SCHEDULE OF CEILING FINISHES:

MARKS D E S C R I P T I O N S REMARKS MARKS D E S C R I P T I O N S REMARKS

4.5 mm THK. FIBER CEMENT CEILING BOARD EXPOSED R. C. UNDER SLABS WITH PLAIN ADOPT FINISH FOR STAIR/S UNDER SLAB
CL - 1 PROVIDE 12 mm X 38 mm X 5 m. X 0.8 mm THK. CL - 3
WITH DROP CEILING PAINTED FINISH CEMENT PLASTER PAINTED FINISH (SEE DET. OF STAIR / S)
METAL CARRYING CHANNEL (CEILING JOIST) AT
1200 mm ON CENTER WITH
19 mm X 50 mm X 5 m. X 0.5 mm THK. METAL
4.5 mm THK. FIBER CEMENT CEILING BOARD DOUBLE FURRING CHANNEL (CEILING NAILER) ALUMINUM METAL CLADDING (@ CANOPIES /
CL - 2 WITH PAINTED FINISH AND WITH 150 mm WIDE AT 400 mm ON CENTER AND WITH CL - 4 R.C. PARAPET / MEDIA AGUA/S / ACCU LEDGE)
RECESSED CORNERS (DARKER PAINT) 12 mm X 38 mm X 5 m. X 0.8 mm THK. METAL SEE MANUFACTURER'S SPECS. SEE MANUFACTURER'S SPECS. (SUBMIT SHOP
CHANNEL (CEILING HANGERS) AT 1200 mm ON DRAWINGS INCLUDING COLOR SCHEMES FOR
CENTER APPROVAL)
(TYPICAL ON ALL ROOMS) ALUMINUM METAL CLADDING/ CEILING PANELS ON
CL - 2a 4.5 mm THK. FIBER CEMENT CEILING BOARD CL - 4a METAL FURRINGS
WITH PAINTED FINISH
SEE MANUFACTURER'S SPECS.

CL
1 2 3 4 5 6 7 8
7 EQUAL BAYS @ 5000 = 35000mm

5000 10000 5000 10000 5000


3300 1700 3425 6575 750 3500 750 R.C. CANOPY W/ ALUM. METAL 1700 3050
CLADDING (TYPICAL OTHER SIDE) (CLEAR)
300 1750 3250 R.C. MEDIA AGUA W/ ALUM. METAL 3250 1750 300
LINE OF PARAPET ABOVE CLADDING (TYPICAL OTHER SIDE)
1000 1000
LINE OF MEDIA AGUA ABOVE
1000 300

1000 300
1500

CL-4a

600
PIPE CHASE CL-4 CL-4 CL-4 CL-4 PIPE CHASE

500
OPEN
2350

SERVER AREA
CL-2a

FINANCIAL
CONSTRUCTION
5000

5000

5000
MANAGEMENT CL-1
SECTION SECTION
CL-2 CL-2
2650

CL-2a

C
3 EQUAL BAYS @ 5000 = 15000mm

500 3900 500


LINE OF MEDIA AGUA

2500

2500
H A L L W A Y 1000 1900 1000 H A L L W A Y CL-2a
CL-2 CL-2

LINE OF MEDIA AGUA


500 500
PANTRY AREA
5000

CL-2a

RECEPTION /

2500
STAFF
CL-2a
450
RECEPTION /
B STAFF
CL-2
DISTRICT ASST.
675 675

7500
ENGINEER CONFERENCE DISTRICT ENGINEER
2400

2400
CL-4

CL-4
CL-1 ROOM CL-1
CL-1
5000

1000

1000
2400

FILE / STO.
CL-2a
REST AREA / STUDY RM. UTILITY
2350

2350
W/ KITCHENETTE CL-2a
TOILET
1350

1350
CL-2 CL-2a
675

650
500
A
850

CL-4 CL-4 CL-4 CL-4


CL-4
2000

2000
3
650

A-6
250

CL-4a CL-4a
300

300
4
LINE OF R.C. MEDIA AGUA ABOVE LINE OF R.C. MEDIA AGUA ABOVE
A-6
2250 1000 250 1400 1400 1000
3250 1750 2920 2080 1500 1750 3250

650 750 3500 750 650 (UP TO R.C. MEDIA AGUA)

5000 5000 5000 5000 5000 10000


6300

1 SECOND FLOOR REFLECTED CEILING PLAN


SCALE 1:100 M
A-9

TRACED BY : (COPIED FROM ORIGINAL PLAN)


PROJECT & LOCATION: SHEET CONTENTS: CHECKED & VERIFIED BY : SUBMITTED BY: RECOMMENDING APPROVED BY: APPROVED BY: SET NO. SHEET NO.

JOVEN MARK D. ORIEL


PROPOSED TWO (2) - STOREY DPWH Engineering Assistant
- 2/F REFLECTED CEILING PLAN
DISTRICT ENGINEERING OFFICE CHECKED BY :
BUILDING, MANCAROGO, BISLIG CITY, - SCHEDULE OF CEILING FINISHES
RICARDO N. ORIEL FERDINAND C. ACMA CANDELARIO P. PORTILLO NOEL R. OCLARIT
BISLIG CITY SURIGAO DEL SUR 2ND LD Chief ,Planning & Design Section OIC - Assistant District Engineer District Engineer
Asst. Chief, Planning & Design Section
JEFFREY M. CORDERO
Architect II