS-67/1/2 Cutting- 100% Earthwork 0.14 0.14 0.00 0.00 0.00 0.14
57 Formation 5 WS-67/2/3 Cutting- 50% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
58 Formation 5 WS-67/2/3 Cutting- 100% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
59 Formation 5 WS-69/2 Embankment- 50% Earthwork 0.06 0.06 0.00 0.00 0.00 0.06
60 Formation 5 WS-69/2 Embankment- 100% Earthwork 0.06 0.06 0.00 0.00 0.00 0.06
61 Formation 5 WS-70/1/2 Embankment- 50% Earthwork 0.20 0.20 0.00 0.00 0.00 0.20
62 Formation 5 WS-70/1/3 Subgrade- 100% Earthwork 0.04 0.04 0.00 0.00 0.00 0.04
63 Formation 5 WS-70/1/4 Embankment- 100% Earthwork 0.06 0.06 0.00 0.00 0.00 0.06
64 Formation 5 WS-70/2/3 Blanket- 50% Blanket 0.03 0.03 0.00 0.00 0.00 0.03
65 Formation 5 WS-70/2/3 Blanket- 100% Blanket 0.03 0.03 0.00 0.00 0.00 0.03
66 Formation 5 WS-70/2/4 Blanket- 50% Blanket 0.01 0.01 0.00 0.00 0.00 0.01
67 Formation 5 WS-70/2/4 Blanket- 100% Blanket 0.01 0.01 0.00 0.00 0.00 0.01
68 Formation 5 WS-72/1/1 Blanket- 50% Blanket 0.01 0.01 0.00 0.00 0.00 0.01
69 Formation 5 WS-72/1/1 Blanket- 100% Blanket 0.01 0.01 0.00 0.00 0.00 0.01
70 Formation 5 WS-72/1/2 Embankment- 100% Earthwork 0.05 0.05 0.00 0.00 0.00 0.05
71 Formation 5 WS-72/1/3 Subgrade- 100% Earthwork 0.04 0.04 0.00 0.00 0.00 0.04
72 Formation 5 WS-72/2/1 Subgrade- 50% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
73 Formation 5 WS-72/2/1 Subgrade- 100% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
74 Formation 5 WS-74/2/2 Blanket- 50% Blanket 0.01 0.01 0.00 0.00 0.00 0.01
75 Formation 5 WS-74/2/2 Blanket- 100% Blanket 0.01 0.01 0.00 0.00 0.00 0.01
76 Formation 5 WS-75/2 Cutting- 50% Earthwork 0.05 0.05 0.00 0.00 0.00 0.05
77 Formation 5 WS-75/2 Cutting- 100% Earthwork 0.05 0.05 0.00 0.00 0.00 0.05
78 Formation 5 WS-78/1 Embankment- 50% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
79 Formation 5 WS-78/1 Embankment- 100% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
80 Formation 5 WS-78/1 Subgrade- 50% Earthwork 0.13 0.13 0.00 0.00 0.00 0.13
81 Formation 5 WS-78/1 Subgrade- 100% Earthwork 0.13 0.13 0.00 0.00 0.00 0.13
82 Formation 5 WS-78/2 Subgrade- 50% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
83 Formation 5 WS-78/2 Subgrade- 100% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
84 Formation 5 WS-78/6 Embankment- 100% Earthwork 0.18 0.18 0.00 0.00 0.00 0.18
85 Formation 5 WS-78/6 Subgrade- 50% Earthwork 0.06 0.06 0.00 0.00 0.00 0.06
86 Formation 5 WS-78/6 Subgrade- 100% Earthwork 0.06 0.06 0.00 0.00 0.00 0.06
87 Formation 5 WS-80/2 Cutting- 100% Earthwork 0.03 0.03 0.00 0.00 0.00 0.03
88 Formation 5 WS-80/2 Embankment- 50% Earthwork 0.03 0.03 0.00 0.00 0.00 0.03
89 Formation 5 WS-80/2 Embankment- 100% Earthwork 0.15 0.15 0.00 0.00 0.00 0.15
90 Formation 5 WS-80/3 Embankment- 50% Earthwork 0.18 0.18 0.00 0.00 0.00 0.18
91 Formation 5 WS-82/2 Embankment- 100% Earthwork 0.14 0.14 0.00 0.00 0.00 0.14
92 Formation 5 WS-82/3 Embankment- 50% Earthwork 0.02 0.02 0.00 0.00 0.00 0.02
93 Formation 5 WS-82/3 Embankment- 100% Earthwork 0.18 0.18 0.00 0.00 0.00 0.18
94 Formation 5 WS-84/1 Blanket- 50% Blanket 0.12 0.12 0.00 0.00 0.00 0.12
95 Formation 5 WS-84/1 Blanket- 100% Blanket 0.12 0.12 0.00 0.00 0.00 0.12
96 Formation 5 WS-84/2 Blanket- 50% Blanket 0.29 0.29 0.00 0.00 0.00 0.29
97 Formation 5 WS-84/2 Blanket- 100% Blanket 0.29 0.29 0.00 0.00 0.00 0.29
98 Formation 5 WS-87/1 Subgrade- 50% Earthwork 0.06 0.06 0.00 0.00 0.00 0.06
99 Formation 5 WS-87/1 Subgrade- 100% Earthwork 0.06 0.06 0.00 0.00 0.00 0.06
100 Formation 5 WS-87/2 Subgrade- 50% Earthwork 0.07 0.07 0.00 0.00 0.00 0.07
101 Formation 5 WS-87/2 Subgrade- 100% Earthwork 0.07 0.07 0.00 0.00 0.00 0.07
102 Formation 5 WS-87/5 Subgrade- 50% Earthwork 0.04 0.04 0.00 0.00 0.00 0.04
103 Formation 5 WS-87/5 Subgrade- 100% Earthwork 0.04 0.04 0.00 0.00 0.00 0.04
104 Formation 5 WS-88/1 Embankment- 50% Earthwork 0.03 0.03 0.00 0.00 0.00 0.03
105 Formation 5 WS-88/1 Embankment- 100% Earthwork 0.03 0.03 0.00 0.00 0.00 0.03
106 Formation 5 WS-88/1 Subgrade- 50% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
107 Formation 5 WS-88/1 Subgrade- 100% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
108 Formation 5 WS-89/2 Embankment- 50% Earthwork 0.02 0.02 0.00 0.00 0.00 0.02
109 Formation 5 WS-89/2 Embankment- 100% Earthwork 0.02 0.02 0.00 0.00 0.00 0.02
110 Formation 5 WS-89/2 Subgrade- 50% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
111 Formation 5 WS-89/2 Subgrade- 100% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
112 Formation 5 WS-89/3 Blanket- 50% Blanket 0.36 0.36 0.00 0.00 0.00 0.36
113 Formation 5 WS-89/3 Blanket- 100% Blanket 0.36 0.36 0.00 0.00 0.00 0.36
114 Formation 5 WS-90/1 Embankment- 50% Earthwork 0.06 0.06 0.00 0.00 0.00 0.06
115 Formation 5 WS-90/1 Embankment- 100% Earthwork 0.06 0.06 0.00 0.00 0.00 0.06
116 Formation 5 WS-90/1 Subgrade- 50% Earthwork 0.02 0.02 0.00 0.00 0.00 0.02
117 Formation 5 WS-90/1 Subgrade- 100% Earthwork 0.02 0.02 0.00 0.00 0.00 0.02
118 Formation 5 WS-90/1 Blanket- 50% Blanket 0.05 0.05 0.00 0.00 0.00 0.05
119 Formation 5 WS-90/1 Blanket- 100% Blanket 0.05 0.05 0.00 0.00 0.00 0.05
120 Formation 5 WS-90/5 Blanket- 100% Blanket 0.28 0.28 0.00 0.00 0.00 0.28
121 Formation 5 WS-91/1 Blanket- 100% Blanket 0.37 0.37 0.00 0.00 0.00 0.37
122 Formation 5 WS-91/2 Cutting- 50% Earthwork 0.15 0.15 0.00 0.00 0.00 0.15
123 Structure 5 347&348 Foundation IMB/MJB 1.38 1.38 0.69 0.69 1.38 1.38 1.38 0.00 4.15
124 Structure 5 349 Foundation IMB/MJB 0.48 0.48 0.48 0.48 0.97 1.38 1.38 0.00 2.83
125 Structure 5 369 Superstructure IMB/MJB 2.09 2.09 0.00 0.00 0.00 2.09
126 Structure 5 344 Completion MIB 0.29 0.29 0.00 0.00 0.00 0.29
127 Structure 5 350 Completion MIB 0.37 0.37 0.00 0.00 0.00 0.37
128 Structure 5 369A Completion MIB 0.02 0.02 0.00 0.00 0.00 0.02
129 Structure 5 381A Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
130 Structure 5 382-A Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
131 Structure 5 412-B Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
132 Structure 5 LC20 Completion RUB 1.40 1.40 0.00 0.00 0.00 1.40
133 Structure 5 RFO-3 Superstructure IMB/MJB 0.00 1.01 1.01 0.00 0.00 1.01
134 Structure 5 364 2% Completion IMB/MJB 0.00 0.05 0.05 0.00 0.00 0.05
135 Structure 5 366A 2% Completion IMB/MJB 0.00 0.06 0.06 0.00 0.00 0.06
136 Structure 5 391 2% Completion IMB/MJB 0.00 0.11 0.11 0.00 0.00 0.11
137 Structure 5 FOB - Madar Completion FOB 0.00 0.61 0.61 0.00 0.00 0.61
138 Structure 5 353 Completion MIB 0.00 0.52 0.52 0.00 0.00 0.52
139 Structure 5 353B Completion MIB 0.00 0.01 0.01 0.00 0.00 0.01
140 Structure 5 358 Completion MIB 0.00 0.60 0.60 0.00 0.00 0.60
141 Structure 5 359 Completion MIB 0.00 0.07 0.07 0.00 0.00 0.07
142 Structure 5 369B Completion MIB 0.00 0.02 0.02 0.00 0.00 0.02
143 Structure 5 LC7 Completion RUB 0.00 0.90 0.90 0.00 0.00 0.90
144 Structure 5 LC10 Completion RUB 0.00 1.14 1.14 0.00 0.00 1.14
145 Structure 5 Bangurgram Plinth Building 0.03 0.03 0.00 0.00 0.00 0.03
146 Structure 5 Bangurgram Plinth Building 0.00 0.15 0.15 0.00 0.00 0.15
147 Formation 5 WS-66/1/2 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.44 0.44 0.00 0.00 0.00 0.44
148 Formation 5 WS-72/1/2 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.64 0.64 0.00 0.00 0.00 0.64
149 Formation 5 WS-73/8 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.26 0.26 0.00 0.00 0.00 0.26
150 Formation 5 WS-72/1/1 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.29 0.29 0.00 0.00 0.29
151 Formation 5 WS-72/1/3 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.62 0.62 0.00 0.00 0.62
152 Formation 5 WS-73/4 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.46 0.46 0.00 0.00 0.46
153 Formation 5 WS-65/5 Cutting- 50% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
154 Formation 5 WS-65/5 Cutting- 100% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
155 Formation 5 WS-66/2/1 Embankment- 50% Earthwork 0.20 0.20 0.00 0.00 0.00 0.20
156 Formation 5 WS-66/2/2 Embankment- 100% Earthwork 0.15 0.15 0.00 0.00 0.00 0.15
157 Formation 5 WS-67/2/4 Cutting- 50% Earthwork 0.14 0.14 0.00 0.00 0.00 0.14
158 Formation 5 WS-67/2/4 Cutting- 100% Earthwork 0.14 0.14 0.00 0.00 0.00 0.14
159 Formation 5 WS-68/1 Embankment- 50% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
160 Formation 5 WS-68/1 Embankment- 100% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
161 Formation 5 WS-68/2 Embankment- 50% Earthwork 0.05 0.05 0.00 0.00 0.00 0.05
162 Formation 5 WS-68/2 Embankment- 100% Earthwork 0.05 0.05 0.00 0.00 0.00 0.05
163 Formation 5 WS-68/2 Subgrade- 50% Earthwork 0.02 0.02 0.00 0.00 0.00 0.02
164 Formation 5 WS-68/2 Subgrade- 100% Earthwork 0.02 0.02 0.00 0.00 0.00 0.02
165 Formation 5 WS-69/1 Subgrade- 50% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
166 Formation 5 WS-69/1 Subgrade- 100% Earthwork 0.15 0.15 0.00 0.00 0.00 0.15
167 Formation 5 WS-69/1 Blanket- 50% Blanket 0.37 0.37 0.00 0.00 0.00 0.37
168 Formation 5 WS-69/2 Subgrade- 50% Earthwork 0.02 0.02 0.00 0.00 0.00 0.02
169 Formation 5 WS-69/2 Subgrade- 100% Earthwork 0.13 0.13 0.00 0.00 0.00 0.13
170 Formation 5 WS-70/1/1 Embankment- 50% Earthwork 0.22 0.22 0.00 0.00 0.00 0.22
171 Formation 5 WS-70/1/2 Embankment- 50% Earthwork 0.04 0.04 0.00 0.00 0.00 0.04
172 Formation 5 WS-70/1/2 Embankment- 100% Earthwork 0.24 0.24 0.00 0.00 0.00 0.24
173 Formation 5 WS-70/1/4 Embankment- 50% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
174 Formation 5 WS-70/1/4 Embankment- 100% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
175 Formation 5 WS-70/1/4 Subgrade- 50% Earthwork 0.02 0.02 0.00 0.00 0.00 0.02
176 Formation 5 WS-70/1/4 Subgrade- 100% Earthwork 0.02 0.02 0.00 0.00 0.00 0.02
177 Formation 5 WS-72/1/2 Subgrade- 50% Earthwork 0.02 0.02 0.00 0.00 0.00 0.02
178 Formation 5 WS-72/1/2 Subgrade- 100% Earthwork 0.02 0.02 0.00 0.00 0.00 0.02
179 Formation 5 WS-72/1/2 Blanket- 50% Blanket 0.05 0.05 0.00 0.00 0.00 0.05
180 Formation 5 WS-72/1/2 Blanket- 100% Blanket 0.05 0.05 0.00 0.00 0.00 0.05
181 Formation 5 WS-72/1/3 Blanket- 50% Blanket 0.10 0.10 0.00 0.00 0.00 0.10
182 Formation 5 WS-72/1/3 Blanket- 100% Blanket 0.10 0.10 0.00 0.00 0.00 0.10
183 Formation 5 WS-72/1/4 Blanket- 50% Blanket 0.01 0.01 0.00 0.00 0.00 0.01
184 Formation 5 WS-72/1/4 Blanket- 100% Blanket 0.01 0.01 0.00 0.00 0.00 0.01
185 Formation 5 WS-72/2/1 Blanket- 50% Blanket 0.03 0.03 0.00 0.00 0.00 0.03
186 Formation 5 WS-72/2/1 Blanket- 100% Blanket 0.03 0.03 0.00 0.00 0.00 0.03
187 Formation 5 WS-74/1/1 Embankment- 50% Earthwork 0.03 0.03 0.00 0.00 0.00 0.03
188 Formation 5 WS-74/1/1 Embankment- 100% Earthwork 0.03 0.03 0.00 0.00 0.00 0.03
189 Formation 5 WS-74/1/1 Subgrade- 50% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
190 Formation 5 WS-74/1/1 Subgrade- 100% Earthwork 0.01 0.01 0.00 0.00 0.00 0.01
191 Formation 5 WS-74/2/3 Blanket- 50% Blanket 0.02 0.02 0.00 0.00 0.00 0.02
192 Formation 5 WS-74/2/3 Blanket- 100% Blanket 0.02 0.02 0.00 0.00 0.00 0.02
193 Formation 5 WS-75/5 Cutting- 50% Earthwork 0.09 0.09 0.00 0.00 0.00 0.09
194 Formation 5 WS-78/4 Embankment- 100% Earthwork 0.30 0.30 0.00 0.00 0.00 0.30
195 Formation 5 WS-78/4 Subgrade- 50% Earthwork 0.10 0.10 0.00 0.00 0.00 0.10
196 Formation 5 WS-78/4 Subgrade- 100% Earthwork 0.10 0.10 0.00 0.00 0.00 0.10
197 Formation 5 WS-80/3 Embankment- 100% Earthwork 0.18 0.18 0.00 0.00 0.00 0.18
198 Formation 5 WS-85 Blanket- 50% Blanket 0.31 0.31 0.00 0.00 0.00 0.31
199 Formation 5 WS-85 Blanket- 100% Blanket 0.31 0.31 0.00 0.00 0.00 0.31
200 Formation 5 WS-87/3 Embankment- 50% Earthwork 0.06 0.06 0.00 0.00 0.00 0.06
201 Formation 5 WS-87/3 Embankment- 100% Earthwork 0.06 0.06 0.00 0.00 0.00 0.06
202 Formation 5 WS-87/3 Subgrade- 50% Earthwork 0.05 0.05 0.00 0.00 0.00 0.05
203 Formation 5 WS-87/3 Subgrade- 100% Earthwork 0.05 0.05 0.00 0.00 0.00 0.05
204 Formation 5 WS-87/6 Embankment- 50% Earthwork 0.09 0.09 0.00 0.00 0.00 0.09
205 Formation 5 WS-88/3 Cutting- 50% Earthwork 0.19 0.19 0.00 0.00 0.00 0.19
206 Formation 5 WS-89/1 Blanket- 50% Blanket 0.05 0.05 0.00 0.00 0.00 0.05
207 Formation 5 WS-89/1 Blanket- 100% Blanket 0.05 0.05 0.00 0.00 0.00 0.05
208 Formation 5 WS-89/2 Blanket- 50% Blanket 0.18 0.18 0.00 0.00 0.00 0.18
209 Formation 5 WS-89/2 Blanket- 100% Blanket 0.18 0.18 0.00 0.00 0.00 0.18
210 Formation 5 WS-90/4 Embankment- 50% Earthwork 0.19 0.19 0.00 0.00 0.00 0.19
211 Formation 5 WS-90/4 Embankment- 100% Earthwork 0.19 0.19 0.00 0.00 0.00 0.19
212 Formation 5 WS-90/4 Subgrade- 50% Earthwork 0.06 0.06 0.00 0.00 0.00 0.06
213 Formation 5 WS-90/4 Subgrade- 100% Earthwork 0.06 0.06 0.00 0.00 0.00 0.06
214 Formation 5 WS-90/5 Embankment- 50% Earthwork 0.06 0.06 0.00 0.00 0.00 0.06
215 Formation 5 WS-90/5 Embankment- 100% Earthwork 0.06 0.06 0.00 0.00 0.00 0.06
216 Formation 5 WS-90/5 Subgrade- 50% Earthwork 0.02 0.02 0.00 0.00 0.00 0.02
217 Formation 5 WS-90/5 Subgrade- 100% Earthwork 0.02 0.02 0.00 0.00 0.00 0.02
218 Formation 5 WS-91/2 Cutting- 100% Earthwork 0.15 0.15 0.00 0.00 0.00 0.15
219 Formation 5 WS-91/2 Embankment- 50% Earthwork 0.04 0.04 0.00 0.00 0.00 0.04
220 Formation 5 WS-91/2 Embankment- 100% Earthwork 0.04 0.04 0.00 0.00 0.00 0.04
221 Formation 5 WS-91/2 Subgrade- 50% Earthwork 0.05 0.05 0.00 0.00 0.00 0.05
222 Formation 5 WS-91/2 Subgrade- 100% Earthwork 0.05 0.05 0.00 0.00 0.00 0.05
223 Formation 5 WS-65/1 Embankment- 50% Earthwork 0.00 0.13 0.13 0.00 0.00 0.13
224 Formation 5 WS-65/1 Embankment- 100% Earthwork 0.00 0.13 0.13 0.00 0.00 0.13
225 Formation 5 WS-65/1 Subgrade- 50% Earthwork 0.00 0.04 0.04 0.00 0.00 0.04
226 Formation 5 WS-65/1 Subgrade- 100% Earthwork 0.00 0.04 0.04 0.00 0.00 0.04
227 Formation 5 WS-65/2 Embankment- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
228 Formation 5 WS-65/2 Embankment- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
229 Formation 5 WS-65/2 Blanket- 50% Blanket 0.00 0.01 0.01 0.00 0.00 0.01
230 Formation 5 WS-65/2 Blanket- 100% Blanket 0.00 0.01 0.01 0.00 0.00 0.01
231 Formation 5 WS-65/5 Embankment- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
232 Formation 5 WS-65/5 Embankment- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
233 Formation 5 WS-65/5 Subgrade- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
234 Formation 5 WS-65/5 Subgrade- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
235 Formation 5 WS-65/5 Blanket- 50% Blanket 0.00 0.01 0.01 0.00 0.00 0.01
236 Formation 5 WS-65/5 Blanket- 100% Blanket 0.00 0.01 0.01 0.00 0.00 0.01
237 Formation 5 WS-65/6 Embankment- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
238 Formation 5 WS-65/6 Embankment- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
239 Formation 5 WS-65/6 Subgrade- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
240 Formation 5 WS-65/6 Subgrade- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
241 Formation 5 WS-66/2/1 Embankment- 100% Earthwork 0.00 0.20 0.20 0.00 0.00 0.20
242 Formation 5 WS-68/3 Blanket- 50% Blanket 0.00 0.03 0.03 0.00 0.00 0.03
243 Formation 5 WS-68/3 Blanket- 100% Blanket 0.00 0.03 0.03 0.00 0.00 0.03
244 Formation 5 WS-68/4 Embankment- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
245 Formation 5 WS-68/4 Embankment- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
246 Formation 5 WS-69/1 Blanket- 50% Blanket 0.00 0.03 0.03 0.00 0.00 0.03
247 Formation 5 WS-69/1 Blanket- 100% Blanket 0.00 0.40 0.40 0.00 0.00 0.40
248 Formation 5 WS-69/2 Blanket- 50% Blanket 0.00 0.28 0.28 0.00 0.00 0.28
249 Formation 5 WS-70/1/1 Embankment- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
250 Formation 5 WS-70/1/1 Embankment- 100% Earthwork 0.00 0.23 0.23 0.00 0.00 0.23
251 Formation 5 WS-70/1/2 Subgrade- 50% Earthwork 0.00 0.06 0.06 0.00 0.00 0.06
252 Formation 5 WS-73/5 Cutting- 50% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
253 Formation 5 WS-73/5 Cutting- 100% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
254 Formation 5 WS-74/1/3 Embankment- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
255 Formation 5 WS-74/1/3 Embankment- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
256 Formation 5 WS-75/3 Embankment- 50% Earthwork 0.00 0.29 0.29 0.00 0.00 0.29
257 Formation 5 WS-80/2 Subgrade- 50% Earthwork 0.00 0.06 0.06 0.00 0.00 0.06
258 Formation 5 WS-80/2 Subgrade- 100% Earthwork 0.00 0.05 0.05 0.00 0.00 0.05
259 Formation 5 WS-83/2 Cutting- 100% Earthwork 0.00 0.15 0.15 0.00 0.00 0.15
260 Formation 5 WS-86/4 Embankment- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
261 Formation 5 WS-86/4 Embankment- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
262 Formation 5 WS-87/1 Cutting- 50% Earthwork 0.00 0.15 0.15 0.00 0.00 0.15
263 Formation 5 WS-87/1 Cutting- 100% Earthwork 0.00 0.15 0.15 0.00 0.00 0.15
264 Formation 5 WS-87/2 Cutting- 50% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
265 Formation 5 WS-87/2 Cutting- 100% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
266 Formation 5 WS-87/6 Embankment- 100% Earthwork 0.00 0.09 0.09 0.00 0.00 0.09
267 Formation 5 WS-87/6 Subgrade- 50% Earthwork 0.00 0.03 0.03 0.00 0.00 0.03
268 Formation 5 WS-87/6 Subgrade- 100% Earthwork 0.00 0.03 0.03 0.00 0.00 0.03
269 Formation 5 WS-88/3 Cutting- 100% Earthwork 0.00 0.19 0.19 0.00 0.00 0.19
270 Formation 5 WS-88/3 Embankment- 50% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
271 Formation 5 WS-88/3 Embankment- 100% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
272 Formation 5 WS-88/3 Subgrade- 50% Earthwork 0.00 0.06 0.06 0.00 0.00 0.06
273 Formation 5 WS-88/3 Subgrade- 100% Earthwork 0.00 0.06 0.06 0.00 0.00 0.06
274 Formation 5 WS-89/3 Embankment- 50% Earthwork 0.00 0.10 0.10 0.00 0.00 0.10
275 Formation 5 WS-89/3 Embankment- 100% Earthwork 0.00 0.10 0.10 0.00 0.00 0.10
276 Formation 5 WS-89/3 Subgrade- 50% Earthwork 0.00 0.03 0.03 0.00 0.00 0.03
277 Formation 5 WS-89/3 Subgrade- 100% Earthwork 0.00 0.03 0.03 0.00 0.00 0.03
278 Formation 5 WS-90/2 Embankment- 50% Earthwork 0.00 0.10 0.10 0.00 0.00 0.10
279 Formation 5 WS-90/2 Embankment- 100% Earthwork 0.00 0.10 0.10 0.00 0.00 0.10
280 Formation 5 WS-90/2 Subgrade- 50% Earthwork 0.00 0.03 0.03 0.00 0.00 0.03
281 Formation 5 WS-90/2 Subgrade- 100% Earthwork 0.00 0.03 0.03 0.00 0.00 0.03
282 Formation 5 WS-90/3 Embankment- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
283 Formation 5 WS-90/3 Embankment- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
284 Formation 5 WS-90/5 Blanket- 100% Blanket 0.00 0.06 0.06 0.00 0.00 0.06
285 Formation 5 WS-91/2 Blanket- 50% Blanket 0.00 0.14 0.14 0.00 0.00 0.14
286 Structure 5 379 IMB/MJB 0.00 0.13 0.13 0.00 0.00 0.13
287 Structure 5 LC46/1 Completion RUB 0.00 0.68 0.68 0.00 0.00 0.68
288 Structure 5 352 Completion MiB 0.00 0.64 0.64 0.00 0.00 0.64
289 Structure 5 353-D Completion MiB 0.00 0.04 0.04 0.00 0.00 0.04
290 Structure 5 360 Completion MiB 0.00 0.09 0.09 0.00 0.00 0.09
291 Structure 5 361 Completion MiB 0.00 0.10 0.10 0.00 0.00 0.10
292 Structure 5 Durai Completion PS 0.00 0.67 0.67 0.00 0.00 0.67
293 Structure 5 420 IMB/MJB 0.00 1.45 1.45 0.00 0.00 1.45
294 Structure 5 LC42/1 Completion RUB 0.00 1.28 1.28 0.00 0.00 1.28
295 Structure 5 351 Completion MiB 0.00 0.91 0.91 0.00 0.00 0.91
296 Structure 5 362 Completion MiB 0.00 0.50 0.50 0.00 0.00 0.50
297 Structure 5 363 Completion MiB 0.00 0.10 0.10 0.00 0.00 0.10
298 Structure 5 FOB - Durai Completion FOB 0.00 0.61 0.61 0.00 0.00 0.61
299 Structure 5 LC11 Completion RUB 0.00 0.99 0.99 0.00 0.00 0.99
300 Structure 5 421-B Completion MiB 0.00 0.04 0.04 0.00 0.00 0.04
301 Structure 5 Saradhana Building Building Building 0.00 0.19 0.19 0.00 0.00 0.19
302 Structure 5 Bangurgram Building Building Building 0.00 0.08 0.23 0.31 0.00 0.00 0.31
303 Formation 5 WS-73/3 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.48 0.48 0.00 0.00 0.48
304 Formation 5 WS-73/6 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.74 0.74 0.00 0.00 0.74
305 Formation 5 WS-66/1/3 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.34 0.34 0.00 0.00 0.34
306 Formation 5 WS-70/2/7 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.24 0.24 0.00 0.00 0.24
307 Formation 5 WS-73/5 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.74 0.74 0.00 0.00 0.74
308 Formation 5 WS-65/6 Cutting- 50% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
309 Formation 5 WS-65/6 Cutting- 100% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
310 Formation 5 WS-66/1/1 Embankment- 50% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
311 Formation 5 WS-66/1/1 Embankment- 100% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
312 Formation 5 WS-66/1/1 Subgrade- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
313 Formation 5 WS-66/1/1 Subgrade- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
314 Formation 5 WS-66/1/2 Embankment- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
315 Formation 5 WS-66/1/2 Embankment- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
316 Formation 5 WS-66/1/2 Blanket- 50% Blanket 0.00 0.01 0.01 0.00 0.00 0.01
317 Formation 5 WS-66/1/2 Blanket- 100% Blanket 0.00 0.01 0.01 0.00 0.00 0.01
318 Formation 5 WS-66/1/4 Embankment- 50% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
319 Formation 5 WS-66/1/4 Embankment- 100% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
320 Formation 5 WS-66/1/4 Subgrade- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
321 Formation 5 WS-66/1/4 Subgrade- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
322 Formation 5 WS-66/1/4 Blanket- 50% Blanket 0.00 0.02 0.02 0.00 0.00 0.02
323 Formation 5 WS-66/1/4 Blanket- 100% Blanket 0.00 0.02 0.02 0.00 0.00 0.02
324 Formation 5 WS-66/1/5 Embankment- 50% Earthwork 0.00 0.07 0.07 0.00 0.00 0.07
325 Formation 5 WS-66/1/5 Embankment- 100% Earthwork 0.00 0.07 0.07 0.00 0.00 0.07
326 Formation 5 WS-66/1/5 Subgrade- 50% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
327 Formation 5 WS-66/1/5 Subgrade- 100% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
328 Formation 5 WS-66/1/5 Blanket- 50% Blanket 0.00 0.18 0.18 0.00 0.00 0.18
329 Formation 5 WS-66/1/5 Blanket- 100% Blanket 0.00 0.18 0.18 0.00 0.00 0.18
330 Formation 5 WS-66/2/1 Subgrade- 50% Earthwork 0.00 0.06 0.06 0.00 0.00 0.06
331 Formation 5 WS-66/2/1 Subgrade- 100% Earthwork 0.00 0.06 0.06 0.00 0.00 0.06
332 Formation 5 WS-66/2/2 Cutting- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
333 Formation 5 WS-66/2/2 Cutting- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
334 Formation 5 WS-66/2/2 Subgrade- 50% Earthwork 0.00 0.05 0.05 0.00 0.00 0.05
335 Formation 5 WS-66/2/2 Subgrade- 100% Earthwork 0.00 0.05 0.05 0.00 0.00 0.05
336 Formation 5 WS-67/1/1 Cutting- 50% Earthwork 0.00 0.10 0.10 0.00 0.00 0.10
337 Formation 5 WS-67/1/1 Cutting- 100% Earthwork 0.00 0.21 0.21 0.00 0.00 0.21
338 Formation 5 WS-67/2/4 Cutting- 50% Earthwork 0.00 0.03 0.03 0.00 0.00 0.03
339 Formation 5 WS-67/2/4 Cutting- 100% Earthwork 0.00 0.03 0.03 0.00 0.00 0.03
340 Formation 5 WS-67/2/4 Subgrade- 50% Earthwork 0.00 0.04 0.04 0.00 0.00 0.04
341 Formation 5 WS-67/2/4 Subgrade- 100% Earthwork 0.00 0.04 0.04 0.00 0.00 0.04
342 Formation 5 WS-69/2 Blanket- 50% Blanket 0.00 0.06 0.06 0.00 0.00 0.06
343 Formation 5 WS-69/2 Blanket- 100% Blanket 0.00 0.28 0.28 0.00 0.00 0.28
344 Formation 5 WS-70/1/2 Subgrade- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
345 Formation 5 WS-70/1/2 Subgrade- 100% Earthwork 0.00 0.08 0.08 0.00 0.00 0.08
346 Formation 5 WS-73/1 Embankment- 50% Earthwork 0.00 0.03 0.03 0.00 0.00 0.03
347 Formation 5 WS-73/1 Embankment- 100% Earthwork 0.00 0.03 0.03 0.00 0.00 0.03
348 Formation 5 WS-73/2 Embankment- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
349 Formation 5 WS-73/2 Embankment- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
350 Formation 5 WS-73/5 Embankment- 50% Earthwork 0.00 0.05 0.05 0.00 0.00 0.05
351 Formation 5 WS-73/5 Embankment- 100% Earthwork 0.00 0.05 0.05 0.00 0.00 0.05
352 Formation 5 WS-73/5 Subgrade- 50% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
353 Formation 5 WS-73/5 Subgrade- 100% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
354 Formation 5 WS-73/6 Embankment- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
355 Formation 5 WS-73/6 Embankment- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
356 Formation 5 WS-75/5 Cutting- 100% Earthwork 0.00 0.09 0.09 0.00 0.00 0.09
357 Formation 5 WS-78/1 Blanket- 50% Blanket 0.00 0.34 0.34 0.00 0.00 0.34
358 Formation 5 WS-78/6 Blanket- 50% Blanket 0.00 0.15 0.15 0.00 0.00 0.15
359 Formation 5 WS-80/2 Subgrade- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
360 Formation 5 WS-88/1 Blanket- 50% Blanket 0.00 0.11 0.11 0.00 0.00 0.11
361 Formation 5 WS-88/1 Blanket- 100% Blanket 0.00 0.11 0.11 0.00 0.00 0.11
362 Formation 5 WS-88/2 Cutting- 50% Earthwork 0.00 0.21 0.21 0.00 0.00 0.21
363 Formation 5 WS-88/3 Blanket- 50% Blanket 0.00 0.19 0.19 0.00 0.00 0.19
364 Formation 5 WS-88/3 Blanket- 100% Blanket 0.00 0.19 0.19 0.00 0.00 0.19
365 Formation 5 WS-91/2 Blanket- 100% Blanket 0.00 0.36 0.36 0.00 0.00 0.36
366 Formation 5 WS-66/2/1 Embankment- 50% Earthwork 0.00 0.10 0.10 0.00 0.00 0.10
367 Formation 5 WS-66/2/1 Embankment- 100% Earthwork 0.00 0.10 0.10 0.00 0.00 0.10
368 Formation 5 WS-66/2/1 Subgrade- 50% Earthwork 0.00 0.03 0.03 0.00 0.00 0.03
369 Formation 5 WS-66/2/1 Subgrade- 100% Earthwork 0.00 0.03 0.03 0.00 0.00 0.03
370 Formation 5 WS-66/2/2 Embankment- 50% Earthwork 0.00 0.07 0.07 0.00 0.00 0.07
371 Formation 5 WS-66/2/2 Embankment- 100% Earthwork 0.00 0.07 0.07 0.00 0.00 0.07
372 Formation 5 WS-66/2/2 Subgrade- 50% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
373 Formation 5 WS-66/2/2 Subgrade- 100% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
374 Formation 5 WS-67/1/2 Embankment- 50% Earthwork 0.00 0.15 0.15 0.00 0.00 0.15
375 Formation 5 WS-67/1/2 Embankment- 100% Earthwork 0.00 0.15 0.15 0.00 0.00 0.15
376 Formation 5 WS-67/2/1 Embankment- 50% Earthwork 0.00 0.19 0.19 0.00 0.00 0.19
377 Formation 5 WS-67/2/1 Embankment- 100% Earthwork 0.00 0.19 0.19 0.00 0.00 0.19
378 Formation 5 WS-67/2/2 Embankment- 50% Earthwork 0.00 0.27 0.27 0.00 0.00 0.27
379 Formation 5 WS-67/2/2 Embankment- 100% Earthwork 0.00 0.27 0.27 0.00 0.00 0.27
380 Formation 5 WS-68/1 Blanket- 50% Blanket 0.00 0.01 0.01 0.00 0.00 0.01
381 Formation 5 WS-68/1 Blanket- 100% Blanket 0.00 0.01 0.01 0.00 0.00 0.01
382 Formation 5 WS-68/2 Blanket- 50% Blanket 0.00 0.05 0.05 0.00 0.00 0.05
383 Formation 5 WS-68/2 Blanket- 100% Blanket 0.00 0.05 0.05 0.00 0.00 0.05
384 Formation 5 WS-68/4 Blanket- 50% Blanket 0.00 0.01 0.01 0.00 0.00 0.01
385 Formation 5 WS-68/4 Blanket- 100% Blanket 0.00 0.01 0.01 0.00 0.00 0.01
386 Formation 5 WS-69/2 Blanket- 100% Blanket 0.00 0.06 0.06 0.00 0.00 0.06
387 Formation 5 WS-70/1/1 Blanket- 50% Blanket 0.00 0.21 0.21 0.00 0.00 0.21
388 Formation 5 WS-70/1/3 Cutting- 50% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
389 Formation 5 WS-70/1/3 Cutting- 100% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
390 Formation 5 WS-70/1/3 Blanket- 50% Blanket 0.00 0.11 0.11 0.00 0.00 0.11
391 Formation 5 WS-72/1/2 Cutting- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
392 Formation 5 WS-72/1/2 Cutting- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
393 Formation 5 WS-73/1 Subgrade- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
394 Formation 5 WS-73/1 Subgrade- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
395 Formation 5 WS-73/1 Blanket- 50% Blanket 0.00 0.03 0.03 0.00 0.00 0.03
396 Formation 5 WS-73/1 Blanket- 100% Blanket 0.00 0.03 0.03 0.00 0.00 0.03
397 Formation 5 WS-73/3 Embankment- 50% Earthwork 0.00 0.03 0.03 0.00 0.00 0.03
398 Formation 5 WS-73/3 Embankment- 100% Earthwork 0.00 0.03 0.03 0.00 0.00 0.03
399 Formation 5 WS-73/3 Subgrade- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
400 Formation 5 WS-73/3 Subgrade- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
401 Formation 5 WS-73/3 Blanket- 50% Blanket 0.00 0.02 0.02 0.00 0.00 0.02
402 Formation 5 WS-73/3 Blanket- 100% Blanket 0.00 0.02 0.02 0.00 0.00 0.02
403 Formation 5 WS-73/5 Blanket- 50% Blanket 0.00 0.05 0.05 0.00 0.00 0.05
404 Formation 5 WS-73/5 Blanket- 100% Blanket 0.00 0.05 0.05 0.00 0.00 0.05
405 Formation 5 WS-73/6 Blanket- 50% Blanket 0.00 0.01 0.01 0.00 0.00 0.01
406 Formation 5 WS-73/6 Blanket- 100% Blanket 0.00 0.01 0.01 0.00 0.00 0.01
407 Formation 5 WS-73/7 Embankment- 50% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
408 Formation 5 WS-73/7 Embankment- 100% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
409 Formation 5 WS-73/7 Subgrade- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
410 Formation 5 WS-73/7 Subgrade- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
411 Formation 5 WS-73/8 Embankment- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
412 Formation 5 WS-73/8 Embankment- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
413 Formation 5 WS-74/1/4 Embankment- 50% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
414 Formation 5 WS-74/1/4 Embankment- 100% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
415 Formation 5 WS-74/1/4 Subgrade- 50% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
416 Formation 5 WS-74/1/4 Subgrade- 100% Earthwork 0.00 0.01 0.01 0.00 0.00 0.01
417 Formation 5 WS-74/1/5 Embankment- 50% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
418 Formation 5 WS-74/1/5 Embankment- 100% Earthwork 0.00 0.02 0.02 0.00 0.00 0.02
419 Formation 5 WS-75/3 Embankment- 100% Earthwork 0.00 0.26 0.26 0.00 0.00 0.26
420 Formation 5 WS-76/5 Embankment- 50% Earthwork 0.00 0.12 0.12 0.00 0.00 0.12
421 Formation 5 WS-76/6 Blanket- 50% Blanket 0.00 0.14 0.14 0.00 0.00 0.14
422 Formation 5 WS-76/6 Blanket- 100% Blanket 0.00 0.14 0.14 0.00 0.00 0.14
423 Formation 5 WS-78/1 Blanket- 100% Blanket 0.00 0.34 0.34 0.00 0.00 0.34
424 Formation 5 WS-78/2 Blanket- 50% Blanket 0.00 0.31 0.31 0.00 0.00 0.31
425 Formation 5 WS-78/2 Blanket- 100% Blanket 0.00 0.31 0.31 0.00 0.00 0.31
426 Formation 5 WS-78/6 Blanket- 100% Blanket 0.00 0.15 0.15 0.00 0.00 0.15
427 Formation 5 WS-80/3 Cutting- 50% Earthwork 0.00 0.03 0.03 0.00 0.00 0.03
428 Formation 5 WS-81/3 Embankment- 100% Earthwork 0.00 0.21 0.21 0.00 0.00 0.21
429 Formation 5 WS-82/3 Cutting- 100% Earthwork 0.00 0.12 0.12 0.00 0.00 0.12
430 Formation 5 WS-82/3 Subgrade- 50% Earthwork 0.00 0.09 0.09 0.00 0.00 0.09
431 Formation 5 WS-82/3 Subgrade- 100% Earthwork 0.00 0.09 0.09 0.00 0.00 0.09
432 Structure 5 RFO-3 IMB/MJB 0.00 0.00 0.05 0.05 0.00 0.05
433 Structure 5 349 IMB/MJB 0.00 0.00 0.73 0.73 0.00 0.73
434 Structure 5 369 IMB/MJB 0.00 0.00 0.11 0.11 0.00 0.11
435 Structure 5 403 IMB/MJB 0.00 0.00 0.08 0.08 0.00 0.08
436 Structure 5 LC45/1 Completion RUB 0.00 0.00 1.13 1.13 0.00 1.13
437 Structure 5 LC47/1 Completion RUB 0.00 0.00 0.70 0.70 0.00 0.70
438 Structure 5 Saradhana Completion FOB 0.00 0.00 0.61 0.61 0.00 0.61
439 Structure 5 Makrera Completion FOB 0.00 0.00 0.61 0.61 0.00 0.61
440 Structure 5 Mangliyawas Completion PS 0.00 0.00 0.49 0.49 0.00 0.49
441 Structure 5 LC12 Completion RUB 0.00 0.00 1.39 1.39 0.00 1.39
442 Structure 5 LC16 Completion RUB 0.00 0.00 0.56 0.56 0.00 0.56
443 Structure 5 420-A Completion MIB 0.00 0.00 0.04 0.04 0.00 0.04
444 Structure 5 347&348 IMB/MJB 0.00 0.00 2.63 2.63 0.00 2.63
445 Structure 5 12/62300 Completion RUB 0.00 0.00 0.44 0.44 0.00 0.44
446 Structure 5 LC 48/1 Completion RUB 0.00 0.00 0.58 0.58 0.00 0.58
447 Structure 5 LC1 Completion RUB 0.00 0.00 0.52 0.52 0.00 0.52
448 Structure 5 LC3 Completion RUB 0.00 0.00 0.82 0.82 0.00 0.82
449 Structure 5 Makrera Completion PS 0.00 0.00 0.49 0.49 0.00 0.49
450 Structure 5 Mangaliyawas Completion FOB 0.00 0.00 0.61 0.61 0.00 0.61
451 Structure 5 Lamaana Completion PS 0.00 0.00 0.49 0.49 0.00 0.49
452 Structure 5 LC15 Completion RUB 0.00 0.00 0.56 0.56 0.00 0.56
453 Structure 5 420 IMB/MJB 0.00 0.00 0.08 0.08 0.00 0.08
454 Structure 5 LC-2 Completion RUB 0.00 0.00 0.80 0.80 0.00 0.80
455 Structure 5 Kharwa Completion PS 0.00 0.00 0.49 0.49 0.00 0.49
456 Structure 5 Kharwaa Completion FOB 0.00 0.00 0.61 0.61 0.00 0.61
457 Structure 5 LC22 Completion RUB 0.00 0.00 6.02 6.02 0.00 6.02
458 Structure 5 LC4 Completion RUB 0.00 0.00 0.00 3.38 3.38 3.38
459 Structure 5 LC6 Completion RUB 0.00 0.00 0.00 1.41 1.41 1.41
460 Structure 5 Lamana Completion FOB 0.00 0.00 0.00 0.61 0.61 0.61
461 Structure 5 LC18 Completion RUB 0.00 0.00 0.00 0.85 0.85 0.85
462 Structure 5 Piplaj Completion PS 0.00 0.00 0.00 0.50 0.50 0.50
463 Structure 5 347&348 IMB/MJB 0.00 0.00 0.00 0.14 0.14 0.14
464 Structure 5 349 IMB/MJB 0.00 0.00 0.00 0.07 0.07 0.07
465 Structure 5 LC13 Completion RUB 0.00 0.00 0.00 1.13 1.13 1.13
466 Structure 5 LC17 Completion RUB 0.00 0.00 0.00 1.38 1.38 1.38
467 Structure 5 Piplaaj Completion FOB 0.00 0.00 0.00 0.61 0.61 0.61
468 Formation 5 WS-65/1 Blanket- 50% Blanket 0.00 0.00 0.11 0.11 0.00 0.11
469 Formation 5 WS-65/1 Blanket- 100% Blanket 0.00 0.00 0.11 0.11 0.00 0.11
470 Formation 5 WS-65/6 Blanket- 50% Blanket 0.00 0.00 0.02 0.02 0.00 0.02
471 Formation 5 WS-65/6 Blanket- 100% Blanket 0.00 0.00 0.02 0.02 0.00 0.02
472 Formation 5 WS-66/1/1 Blanket- 50% Blanket 0.00 0.00 0.02 0.02 0.00 0.02
473 Formation 5 WS-66/1/1 Blanket- 100% Blanket 0.00 0.00 0.02 0.02 0.00 0.02
474 Formation 5 WS-67/1/2 Embankment- 50% Earthwork 0.00 0.00 0.11 0.11 0.00 0.11
475 Formation 5 WS-67/1/2 Embankment- 100% Earthwork 0.00 0.00 0.11 0.11 0.00 0.11
476 Formation 5 WS-67/2/1 Embankment- 50% Earthwork 0.00 0.00 0.03 0.03 0.00 0.03
477 Formation 5 WS-67/2/1 Embankment- 100% Earthwork 0.00 0.00 0.03 0.03 0.00 0.03
478 Formation 5 WS-67/2/1 Subgrade- 50% Earthwork 0.00 0.00 0.06 0.06 0.00 0.06
479 Formation 5 WS-67/2/1 Subgrade- 100% Earthwork 0.00 0.00 0.06 0.06 0.00 0.06
480 Formation 5 WS-67/2/2 Embankment- 50% Earthwork 0.00 0.00 0.03 0.03 0.00 0.03
481 Formation 5 WS-67/2/2 Embankment- 100% Earthwork 0.00 0.00 0.03 0.03 0.00 0.03
482 Formation 5 WS-67/2/2 Blanket- 50% Blanket 0.00 0.00 0.24 0.24 0.00 0.24
483 Formation 5 WS-67/2/2 Blanket- 100% Blanket 0.00 0.00 0.24 0.24 0.00 0.24
484 Formation 5 WS-67/2/3 Embankment- 50% Earthwork 0.00 0.00 0.32 0.32 0.00 0.32
485 Formation 5 WS-67/2/3 Embankment- 100% Earthwork 0.00 0.00 0.32 0.32 0.00 0.32
486 Formation 5 WS-67/2/4 Subgrade- 50% Earthwork 0.00 0.00 0.01 0.01 0.00 0.01
487 Formation 5 WS-67/2/4 Subgrade- 100% Earthwork 0.00 0.00 0.01 0.01 0.00 0.01
488 Formation 5 WS-67/2/4 Blanket- 50% Blanket 0.00 0.00 0.12 0.12 0.00 0.12
489 Formation 5 WS-67/2/4 Blanket- 100% Blanket 0.00 0.00 0.12 0.12 0.00 0.12
490 Formation 5 WS-68/3 Embankment- 50% Earthwork 0.00 0.00 0.04 0.04 0.00 0.04
491 Formation 5 WS-68/3 Embankment- 100% Earthwork 0.00 0.00 0.04 0.04 0.00 0.04
492 Formation 5 WS-70/1/1 Subgrade- 50% Earthwork 0.00 0.00 0.08 0.08 0.00 0.08
493 Formation 5 WS-70/1/1 Subgrade- 100% Earthwork 0.00 0.00 0.08 0.08 0.00 0.08
494 Formation 5 WS-70/1/1 Blanket- 100% Blanket 0.00 0.00 0.21 0.21 0.00 0.21
495 Formation 5 WS-70/1/2 Blanket- 50% Blanket 0.00 0.00 0.21 0.21 0.00 0.21
496 Formation 5 WS-70/1/3 Blanket- 100% Blanket 0.00 0.00 0.09 0.09 0.00 0.09
497 Formation 5 WS-70/2/7 Cutting- 50% Earthwork 0.00 0.00 0.01 0.01 0.00 0.01
498 Formation 5 WS-70/2/7 Cutting- 100% Earthwork 0.00 0.00 0.01 0.01 0.00 0.01
499 Formation 5 WS-71/6 Cutting- 50% Earthwork 0.00 0.00 0.06 0.06 0.00 0.06
500 Formation 5 WS-71/6 Cutting- 100% Earthwork 0.00 0.00 0.06 0.06 0.00 0.06
501 Formation 5 WS-73/2 Blanket- 50% Blanket 0.00 0.00 0.02 0.02 0.00 0.02
502 Formation 5 WS-73/2 Blanket- 100% Blanket 0.00 0.00 0.02 0.02 0.00 0.02
503 Formation 5 WS-73/7 Blanket- 50% Blanket 0.00 0.00 0.01 0.01 0.00 0.01
504 Formation 5 WS-73/7 Blanket- 100% Blanket 0.00 0.00 0.01 0.01 0.00 0.01
505 Formation 5 WS-74/1/1 Blanket- 50% Blanket 0.00 0.00 0.02 0.02 0.00 0.02
506 Formation 5 WS-74/1/1 Blanket- 100% Blanket 0.00 0.00 0.02 0.02 0.00 0.02
507 Formation 5 WS-74/1/3 Blanket- 50% Blanket 0.00 0.00 0.01 0.01 0.00 0.01
508 Formation 5 WS-74/1/3 Blanket- 100% Blanket 0.00 0.00 0.01 0.01 0.00 0.01
509 Formation 5 WS-74/1/4 Cutting- 50% Earthwork 0.00 0.00 0.03 0.03 0.00 0.03
510 Formation 5 WS-74/1/4 Cutting- 100% Earthwork 0.00 0.00 0.03 0.03 0.00 0.03
511 Formation 5 WS-74/1/4 Blanket- 50% Blanket 0.00 0.00 0.04 0.04 0.00 0.04
512 Formation 5 WS-74/1/4 Blanket- 100% Blanket 0.00 0.00 0.04 0.04 0.00 0.04
513 Formation 5 WS-74/1/5 Cutting- 50% Earthwork 0.00 0.00 0.03 0.03 0.00 0.03
514 Formation 5 WS-74/1/5 Cutting- 100% Earthwork 0.00 0.00 0.03 0.03 0.00 0.03
515 Formation 5 WS-74/1/5 Subgrade- 50% Earthwork 0.00 0.00 0.01 0.01 0.00 0.01
516 Formation 5 WS-74/1/5 Subgrade- 100% Earthwork 0.00 0.00 0.01 0.01 0.00 0.01
517 Formation 5 WS-75/1 Subgrade- 50% Earthwork 0.00 0.00 0.10 0.10 0.00 0.10
518 Formation 5 WS-75/1 Subgrade- 100% Earthwork 0.00 0.00 0.10 0.10 0.00 0.10
519 Formation 5 WS-75/1 Blanket- 50% Blanket 0.00 0.00 0.24 0.24 0.00 0.24
520 Formation 5 WS-75/1 Blanket- 100% Blanket 0.00 0.00 0.24 0.24 0.00 0.24
521 Formation 5 WS-75/3 Embankment- 100% Earthwork 0.00 0.00 0.03 0.03 0.00 0.03
522 Formation 5 WS-76/5 Embankment- 50% Earthwork 0.00 0.00 0.01 0.01 0.00 0.01
523 Formation 5 WS-76/5 Embankment- 100% Earthwork 0.00 0.00 0.13 0.13 0.00 0.13
524 Formation 5 WS-78/1 Blanket- 50% Blanket 0.00 0.00 0.01 0.01 0.00 0.01
525 Formation 5 WS-78/1 Blanket- 100% Blanket 0.00 0.00 0.01 0.01 0.00 0.01
526 Formation 5 WS-78/2 Blanket- 50% Blanket 0.00 0.00 0.02 0.02 0.00 0.02
527 Formation 5 WS-78/2 Blanket- 100% Blanket 0.00 0.00 0.02 0.02 0.00 0.02
528 Formation 5 WS-78/3 Embankment- 50% Earthwork 0.00 0.00 0.30 0.30 0.00 0.30
529 Formation 5 WS-78/3 Embankment- 100% Earthwork 0.00 0.00 0.30 0.30 0.00 0.30
530 Formation 5 WS-78/3 Subgrade- 50% Earthwork 0.00 0.00 0.10 0.10 0.00 0.10
531 Formation 5 WS-78/3 Subgrade- 100% Earthwork 0.00 0.00 0.10 0.10 0.00 0.10
532 Formation 5 WS-78/4 Blanket- 50% Blanket 0.00 0.00 0.27 0.27 0.00 0.27
533 Formation 5 WS-78/4 Blanket- 100% Blanket 0.00 0.00 0.27 0.27 0.00 0.27
534 Formation 5 WS-78/7 Embankment- 50% Earthwork 0.00 0.00 0.10 0.10 0.00 0.10
535 Formation 5 WS-80/2 Blanket- 50% Blanket 0.00 0.00 0.16 0.16 0.00 0.16
536 Formation 5 WS-80/3 Cutting- 100% Earthwork 0.00 0.00 0.03 0.03 0.00 0.03
537 Formation 5 WS-80/3 Subgrade- 50% Earthwork 0.00 0.00 0.05 0.05 0.00 0.05
538 Formation 5 WS-80/3 Subgrade- 100% Earthwork 0.00 0.00 0.05 0.05 0.00 0.05
539 Formation 5 WS-81/2 Embankment- 50% Earthwork 0.00 0.00 0.15 0.15 0.00 0.15
540 Formation 5 WS-81/4 Cutting- 100% Earthwork 0.00 0.00 0.01 0.01 0.00 0.01
541 Formation 5 WS-82/2 Cutting- 100% Earthwork 0.00 0.00 0.09 0.09 0.00 0.09
542 Formation 5 WS-82/2 Subgrade- 50% Earthwork 0.00 0.00 0.07 0.07 0.00 0.07
543 Formation 5 WS-82/2 Subgrade- 100% Earthwork 0.00 0.00 0.07 0.07 0.00 0.07
544 Formation 5 WS-83/1 Embankment- 50% Earthwork 0.00 0.00 0.04 0.04 0.00 0.04
545 Formation 5 WS-83/1 Embankment- 100% Earthwork 0.00 0.00 0.04 0.04 0.00 0.04
546 Formation 5 WS-83/1 Subgrade- 50% Earthwork 0.00 0.00 0.08 0.08 0.00 0.08
547 Formation 5 WS-83/1 Subgrade- 100% Earthwork 0.00 0.00 0.08 0.08 0.00 0.08
548 Formation 5 WS-84/1 Embankment- 50% Earthwork 0.00 0.00 0.11 0.11 0.00 0.11
549 Formation 5 WS-84/1 Embankment- 100% Earthwork 0.00 0.00 0.11 0.11 0.00 0.11
550 Formation 5 WS-84/1 Subgrade- 50% Earthwork 0.00 0.00 0.04 0.04 0.00 0.04
551 Formation 5 WS-84/1 Subgrade- 100% Earthwork 0.00 0.00 0.04 0.04 0.00 0.04
552 Formation 5 WS-84/1 Blanket- 50% Blanket 0.00 0.00 0.10 0.10 0.00 0.10
553 Formation 5 WS-84/1 Blanket- 100% Blanket 0.00 0.00 0.10 0.10 0.00 0.10
554 Formation 5 WS-87/2 Blanket- 50% Blanket 0.00 0.00 0.19 0.19 0.00 0.19
555 Formation 5 WS-87/2 Blanket- 100% Blanket 0.00 0.00 0.19 0.19 0.00 0.19
556 Formation 5 WS-87/3 Blanket- 50% Blanket 0.00 0.00 0.14 0.14 0.00 0.14
557 Formation 5 WS-87/3 Blanket- 100% Blanket 0.00 0.00 0.14 0.14 0.00 0.14
558 Formation 5 WS-87/6 Blanket- 50% Blanket 0.00 0.00 0.08 0.08 0.00 0.08
559 Formation 5 WS-87/6 Blanket- 100% Blanket 0.00 0.00 0.08 0.08 0.00 0.08
560 Formation 5 WS-88/2 Cutting- 100% Earthwork 0.00 0.00 0.21 0.21 0.00 0.21
561 Formation 5 WS-88/2 Embankment- 50% Earthwork 0.00 0.00 0.02 0.02 0.00 0.02
562 Formation 5 WS-88/2 Embankment- 100% Earthwork 0.00 0.00 0.02 0.02 0.00 0.02
563 Formation 5 WS-88/2 Subgrade- 50% Earthwork 0.00 0.00 0.06 0.06 0.00 0.06
564 Formation 5 WS-88/2 Subgrade- 100% Earthwork 0.00 0.00 0.06 0.06 0.00 0.06
565 Formation 5 WS-66/2/1 Blanket- 50% Blanket 0.00 0.00 0.26 0.26 0.00 0.26
566 Formation 5 WS-66/2/1 Blanket- 100% Blanket 0.00 0.00 0.26 0.26 0.00 0.26
567 Formation 5 WS-66/2/2 Blanket- 50% Blanket 0.00 0.00 0.20 0.20 0.00 0.20
568 Formation 5 WS-66/2/2 Blanket- 100% Blanket 0.00 0.00 0.20 0.20 0.00 0.20
569 Formation 5 WS-67/1/1 Embankment- 50% Earthwork 0.00 0.00 0.05 0.05 0.00 0.05
570 Formation 5 WS-67/1/1 Embankment- 100% Earthwork 0.00 0.00 0.05 0.05 0.00 0.05
571 Formation 5 WS-67/2/1 Subgrade- 50% Earthwork 0.00 0.00 0.01 0.01 0.00 0.01
572 Formation 5 WS-67/2/1 Subgrade- 100% Earthwork 0.00 0.00 0.01 0.01 0.00 0.01
573 Formation 5 WS-67/2/2 Blanket- 50% Blanket 0.00 0.00 0.02 0.02 0.00 0.02
574 Formation 5 WS-67/2/2 Blanket- 100% Blanket 0.00 0.00 0.02 0.02 0.00 0.02
575 Formation 5 WS-67/2/3 Subgrade- 50% Earthwork 0.00 0.00 0.11 0.11 0.00 0.11
576 Formation 5 WS-67/2/3 Subgrade- 100% Earthwork 0.00 0.00 0.11 0.11 0.00 0.11
577 Formation 5 WS-67/2/3 Blanket- 50% Blanket 0.00 0.00 0.28 0.28 0.00 0.28
578 Formation 5 WS-67/2/3 Blanket- 100% Blanket 0.00 0.00 0.28 0.28 0.00 0.28
579 Formation 5 WS-68/3 Subgrade- 50% Earthwork 0.00 0.00 0.01 0.01 0.00 0.01
580 Formation 5 WS-68/3 Subgrade- 100% Earthwork 0.00 0.00 0.01 0.01 0.00 0.01
581 Formation 5 WS-70/1/3 Blanket- 100% Blanket 0.00 0.00 0.01 0.01 0.00 0.01
582 Formation 5 WS-70/1/4 Blanket- 50% Blanket 0.00 0.00 0.06 0.06 0.00 0.06
583 Formation 5 WS-74/1/5 Blanket- 50% Blanket 0.00 0.00 0.04 0.04 0.00 0.04
584 Formation 5 WS-74/1/5 Blanket- 100% Blanket 0.00 0.00 0.04 0.04 0.00 0.04
585 Formation 5 WS-75/1 Embankment- 50% Earthwork 0.00 0.00 0.02 0.02 0.00 0.02
586 Formation 5 WS-75/1 Embankment- 100% Earthwork 0.00 0.00 0.02 0.02 0.00 0.02
587 Formation 5 WS-75/1 Blanket- 50% Blanket 0.00 0.00 0.02 0.02 0.00 0.02
588 Formation 5 WS-75/1 Blanket- 100% Blanket 0.00 0.00 0.02 0.02 0.00 0.02
589 Formation 5 WS-75/3 Subgrade- 50% Earthwork 0.00 0.00 0.09 0.09 0.00 0.09
590 Formation 5 WS-75/3 Subgrade- 100% Earthwork 0.00 0.00 0.09 0.09 0.00 0.09
591 Formation 5 WS-76/2 Embankment- 50% Earthwork 0.00 0.00 0.15 0.15 0.00 0.15
592 Formation 5 WS-76/5 Subgrade- 50% Earthwork 0.00 0.00 0.04 0.04 0.00 0.04
593 Formation 5 WS-76/6 Embankment- 50% Earthwork 0.00 0.00 0.15 0.15 0.00 0.15
594 Formation 5 WS-76/6 Embankment- 100% Earthwork 0.00 0.00 0.15 0.15 0.00 0.15
595 Formation 5 WS-78/1 Cutting- 50% Earthwork 0.00 0.00 0.02 0.02 0.00 0.02
596 Formation 5 WS-78/1 Cutting- 100% Earthwork 0.00 0.00 0.02 0.02 0.00 0.02
597 Formation 5 WS-78/2 Cutting- 50% Earthwork 0.00 0.00 0.03 0.03 0.00 0.03
598 Formation 5 WS-78/2 Cutting- 100% Earthwork 0.00 0.00 0.03 0.03 0.00 0.03
599 Formation 5 WS-78/3 Blanket- 50% Blanket 0.00 0.00 0.27 0.27 0.00 0.27
600 Formation 5 WS-78/3 Blanket- 100% Blanket 0.00 0.00 0.27 0.27 0.00 0.27
601 Formation 5 WS-78/5 Embankment- 50% Earthwork 0.00 0.00 0.18 0.18 0.00 0.18
602 Formation 5 WS-78/7 Embankment- 100% Earthwork 0.00 0.00 0.10 0.10 0.00 0.10
603 Formation 5 WS-78/7 Subgrade- 50% Earthwork 0.00 0.00 0.03 0.03 0.00 0.03
604 Formation 5 WS-78/7 Subgrade- 100% Earthwork 0.00 0.00 0.03 0.03 0.00 0.03
605 Formation 5 WS-80/2 Blanket- 100% Blanket 0.00 0.00 0.16 0.16 0.00 0.16
606 Formation 5 WS-80/3 Blanket- 50% Blanket 0.00 0.00 0.18 0.18 0.00 0.18
607 Formation 5 WS-81/1 Cutting- 100% Earthwork 0.00 0.00 0.01 0.01 0.00 0.01
608 Formation 5 WS-81/3 Subgrade- 50% Earthwork 0.00 0.00 0.06 0.06 0.00 0.06
609 Formation 5 WS-81/3 Subgrade- 100% Earthwork 0.00 0.00 0.06 0.06 0.00 0.06
610 Formation 5 WS-83/1 Cutting- 100% Earthwork 0.00 0.00 0.25 0.25 0.00 0.25
611 Formation 5 WS-86/3 Blanket- 50% Blanket 0.00 0.00 0.11 0.11 0.00 0.11
612 Formation 5 WS-86/3 Blanket- 100% Blanket 0.00 0.00 0.11 0.11 0.00 0.11
613 Formation 5 WS-86/4 Blanket- 50% Blanket 0.00 0.00 0.20 0.20 0.00 0.20
614 Formation 5 WS-86/4 Blanket- 100% Blanket 0.00 0.00 0.20 0.20 0.00 0.20
615 Formation 5 WS-88/2 Blanket- 50% Blanket 0.00 0.00 0.17 0.17 0.00 0.17
616 Formation 5 WS-88/2 Blanket- 100% Blanket 0.00 0.00 0.17 0.17 0.00 0.17
617 Formation 5 WS-67/1/1 Subgrade- 50% Earthwork 0.00 0.00 0.07 0.07 0.00 0.07
618 Formation 5 WS-67/1/1 Subgrade- 100% Earthwork 0.00 0.00 0.07 0.07 0.00 0.07
619 Formation 5 WS-67/1/1 Blanket- 50% Blanket 0.00 0.00 0.20 0.20 0.00 0.20
620 Formation 5 WS-67/1/1 Blanket- 100% Blanket 0.00 0.00 0.20 0.20 0.00 0.20
621 Formation 5 WS-67/1/2 Subgrade- 50% Earthwork 0.00 0.00 0.08 0.08 0.00 0.08
622 Formation 5 WS-67/1/2 Subgrade- 100% Earthwork 0.00 0.00 0.08 0.08 0.00 0.08
623 Formation 5 WS-67/2/1 Blanket- 50% Blanket 0.00 0.00 0.19 0.19 0.00 0.19
624 Formation 5 WS-67/2/1 Blanket- 100% Blanket 0.00 0.00 0.19 0.19 0.00 0.19
625 Formation 5 WS-67/2/2 Subgrade- 50% Earthwork 0.00 0.00 0.10 0.10 0.00 0.10
626 Formation 5 WS-67/2/2 Subgrade- 100% Earthwork 0.00 0.00 0.10 0.10 0.00 0.10
627 Formation 5 WS-70/1/2 Blanket- 100% Blanket 0.00 0.00 0.21 0.21 0.00 0.21
628 Formation 5 WS-70/1/4 Blanket- 50% Blanket 0.00 0.00 0.01 0.01 0.00 0.01
629 Formation 5 WS-70/1/4 Blanket- 100% Blanket 0.00 0.00 0.07 0.07 0.00 0.07
630 Formation 5 WS-75/2 Embankment- 50% Earthwork 0.00 0.00 0.08 0.08 0.00 0.08
631 Formation 5 WS-75/2 Embankment- 100% Earthwork 0.00 0.00 0.08 0.08 0.00 0.08
632 Formation 5 WS-76/1 Embankment- 50% Earthwork 0.00 0.00 0.20 0.20 0.00 0.20
633 Formation 5 WS-76/2 Embankment- 50% Earthwork 0.00 0.00 0.06 0.06 0.00 0.06
634 Formation 5 WS-76/2 Embankment- 100% Earthwork 0.00 0.00 0.21 0.21 0.00 0.21
635 Formation 5 WS-76/3 Embankment- 50% Earthwork 0.00 0.00 0.19 0.19 0.00 0.19
636 Formation 5 WS-76/4 Embankment- 50% Earthwork 0.00 0.00 0.11 0.11 0.00 0.11
637 Formation 5 WS-76/4 Embankment- 100% Earthwork 0.00 0.00 0.11 0.11 0.00 0.11
638 Formation 5 WS-76/5 Subgrade- 100% Earthwork 0.00 0.00 0.04 0.04 0.00 0.04
639 Formation 5 WS-76/6 Embankment- 50% Earthwork 0.00 0.00 0.03 0.03 0.00 0.03
640 Formation 5 WS-76/6 Embankment- 100% Earthwork 0.00 0.00 0.03 0.03 0.00 0.03
641 Formation 5 WS-76/6 Subgrade- 50% Earthwork 0.00 0.00 0.05 0.05 0.00 0.05
642 Formation 5 WS-76/6 Subgrade- 100% Earthwork 0.00 0.00 0.05 0.05 0.00 0.05
643 Formation 5 WS-77/1 Embankment- 50% Earthwork 0.00 0.00 0.22 0.22 0.00 0.22
644 Formation 5 WS-77/2 Embankment- 50% Earthwork 0.00 0.00 0.25 0.25 0.00 0.25
645 Formation 5 WS-77/3 Embankment- 50% Earthwork 0.00 0.00 0.09 0.09 0.00 0.09
646 Formation 5 WS-78/5 Embankment- 100% Earthwork 0.00 0.00 0.18 0.18 0.00 0.18
647 Formation 5 WS-78/5 Subgrade- 50% Earthwork 0.00 0.00 0.06 0.06 0.00 0.06
648 Formation 5 WS-78/5 Subgrade- 100% Earthwork 0.00 0.00 0.06 0.06 0.00 0.06
649 Formation 5 WS-78/7 Blanket- 50% Blanket 0.00 0.00 0.09 0.09 0.00 0.09
650 Formation 5 WS-78/7 Blanket- 100% Blanket 0.00 0.00 0.09 0.09 0.00 0.09
651 Formation 5 WS-80/3 Subgrade- 50% Earthwork 0.00 0.00 0.01 0.01 0.00 0.01
652 Formation 5 WS-80/3 Subgrade- 100% Earthwork 0.00 0.00 0.01 0.01 0.00 0.01
653 Formation 5 WS-80/3 Blanket- 100% Blanket 0.00 0.00 0.18 0.18 0.00 0.18
654 Formation 5 WS-81/2 Embankment- 50% Earthwork 0.00 0.00 0.06 0.06 0.00 0.06
655 Formation 5 WS-81/2 Embankment- 100% Earthwork 0.00 0.00 0.20 0.20 0.00 0.20
656 Formation 5 WS-81/2 Subgrade- 50% Earthwork 0.00 0.00 0.07 0.07 0.00 0.07
657 Formation 5 WS-81/2 Subgrade- 100% Earthwork 0.00 0.00 0.07 0.07 0.00 0.07
658 Formation 5 WS-81/2 Blanket- 50% Blanket 0.00 0.00 0.18 0.18 0.00 0.18
659 Formation 5 WS-81/2 Blanket- 100% Blanket 0.00 0.00 0.18 0.18 0.00 0.18
660 Formation 5 WS-81/3 Blanket- 50% Blanket 0.00 0.00 0.19 0.19 0.00 0.19
661 Formation 5 WS-81/3 Blanket- 100% Blanket 0.00 0.00 0.19 0.19 0.00 0.19
662 Formation 5 WS-81/4 Blanket- 50% Blanket 0.00 0.00 0.12 0.12 0.00 0.12
663 Formation 5 WS-81/4 Blanket- 100% Blanket 0.00 0.00 0.12 0.12 0.00 0.12
664 Formation 5 WS-81/5 Blanket- 50% Blanket 0.00 0.00 0.10 0.10 0.00 0.10
665 Formation 5 WS-81/5 Blanket- 100% Blanket 0.00 0.00 0.10 0.10 0.00 0.10
666 Formation 5 WS-82/2 Blanket- 50% Blanket 0.00 0.00 0.19 0.19 0.00 0.19
667 Formation 5 WS-82/2 Blanket- 100% Blanket 0.00 0.00 0.19 0.19 0.00 0.19
668 Formation 5 WS-82/3 Blanket- 50% Blanket 0.00 0.00 0.25 0.25 0.00 0.25
669 Formation 5 WS-82/3 Blanket- 100% Blanket 0.00 0.00 0.25 0.25 0.00 0.25
670 Formation 5 WS-82/4 Cutting- 50% Earthwork 0.00 0.00 0.04 0.04 0.00 0.04
671 Formation 5 WS-82/4 Cutting- 100% Earthwork 0.00 0.00 0.04 0.04 0.00 0.04
672 Formation 5 WS-83/1 Cutting- 50% Earthwork 0.00 0.00 0.25 0.25 0.00 0.25
673 Formation 5 WS-83/1 Blanket- 50% Blanket 0.00 0.00 0.25 0.25 0.00 0.25
674 Formation 5 WS-83/1 Blanket- 100% Blanket 0.00 0.00 0.25 0.25 0.00 0.25
675 Formation 5 WS-83/2 Embankment- 50% Earthwork 0.00 0.00 0.05 0.05 0.00 0.05
676 Formation 5 WS-83/2 Embankment- 100% Earthwork 0.00 0.00 0.05 0.05 0.00 0.05
677 Formation 5 WS-83/2 Subgrade- 50% Earthwork 0.00 0.00 0.05 0.05 0.00 0.05
678 Formation 5 WS-83/2 Subgrade- 100% Earthwork 0.00 0.00 0.05 0.05 0.00 0.05
679 Formation 5 WS-87/1 Blanket- 50% Blanket 0.00 0.00 0.17 0.17 0.00 0.17
680 Formation 5 WS-87/1 Blanket- 100% Blanket 0.00 0.00 0.17 0.17 0.00 0.17
681 Formation 5 WS-87/3 Cutting- 50% Earthwork 0.00 0.00 0.13 0.13 0.00 0.13
682 Formation 5 WS-87/3 Cutting- 100% Earthwork 0.00 0.00 0.13 0.13 0.00 0.13
683 Formation 5 WS-87/5 Blanket- 50% Blanket 0.00 0.00 0.10 0.10 0.00 0.10
684 Formation 5 WS-87/5 Blanket- 100% Blanket 0.00 0.00 0.10 0.10 0.00 0.10
685 Formation 5 WS-67/1/2 Subgrade- 50% Earthwork 0.00 0.00 0.00 0.04 0.04 0.04
686 Formation 5 WS-67/1/2 Subgrade- 100% Earthwork 0.00 0.00 0.00 0.04 0.04 0.04
687 Formation 5 WS-67/1/2 Blanket- 50% Blanket 0.00 0.00 0.00 0.33 0.33 0.33
688 Formation 5 WS-67/1/2 Blanket- 100% Blanket 0.00 0.00 0.00 0.33 0.33 0.33
689 Formation 5 WS-75/2 Subgrade- 50% Earthwork 0.00 0.00 0.00 0.12 0.12 0.12
690 Formation 5 WS-75/2 Subgrade- 100% Earthwork 0.00 0.00 0.00 0.12 0.12 0.12
691 Formation 5 WS-76/1 Embankment- 50% Earthwork 0.00 0.00 0.00 0.04 0.04 0.04
692 Formation 5 WS-76/1 Embankment- 100% Earthwork 0.00 0.00 0.00 0.24 0.24 0.24
693 Formation 5 WS-76/2 Subgrade- 50% Earthwork 0.00 0.00 0.00 0.07 0.07 0.07
694 Formation 5 WS-76/2 Subgrade- 100% Earthwork 0.00 0.00 0.00 0.07 0.07 0.07
695 Formation 5 WS-76/2 Blanket- 50% Blanket 0.00 0.00 0.00 0.19 0.19 0.19
696 Formation 5 WS-76/2 Blanket- 100% Blanket 0.00 0.00 0.00 0.19 0.19 0.19
697 Formation 5 WS-76/3 Embankment- 100% Earthwork 0.00 0.00 0.00 0.19 0.19 0.19
698 Formation 5 WS-76/4 Subgrade- 50% Earthwork 0.00 0.00 0.00 0.03 0.03 0.03
699 Formation 5 WS-76/6 Subgrade- 50% Earthwork 0.00 0.00 0.00 0.01 0.01 0.01
700 Formation 5 WS-76/6 Subgrade- 100% Earthwork 0.00 0.00 0.00 0.01 0.01 0.01
701 Formation 5 WS-77/1 Embankment- 100% Earthwork 0.00 0.00 0.00 0.22 0.22 0.22
702 Formation 5 WS-77/2 Embankment- 100% Earthwork 0.00 0.00 0.00 0.25 0.25 0.25
703 Formation 5 WS-77/3 Embankment- 100% Earthwork 0.00 0.00 0.00 0.09 0.09 0.09
704 Formation 5 WS-80/1 Embankment- 50% Earthwork 0.00 0.00 0.00 0.17 0.17 0.17
705 Formation 5 WS-81/1 Embankment- 50% Earthwork 0.00 0.00 0.00 0.17 0.17 0.17
706 Formation 5 WS-81/4 Embankment- 50% Earthwork 0.00 0.00 0.00 0.13 0.13 0.13
707 Formation 5 WS-81/4 Embankment- 100% Earthwork 0.00 0.00 0.00 0.13 0.13 0.13
708 Formation 5 WS-82/1 Embankment- 50% Earthwork 0.00 0.00 0.00 0.09 0.09 0.09
709 Formation 5 WS-82/1 Embankment- 100% Earthwork 0.00 0.00 0.00 0.20 0.20 0.20
710 Formation 5 WS-82/2 Embankment- 50% Earthwork 0.00 0.00 0.00 0.01 0.01 0.01
711 Formation 5 WS-83/2 Blanket- 50% Blanket 0.00 0.00 0.00 0.22 0.22 0.22
712 Formation 5 WS-83/2 Blanket- 100% Blanket 0.00 0.00 0.00 0.22 0.22 0.22
713 Formation 5 WS-86/1 Embankment- 50% Earthwork 0.00 0.00 0.00 0.19 0.19 0.19
714 Formation 5 WS-87/4 Blanket- 50% Blanket 0.00 0.00 0.00 0.28 0.28 0.28
715 Formation 5 WS-87/4 Blanket- 100% Blanket 0.00 0.00 0.00 0.28 0.28 0.28
716 Formation 5 WS-75/3 Blanket- 50% Blanket 0.00 0.00 0.00 0.25 0.25 0.25
717 Formation 5 WS-75/3 Blanket- 100% Blanket 0.00 0.00 0.00 0.25 0.25 0.25
718 Formation 5 WS-76/1 Subgrade- 50% Earthwork 0.00 0.00 0.00 0.08 0.08 0.08
719 Formation 5 WS-76/1 Subgrade- 100% Earthwork 0.00 0.00 0.00 0.08 0.08 0.08
720 Formation 5 WS-76/1 Blanket- 50% Blanket 0.00 0.00 0.00 0.21 0.21 0.21
721 Formation 5 WS-76/1 Blanket- 100% Blanket 0.00 0.00 0.00 0.21 0.21 0.21
722 Formation 5 WS-76/3 Embankment- 50% Earthwork 0.00 0.00 0.00 0.03 0.03 0.03
723 Formation 5 WS-76/3 Embankment- 100% Earthwork 0.00 0.00 0.00 0.03 0.03 0.03
724 Formation 5 WS-76/3 Subgrade- 50% Earthwork 0.00 0.00 0.00 0.07 0.07 0.07
725 Formation 5 WS-76/3 Subgrade- 100% Earthwork 0.00 0.00 0.00 0.07 0.07 0.07
726 Formation 5 WS-76/3 Blanket- 50% Blanket 0.00 0.00 0.00 0.19 0.19 0.19
727 Formation 5 WS-76/3 Blanket- 100% Blanket 0.00 0.00 0.00 0.19 0.19 0.19
728 Formation 5 WS-76/4 Subgrade- 100% Earthwork 0.00 0.00 0.00 0.03 0.03 0.03
729 Formation 5 WS-76/4 Blanket- 50% Blanket 0.00 0.00 0.00 0.09 0.09 0.09
730 Formation 5 WS-76/4 Blanket- 100% Blanket 0.00 0.00 0.00 0.09 0.09 0.09
731 Formation 5 WS-76/5 Blanket- 50% Blanket 0.00 0.00 0.00 0.12 0.12 0.12
732 Formation 5 WS-76/5 Blanket- 100% Blanket 0.00 0.00 0.00 0.12 0.12 0.12
733 Formation 5 WS-76/6 Blanket- 50% Blanket 0.00 0.00 0.00 0.02 0.02 0.02
734 Formation 5 WS-76/6 Blanket- 100% Blanket 0.00 0.00 0.00 0.02 0.02 0.02
735 Formation 5 WS-77/1 Subgrade- 50% Earthwork 0.00 0.00 0.00 0.07 0.07 0.07
736 Formation 5 WS-77/1 Subgrade- 100% Earthwork 0.00 0.00 0.00 0.07 0.07 0.07
737 Formation 5 WS-77/1 Blanket- 50% Blanket 0.00 0.00 0.00 0.19 0.19 0.19
738 Formation 5 WS-77/1 Blanket- 100% Blanket 0.00 0.00 0.00 0.19 0.19 0.19
739 Formation 5 WS-77/2 Subgrade- 50% Earthwork 0.00 0.00 0.00 0.08 0.08 0.08
740 Formation 5 WS-77/2 Subgrade- 100% Earthwork 0.00 0.00 0.00 0.08 0.08 0.08
741 Formation 5 WS-78/5 Blanket- 50% Blanket 0.00 0.00 0.00 0.15 0.15 0.15
742 Formation 5 WS-78/5 Blanket- 100% Blanket 0.00 0.00 0.00 0.15 0.15 0.15
743 Formation 5 WS-80/1 Embankment- 100% Earthwork 0.00 0.00 0.00 0.17 0.17 0.17
744 Formation 5 WS-80/1 Subgrade- 50% Earthwork 0.00 0.00 0.00 0.05 0.05 0.05
745 Formation 5 WS-80/1 Subgrade- 100% Earthwork 0.00 0.00 0.00 0.05 0.05 0.05
746 Formation 5 WS-81/1 Embankment- 100% Earthwork 0.00 0.00 0.00 0.17 0.17 0.17
747 Formation 5 WS-81/4 Subgrade- 50% Earthwork 0.00 0.00 0.00 0.05 0.05 0.05
748 Formation 5 WS-81/4 Subgrade- 100% Earthwork 0.00 0.00 0.00 0.05 0.05 0.05
749 Formation 5 WS-82/1 Subgrade- 50% Earthwork 0.00 0.00 0.00 0.08 0.08 0.08
750 Formation 5 WS-82/1 Subgrade- 100% Earthwork 0.00 0.00 0.00 0.08 0.08 0.08
751 Formation 5 WS-87/4 Embankment- 50% Earthwork 0.00 0.00 0.00 0.32 0.32 0.32
752 Formation 5 WS-87/4 Embankment- 100% Earthwork 0.00 0.00 0.00 0.32 0.32 0.32
753 Formation 5 WS-75/2 Blanket- 50% Blanket 0.00 0.00 0.00 0.33 0.33 0.33
754 Formation 5 WS-75/2 Blanket- 100% Blanket 0.00 0.00 0.00 0.33 0.33 0.33
755 Formation 5 WS-75/4 Embankment- 100% Earthwork 0.00 0.00 0.00 0.25 0.25 0.25
756 Formation 5 WS-75/5 Embankment- 50% Earthwork 0.00 0.00 0.00 0.22 0.22 0.22
757 Formation 5 WS-75/5 Embankment- 100% Earthwork 0.00 0.00 0.00 0.22 0.22 0.22
758 Formation 5 WS-75/5 Subgrade- 50% Earthwork 0.00 0.00 0.00 0.10 0.10 0.10
759 Formation 5 WS-75/5 Subgrade- 100% Earthwork 0.00 0.00 0.00 0.10 0.10 0.10
760 Formation 5 WS-77/2 Blanket- 50% Blanket 0.00 0.00 0.00 0.22 0.22 0.22
761 Formation 5 WS-77/2 Blanket- 100% Blanket 0.00 0.00 0.00 0.22 0.22 0.22
762 Formation 5 WS-77/3 Subgrade- 50% Earthwork 0.00 0.00 0.00 0.03 0.03 0.03
763 Formation 5 WS-77/3 Subgrade- 100% Earthwork 0.00 0.00 0.00 0.03 0.03 0.03
764 Formation 5 WS-77/3 Blanket- 50% Blanket 0.00 0.00 0.00 0.08 0.08 0.08
765 Formation 5 WS-77/3 Blanket- 100% Blanket 0.00 0.00 0.00 0.08 0.08 0.08
766 Formation 5 WS-80/1 Blanket- 50% Blanket 0.00 0.00 0.00 0.15 0.15 0.15
767 Formation 5 WS-80/1 Blanket- 100% Blanket 0.00 0.00 0.00 0.15 0.15 0.15
768 Formation 5 WS-81/3 Embankment- 50% Earthwork 0.00 0.00 0.00 0.21 0.21 0.21
769 Formation 5 WS-81/5 Embankment- 50% Earthwork 0.00 0.00 0.00 0.11 0.11 0.11
770 Formation 5 WS-81/5 Embankment- 100% Earthwork 0.00 0.00 0.00 0.11 0.11 0.11
771 Formation 5 WS-82/1 Blanket- 50% Blanket 0.00 0.00 0.00 0.23 0.23 0.23
772 Formation 5 WS-82/1 Blanket- 100% Blanket 0.00 0.00 0.00 0.23 0.23 0.23
773 Formation 5 WS-82/4 Embankment- 50% Earthwork 0.00 0.00 0.00 0.03 0.03 0.03
774 Formation 5 WS-86/2 Embankment- 50% Earthwork 0.00 0.00 0.00 0.16 0.16 0.16
775 Formation 5 WS-87/4 Subgrade- 50% Earthwork 0.00 0.00 0.00 0.11 0.11 0.11
776 Formation 5 WS-87/4 Subgrade- 100% Earthwork 0.00 0.00 0.00 0.11 0.11 0.11
777 Formation 5 WS-70/2/1 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.20 0.20 0.00 0.20
778 Formation 5 WS-79/1 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.37 0.37 0.00 0.37
779 Formation 5 WS-70/2/6 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.20 0.20 0.00 0.20
780 Formation 5 WS-71/4 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.34 0.34 0.00 0.34
781 Formation 5 WS-73/7 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.43 0.43 0.00 0.43
782 Formation 5 WS-79/2 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.44 0.44 0.00 0.44
783 Formation 5 WS-79/3 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.74 0.74 0.00 0.74
784 Formation 5 WS-66/2/1 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.53 0.53 0.00 0.53
785 Formation 5 WS-70/1/3 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.21 0.21 0.00 0.21
786 Formation 5 WS-70/2/4 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.49 0.49 0.00 0.49
787 Formation 5 WS-71/5 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.40 0.40 0.00 0.40
788 Formation 5 WS-79/4 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.10 0.10 0.00 0.10
789 Formation 5 WS-68/1 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.18 0.18 0.18
790 Formation 5 WS-68/2 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.63 0.63 0.63
791 Formation 5 WS-68/4 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.31 0.31 0.31
792 Formation 5 WS-71/3 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.49 0.49 0.49
793 Formation 5 WS-71/6 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.43 0.43 0.43
794 Formation 5 WS-71/7 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.62 0.62 0.62
795 Formation 5 WS-73/1 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.45 0.45 0.45
796 Formation 5 WS-73/2 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.48 0.48 0.48
797 Formation 5 WS-78/3 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.43 0.43 0.43
798 Formation 5 WS-78/4 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.43 0.43 0.43
799 Formation 5 WS-66/2/2 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.41 0.41 0.41
800 Formation 5 WS-70/1/2 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.43 0.43 0.43
801 Formation 5 WS-70/1/4 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.15 0.15 0.15
802 Formation 5 WS-70/2/5 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.37 0.37 0.37
803 Formation 5 WS-71/1 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.57 0.57 0.57
804 Formation 5 WS-78/1 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.60 0.60 0.60
805 Formation 5 WS-78/2 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.55 0.55 0.55
806 Formation 5 WS-68/3 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.39 0.39 0.39
807 Formation 5 WS-70/1/1 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.42 0.42 0.42
808 Formation 5 WS-71/2 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.62 0.62 0.62
809 Formation 5 WS-71/8 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.39 0.39 0.39
810 Formation 5 WS-78/5 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.20 0.20 0.20
811 Formation 5 WS-78/6 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.20 0.20 0.20
812 Formation 5 WS-78/7 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.06 0.06 0.06
813 Structure 5 Saradhana Building Building 0.00 0.00 0.00 0.56 0.00 0.56 0.79 0.34 1.11 2.24 2.80
814 Structure 5 Bangurgram Building Building Building 0.00 0.00 0.19 0.33 0.68 1.19 0.61 0.71 0.77 2.09 3.28
815 Structure 6 606 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
816 Structure 6 605 2% Completion MIB 0.03 0.03 0.00 0.00 0.00 0.03
817 Structure 6 600 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
818 Structure 6 598 2% Completion MIB 0.02 0.02 0.00 0.00 0.00 0.02
819 Structure 6 Bhinwaliya 2% Completion PS 0.01 0.01 0.00 0.00 0.00 0.01
820 Structure 6 Banta Raghunath 2% Completion PS 0.01 0.01 0.00 0.00 0.00 0.01
821 Structure 6 Auwa 2% Completion PS 0.01 0.01 0.00 0.00 0.00 0.01
822 Structure 6 566 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
823 Structure 6 568 2% Completion MIB 0.02 0.02 0.00 0.00 0.00 0.02
824 Structure 6 570 2% Completion MIB 0.02 0.02 0.00 0.00 0.00 0.02
825 Structure 6 Bhesana Completion PS 0.27 0.27 0.00 0.00 0.00 0.27
826 Structure 6 Marwar Station Building and Residential Quarters Building 0.33 0.33 0.00 0.00 0.00 0.33
827 Structure 6 Chandawal Station Building and Residential Quarters Building 0.17 0.17 0.00 0.00 0.00 0.17
828 Structure 6 Marwar 2% Completion PS 0.01 0.01 0.00 0.00 0.00 0.01
829 Structure 6 Marwar-2 2% Completion PS 0.01 0.01 0.00 0.00 0.00 0.01
524 Completion MIB 0.79 0.79 0.00 0.00 0.00
830 Structure 6 0.79
831 Structure 6 LC46 Completion RUB 0.89 0.89 0.00 0.00 0.00 0.89
832 Structure 6 Bagri Sajjanpur Completion PS 0.24 0.24 0.00 0.00 0.00 0.24
833 Structure 6 564 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
834 Structure 6 461 Foundation IMB/MJB 0.54 0.54 1.08 0.00 0.00 0.00 1.08
835 Structure 6 604 2% Completion IMB/MJB 0.18 0.18 0.00 0.00 0.00 0.18
836 Structure 6 603 2% Completion IMB/MJB 0.06 0.06 0.00 0.00 0.00 0.06
837 Structure 6 602 2% Completion IMB/MJB 0.07 0.07 0.00 0.00 0.00 0.07
838 Structure 6 599 2% Completion IMB/MJB 0.19 0.19 0.00 0.00 0.00 0.19
839 Structure 6 597 2% Completion IMB/MJB 0.26 0.26 0.00 0.00 0.00 0.26
840 Structure 6 596 2% Completion IMB/MJB 0.10 0.10 0.00 0.00 0.00 0.10
841 Structure 6 527 Superstructure IMB/MJB 4.03 4.03 0.00 0.00 0.00 4.03
842 Structure 6 Sojat Road Completion FOB 0.61 0.61 0.00 0.00 0.00 0.61
843 Formation 6 WS-93 Cutting- 50% Earthwork 0.02 0.02 0.00 0.00 0.00 0.02
844 Formation 6 WS-92 Cutting- 50% Earthwork 0.04 0.04 0.00 0.00 0.00 0.04
845 Formation 6 WS-93 Cutting- 100% Earthwork 0.02 0.02 0.00 0.00 0.00 0.02
846 Formation 6 WS-92 Cutting- 100% Earthwork 0.04 0.04 0.00 0.00 0.00 0.04
847 Formation 6 WS-98 Cutting- 100% Earthwork 0.05 0.05 0.00 0.00 0.00 0.05
848 Formation 6 WS-98 Cutting- 100% Earthwork 0.05 0.05 0.00 0.00 0.00 0.05
849 Formation 6 WS-93 Subgrade- 50% Earthwork 0.23 0.23 0.00 0.00 0.00 0.23
850 Formation 6 WS-92 Subgrade- 50% Earthwork 0.23 0.23 0.00 0.00 0.00 0.23
851 Formation 6 WS-93 Subgrade- 100% Earthwork 0.23 0.23 0.00 0.00 0.00 0.23
852 Formation 6 WS-92 Subgrade- 100% Earthwork 0.23 0.23 0.00 0.00 0.00 0.23
853 Formation 6 WS-98 Subgrade- 50% Earthwork 0.09 0.09 0.00 0.00 0.00 0.09
854 Formation 6 WS-94 Subgrade- 50% Earthwork 0.03 0.03 0.00 0.00 0.00 0.03
855 Formation 6 WS-93 Subgrade- 50% Earthwork 0.08 0.08 0.00 0.00 0.00 0.08
856 Formation 6 WS-92 Subgrade- 50% Earthwork 0.19 0.19 0.00 0.00 0.00 0.19
857 Formation 6 WS-98 Subgrade- 100% Earthwork 0.09 0.09 0.00 0.00 0.00 0.09
858 Formation 6 WS-94 Subgrade- 100% Earthwork 0.03 0.03 0.00 0.00 0.00 0.03
859 Formation 6 WS-93 Subgrade- 100% Earthwork 0.08 0.08 0.00 0.00 0.00 0.08
860 Formation 6 WS-92 Subgrade- 100% Earthwork 0.19 0.19 0.00 0.00 0.00 0.19
861 Formation 6 WS-98 Blanket- 50% Blanket 0.18 0.18 0.00 0.00 0.00 0.18
862 Formation 6 WS-95 Blanket- 50% Blanket 0.05 0.05 0.00 0.00 0.00 0.05
863 Formation 6 WS-94 Blanket- 50% Blanket 0.17 0.17 0.00 0.00 0.00 0.17
864 Formation 6 WS-93 Blanket- 50% Blanket 0.20 0.20 0.00 0.00 0.00 0.20
865 Formation 6 WS-92 Blanket- 50% Blanket 0.55 0.55 0.00 0.00 0.00 0.55
866 Formation 6 WS-98 Blanket- 100% Blanket 0.18 0.18 0.00 0.00 0.00 0.18
867 Formation 6 WS-95 Blanket- 100% Blanket 0.05 0.05 0.00 0.00 0.00 0.05
868 Formation 6 WS-94 Blanket- 100% Blanket 0.17 0.17 0.00 0.00 0.00 0.17
869 Formation 6 WS-93 Blanket- 100% Blanket 0.20 0.20 0.00 0.00 0.00 0.20
870 Formation 6 WS-92 Blanket- 100% Blanket 0.55 0.55 0.00 0.00 0.00 0.55
871 Structure 6 455 Superstructure IMB/MJB 1.97 1.97 0.00 0.00 0.00 1.97
872 Structure 6 472 Foundation IMB/MJB 0.54 0.54 1.08 0.00 0.00 0.00 1.08
873 Structure 6 509 Substructure IMB/MJB 8.32 8.32 0.00 0.00 0.00 8.32
874 Structure 6 512 Superstructure IMB/MJB 0.98 0.98 0.00 0.00 0.00 0.98
875 Structure 6 429A Completion MIB 0.02 0.02 0.00 0.00 0.00
0.02
876 Structure 6 573 2% Completion IMB/MJB 0.13 0.13 0.00 0.00 0.00 0.13
877 Structure 6 580 2% Completion IMB/MJB 0.15 0.15 0.00 0.00 0.00 0.15
878 Structure 6 581 2% Completion IMB/MJB 0.09 0.09 0.00 0.00 0.00 0.09
879 Structure 6 582 2% Completion IMB/MJB 0.06 0.06 0.00 0.00 0.00 0.06
880 Structure 6 583 2% Completion IMB/MJB 0.07 0.07 0.00 0.00 0.00 0.07
881 Structure 6 584 2% Completion IMB/MJB 0.17 0.17 0.00 0.00 0.00 0.17
882 Structure 6 585 2% Completion IMB/MJB 0.16 0.16 0.00 0.00 0.00 0.16
883 Structure 6 587 2% Completion IMB/MJB 0.14 0.14 0.00 0.00 0.00 0.14
884 Structure 6 589 2% Completion IMB/MJB 0.14 0.14 0.00 0.00 0.00 0.14
885 Structure 6 592 2% Completion IMB/MJB 0.07 0.07 0.00 0.00 0.00 0.07
886 Structure 6 593 2% Completion IMB/MJB 0.10 0.10 0.00 0.00 0.00 0.10
887 Structure 6 594 2% Completion IMB/MJB 0.56 0.56 0.00 0.00 0.00 0.56
888 Structure 6 550 2% Completion MIB 0.02 0.02 0.00 0.00 0.00 0.02
889 Structure 6 551 2% Completion MIB 0.04 0.04 0.00 0.00 0.00 0.04
890 Structure 6 552 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
891 Structure 6 553 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
892 Structure 6 557 2% Completion MIB 0.02 0.02 0.00 0.00 0.00 0.02
893 Structure 6 558 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
894 Structure 6 559 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
895 Structure 6 561 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
896 Structure 6 562 2% Completion MIB 0.02 0.02 0.00 0.00 0.00 0.02
897 Structure 6 571 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
898 Structure 6 572 2% Completion MIB 0.02 0.02 0.00 0.00 0.00 0.02
899 Structure 6 574 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
900 Structure 6 575 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
901 Structure 6 576 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
902 Structure 6 577 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
903 Structure 6 578 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
904 Structure 6 579 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
905 Structure 6 586 2% Completion MIB 0.02 0.02 0.00 0.00 0.00 0.02
906 Structure 6 590 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
907 Structure 6 591 2% Completion MIB 0.02 0.02 0.00 0.00 0.00 0.02
908 Structure 6 595 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
909 Structure 6 Chandawal Completion PS 0.29 0.29 0.00 0.00 0.00 0.29
910 Structure 6 Bagri Nagar Completion PS 0.67 0.67 0.00 0.00 0.00 0.67
911 Structure 6 Bhesana Completion PS 0.01 0.01 0.00 0.00 0.00 0.01
912 Structure 6 Dhareswar Completion PS 0.01 0.01 0.00 0.00 0.00 0.01
913 Structure 6 LC41 Completion RUB 0.49 0.49 0.00 0.00 0.00 0.49
914 Structure 6 LC42 Completion RUB 0.29 0.29 0.00 0.00 0.00 0.29
915 Structure 6 LC47 2% Completion RUB 0.02 0.02 0.00 0.00 0.00 0.02
916 Structure 6 LC49 2% Completion RUB 0.01 0.01 0.00 0.00 0.00 0.01
917 Structure 6 LC50 2% Completion RUB 0.03 0.03 0.00 0.00 0.00 0.03
918 Structure 6 LC51 2% Completion RUB 0.03 0.03 0.00 0.00 0.00 0.03
919 Structure 6 LC52 Completion RUB 0.03 0.03 0.00 0.00 0.00 0.03
920 Structure 6 LC54 2% Completion RUB 0.02 0.02 0.00 0.00 0.00 0.02
921 Structure 6 LC55 2% Completion RUB 0.02 0.02 0.00 0.00 0.00 0.02
922 Structure 6 LC56 2% Completion RUB 0.01 0.01 0.00 0.00 0.00 0.01
923 Structure 6 LC60 2% Completion RUB 0.01 0.01 0.00 0.00 0.00 0.01
924 Structure 6 LC61 2% Completion RUB 0.03 0.03 0.00 0.00 0.00 0.03
925 Structure 6 LC62 2% Completion RUB 0.01 0.01 0.00 0.00 0.00 0.01
926 Structure 6 BAGRI SAJJANPUR Completion FOB 0.61 0.61 0.00 0.00 0.00 0.61
927 Structure 6 BAGRINAGAR Completion FOB 0.61 0.61 0.00 0.00 0.00 0.61
928 Structure 6 Marwar Station Building and Residential Quarters Building 0.39 0.39 0.00 0.00 0.00 0.39
929 Structure 6 Chandawal Station Building and Residential Quarters Building 0.36 0.36 0.00 0.00 0.00 0.36
930 Structure 6 490 Substructure IMB/MJB 1.05 1.05 0.00 0.00 0.00 1.05
931 Structure 6 499 Completion MIB 0.20 0.20 0.00 0.00 0.00 0.20
932 Structure 6 LC38 Completion RUB 2.82 2.82 0.00 0.00 0.00 2.82
933 Structure 6 FOB-Haripur Completion FOB 0.61 0.61 0.00 0.00 0.00 0.61
934 Structure 6 527 2% Completion IMB/MJB 0.21 0.21 0.00 0.00 0.00 0.21
935 Structure 6 536 2% Completion IMB/MJB 0.05 0.05 0.00 0.00 0.00 0.05
936 Structure 6 538 2% Completion IMB/MJB 0.06 0.06 0.00 0.00 0.00 0.06
937 Structure 6 540 2% Completion IMB/MJB 0.07 0.07 0.00 0.00 0.00 0.07
938 Structure 6 544 2% Completion IMB/MJB 0.07 0.07 0.00 0.00 0.00 0.07
939 Structure 6 545 2% Completion IMB/MJB 0.08 0.08 0.00 0.00 0.00 0.08
940 Structure 6 554 2% Completion IMB/MJB 0.07 0.07 0.00 0.00 0.00 0.07
941 Structure 6 555 2% Completion IMB/MJB 0.21 0.21 0.00 0.00 0.00 0.21
942 Structure 6 556 2% Completion IMB/MJB 0.06 0.06 0.00 0.00 0.00 0.06
943 Structure 6 563 2% Completion IMB/MJB 0.77 0.77 0.00 0.00 0.00 0.77
944 Structure 6 567 2% Completion IMB/MJB 0.06 0.06 0.00 0.00 0.00 0.06
945 Structure 6 569 2% Completion IMB/MJB 0.16 0.16 0.00 0.00 0.00 0.16
946 Structure 6 520 2% Completion MIB 0.05 0.05 0.00 0.00 0.00 0.05
947 Structure 6 521 2% Completion MIB 0.02 0.02 0.00 0.00 0.00 0.02
948 Structure 6 522 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
949 Structure 6 523 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
950 Structure 6 524 2% Completion MIB 0.02 0.02 0.00 0.00 0.00 0.02
951 Structure 6 525 2% Completion MIB 0.02 0.02 0.00 0.00 0.00 0.02
952 Structure 6 526 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
953 Structure 6 530 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
954 Structure 6 531 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
955 Structure 6 532 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
956 Structure 6 533 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
957 Structure 6 534 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
958 Structure 6 535 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
959 Structure 6 537 2% Completion MIB 0.02 0.02 0.00 0.00 0.00 0.02
960 Structure 6 539 2% Completion MIB 0.02 0.02 0.00 0.00 0.00 0.02
961 Structure 6 541 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
962 Structure 6 542 2% Completion MIB 0.02 0.02 0.00 0.00 0.00 0.02
963 Structure 6 543 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
964 Structure 6 548 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
965 Structure 6 549 2% Completion MIB 0.01 0.01 0.00 0.00 0.00 0.01
966 Structure 6 Chandawal 2% Completion PS 0.01 0.01 0.00 0.00 0.00 0.01
967 Structure 6 Bagri Sajjanpur 2% Completion PS 0.01 0.01 0.00 0.00 0.00 0.01
968 Structure 6 Sojat Completion PS 0.49 0.49 0.00 0.00 0.00 0.49
969 Structure 6 Sojat-2 Completion PS 0.67 0.67 0.00 0.00 0.00 0.67
970 Structure 6 LC40 Completion RUB 0.43 0.43 0.00 0.00 0.00 0.43
971 Structure 6 LC41 2% Completion RUB 0.01 0.01 0.00 0.00 0.00 0.01
972 Structure 6 LC42 2% Completion RUB 0.01 0.01 0.00 0.00 0.00 0.01
973 Structure 6 LC43 2% Completion RUB 0.01 0.01 0.00 0.00 0.00 0.01
974 Structure 6 LC44 2% Completion RUB 0.01 0.01 0.00 0.00 0.00 0.01
975 Structure 6 LC45 2% Completion RUB 0.01 0.01 0.00 0.00 0.00 0.01
976 Structure 6 LC46 2% Completion RUB 0.03 0.03 0.00 0.00 0.00 0.03
977 Structure 6 LC57 Completion RUB 1.42 1.42 0.00 0.00 0.00 1.42
978 Structure 6 FOB-GURIYA Completion FOB 0.61 0.61 0.00 0.00 0.00 0.61
979 Structure 6 Marwar Building Building 1.17 1.17 0.00 0.00 0.00 1.17
980 Structure 6 Chandawal Building Building 0.19 0.19 0.00 0.00 0.00 0.19
981 Structure 6 431A Superstructure IMB/MJB 0.00 9.80 9.80 0.00 0.00 9.80
982 Structure 6 434 Substructure IMB/MJB 0.00 0.47 0.47 0.00 0.00 0.47
983 Structure 6 490 Superstructure IMB/MJB 0.00 2.00 2.00 0.00 0.00 2.00
984 Structure 6 509 Superstructure IMB/MJB 0.00 11.31 11.31 0.00 0.00 11.31
985 Structure 6 459 Completion MIB 0.00 0.08 0.08 0.00 0.00 0.08
986 Structure 6 487 Completion MIB 0.00 12.14 12.14 0.00 0.00 12.14
987 Structure 6 LC39 Completion RUB 0.00 1.26 1.26 0.00 0.00 1.26
988 Structure 6 PS-Haripur Completion PS 0.00 0.44 0.44 0.00 0.00 0.44
989 Structure 6 Guriya Completion PS 0.00 0.69 0.69 0.00 0.00 0.69
990 Structure 6 Bagri Nagar 2% Completion PS 0.00 0.01 0.01 0.00 0.00 0.01
991 Structure 6 Sojat 2% Completion PS 0.00 0.01 0.01 0.00 0.00 0.01
992 Structure 6 Sojat-2 2% Completion PS 0.00 0.01 0.01 0.00 0.00 0.01
993 Structure 6 LC58 Completion RUB 0.00 1.22 1.22 0.00 0.00 1.22
994 Structure 6 LC65 Completion RUB 0.00 1.01 1.01 0.00 0.00 1.01
995 Structure 6 Marwar Building Building 0.00 0.85 0.85 0.00 0.00 0.85
996 Structure 6 Chandawal Building Building 0.00 0.49 0.49 0.00 0.00 0.49
997 Structure 6 ROB Sendra Substructure IMB/MJB 0.00 8.89 8.89 0.00 0.00 8.89
998 Structure 6 ROB Sendra Superstructure IMB/MJB 0.00 16.89 16.89 0.00 0.00 16.89
999 Structure 6 469 Completion MIB 0.00 0.03 0.03 0.00 0.00 0.03
1000 Structure 6 488 Completion MIB 0.00 8.22 8.22 0.00 0.00 8.22
1001 Structure 6 430 Completion MIB 0.00 0.16 0.16 0.00 0.00 0.16
1002 Structure 6 433 Completion MIB 0.00 0.96 0.96 0.00 0.00 0.96
1003 Structure 6 461A Completion MIB 0.00 0.10 0.10 0.00 0.00 0.10
1004 Structure 6 470 Completion MIB 0.00 0.05 0.05 0.00 0.00 0.05
1005 Structure 6 494 Completion MIB 0.00 0.32 0.32 0.00 0.00 0.32
1006 Structure 6 497 Completion MIB 0.00 0.38 0.38 0.00 0.00 0.38
1007 Structure 6 LC28 Completion RUB 0.00 1.19 1.19 0.00 0.00 1.19
1008 Structure 6 LC36 Completion RUB 0.00 1.47 1.47 0.00 0.00 1.47
1009 Structure 6 LC23 Completion RUB 0.00 3.22 3.22 0.00 0.00 3.22
1010 Structure 6 Bangurgram Completion PS 0.00 0.04 0.04 0.00 0.00 0.04
1011 Structure 6 Barr Completion PS 0.00 0.41 0.41 0.00 0.00 0.41
1012 Formation 6 WS-106/1 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.72 0.72 0.00 0.00 0.72
1013 Formation 6 WS-106/2 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.60 0.60 0.00 0.00 0.60
1014 Formation 6 WS-106/3 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.75 0.75 0.00 0.00 0.75
1015 Formation 6 WS-106/4 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.82 0.82 0.00 0.00 0.82
1016 Formation 6 WS-98/1 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.84 0.84 0.00 0.00 0.84
1017 Formation 6 WS-98/2 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.68 0.68 0.00 0.00 0.68
1018 Formation 6 WS-105/1 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.71 0.71 0.00 0.00 0.71
1019 Formation 6 WS-105/2 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.69 0.69 0.00 0.00 0.69
1020 Formation 6 WS-105/3 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.82 0.82 0.00 0.00 0.82
1021 Formation 6 WS-105/4 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.50 0.50 0.00 0.00 0.50
1022 Formation 6 WS-105/5 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.82 0.82 0.00 0.00 0.82
1023 Formation 6 WS-106/5 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.70 0.70 0.00 0.00 0.70
1024 Formation 6 WS-106/6 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.63 0.63 0.00 0.00 0.63
1025 Structure 6 Marwar Building Building Building 0.00 0.43 0.67 1.09 0.00 0.00 1.09
1026 Structure 6 Chandawal Building Building Building 0.00 0.36 0.67 1.02 0.00 0.00 1.02
1027 Structure 6 429 Substructure IMB/MJB 0.00 0.00 1.50 1.50 0.00 1.50
1028 Structure 6 429 Superstructure IMB/MJB 0.00 0.00 0.00 2.86 2.86 2.86
1029 Structure 6 434 Superstructure IMB/MJB 0.00 0.00 3.58 3.58 0.00 3.58
1030 Structure 6 461 Substructure IMB/MJB 0.00 0.00 1.36 1.36 0.00 1.36
1031 Structure 6 461 Superstructure IMB/MJB 0.00 0.00 2.58 2.58 0.00 2.58
1032 Structure 6 472 Substructure IMB/MJB 0.00 0.00 1.08 1.08 0.00 1.08
1033 Structure 6 472 Superstructure IMB/MJB 0.00 0.00 2.05 2.05 0.00 2.05
1034 Structure 6 423 Completion MIB 0.00 0.00 0.09 0.09 0.00 0.09
1035 Structure 6 424 Completion MIB 0.00 0.00 0.33 0.33 0.00 0.33
1036 Structure 6 424A Completion MIB 0.00 0.00 0.01 0.01 0.00 0.01
1037 Structure 6 425A Completion MIB 0.00 0.00 0.01 0.01 0.00 0.01
1038 Structure 6 426A Completion MIB 0.00 0.00 0.01 0.01 0.00 0.01
1039 Structure 6 431 Completion MIB 0.00 0.00 1.21 1.21 0.00 1.21
1040 Structure 6 464 Completion MIB 0.00 0.00 0.05 0.05 0.00 0.05
1041 Structure 6 480 Completion MIB 0.00 0.00 2.53 2.53 0.00 2.53
1042 Structure 6 427-B Completion MIB 0.00 0.00 0.10 0.10 0.00 0.10
1043 Structure 6 428 Completion MIB 0.00 0.00 0.08 0.08 0.00 0.08
1044 Structure 6 432 Completion MIB 0.00 0.00 0.89 0.89 0.00 0.89
1045 Structure 6 454 Completion MIB 0.00 0.00 0.16 0.16 0.00 0.16
1046 Structure 6 456 Completion MIB 0.00 0.00 0.32 0.32 0.00 0.32
1047 Structure 6 462 Completion MIB 0.00 0.00 0.53 0.53 0.00 0.53
1048 Structure 6 463 Completion MIB 0.00 0.00 4.06 4.06 0.00 4.06
1049 Structure 6 465 Completion MIB 0.00 0.00 2.07 2.07 0.00 2.07
1050 Structure 6 426 Completion MIB 0.00 0.00 2.36 2.36 0.00 2.36
1051 Structure 6 LC31 Completion RUB 0.00 0.00 4.54 4.54 0.00 4.54
1052 Structure 6 LC27 Completion RUB 0.00 0.00 1.07 1.07 0.00 1.07
1053 Structure 6 LC30 Completion RUB 0.00 0.00 0.46 0.46 0.00 0.46
1054 Structure 6 LC24 Completion RUB 0.00 0.00 0.58 0.58 0.00 0.58
1055 Structure 6 LC25 Completion RUB 0.00 0.00 0.00 3.29 3.29 3.29
1056 Structure 6 LC26 Completion RUB 0.00 0.00 0.00 3.08 3.08 3.08
1057 Structure 6 Bangurgram Completion PS 0.00 0.00 1.96 1.96 0.00 1.96
1058 Structure 6 Sendra 2% Completion PS 0.00 0.00 0.02 0.02 0.00 0.02
1059 Structure 6 Sendra Completion PS 0.00 0.00 0.00 0.74 0.74 0.74
1060 Structure 6 97 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 2.31 2.31 0.00 2.31
1061 Structure 6 105 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.65 0.65 0.00 0.65
1062 Structure 6 98 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.84 0.84 0.00 0.84
1063 Structure 6 100 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.67 0.67 0.00 0.67
1064 Structure 6 104 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 1.99 1.99 0.00 1.99
1065 Structure 6 98 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.81 0.81 0.00 0.81
1066 Structure 6 103 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.21 0.21 0.00 0.21
1067 Structure 6 104 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.67 0.67 0.00 0.67
1068 Structure 6 99 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.68 0.68 0.68
1069 Structure 6 100 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.84 0.84 0.84
1070 Structure 6 104 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.67 0.67 0.67
1071 Structure 6 99 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.84 0.84 0.84
1072 Structure 6 100 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.84 0.84 0.84
1073 Structure 6 100 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.80 0.80 0.80
1074 Structure 6 104 ERS/Drains/Turfing/C&G Completion ERS/Drains/Turfing/C&G 0.00 0.00 0.00 0.84 0.84 0.84
1075 Structure 6 Marwar Building Building Building 0.00 0.00 0.32 0.92 0.58 1.81 0.72 0.72 2.54
1076 Structure 6 Chandawal Building Building Building 0.00 0.00 0.63 0.98 0.04 1.65 0.00 1.65
1077 Structure D 649 Superstructure IMB/MJB 11.71 11.71 0.00 0.00 0.00 11.71
10/39680 Substructure IMB/MJB 0.35 0.35 0.00 0.00 0.00
1078 Structure D 0.35
1079 Structure D 786 Foundation IMB/MJB 1.00 1.00 0.00 0.00 0.00 1.00
1080 Structure D 793 Foundation IMB/MJB 0.98 0.49 1.47 0.00 0.00 0.00 1.47
1081 Structure D 821 Substructure IMB/MJB 1.07 1.07 0.00 0.00 0.00 1.07
804 Foundation IMB/MJB 1.24 0.62 1.86 0.00 0.00 0.00
1082 Structure D 1.86