You are on page 1of 1

4

Explanation:

A'
+0.15
1. Transformation between absolute and relative coordinates:
East North
Absolute coordinates
01 02 03 486343.550 3501020.120
+0.45 UTM (m)

Relative coordinates
(m) 0.000 0.000
Mild slope +0.17

A 2. Elevation measurements in meters.


(Note: Reference here should be the same as for the survey drawings)
+0.47
06. Toilet 07.
08. Electrical room
with shower Janitor's 3. Measurements in meters except where noted.
room 01. Entrance
4.
FM200 protects
B B'
the Electraical, 5. The facade precast concrete panels arrangement is orientative as well as the anchorage system.
03. I&C The system shall be defined according to supplier and subjet to approval.
B
room I&C y Security
rooms 2
6. Building perimeter sidewalk shall be adjusted according to document
1 4011-DRA-ABE-066-360-0001_Urbanization drawing
04. Office
7. In IFD document, general urbanization elevations are shown in relative coordinates.
05. Security
Room 04 02. Rest area
8. This document is not for construction.

Cooking area
References:
C
04
As per approval - 4011-DRA-ABE-000-000-0006_Power block layout
04
Survey point: - 4011-DRA-ABE-075-422-0053_Rev03 Electrical Layout Driver Room
Walkway
E: 85.871 +0.15
(width=1.50m)
N: 1109.912
List of abbreviations:

A
3 - TOC: Top of concrete
- FFL: Finish floor level

4
A'

12.58

5.00 7.00
1.50 2.80 1.50
01 02 03
0.40

1.90

0.40 2.00
1.50
1.50 4.26 0.60 1.84 1.20 4.68 1.50

A
2.50 1.75 1.10 1.75 3.75
2.49
1.74

1.84

3.50
3.18

B
4.42

1.00

B'
1.20

4.98
B
7.58

1.79

1 2
4.63
3.29

3.50

04
1.00
2.00

4.98 3.75
1.30

C
As per approval 1.50
04
1.50

Survey point:
E: 85.871 1.06 0.90 3.82 2.40 4.40
N: 1109.912
A

04 2018/05/09 SEC comments IFD HGRC ALNM RPR VTM


03 2018/05/09 I&C and electrical panels location IFD HGRC DGV RPR VTM
02 2017/03/20 SEC Comments IFD MRP DGV RPR VTM
01 2016/08/04 Revision IFD AIRS CSG JNM / NPS VTM
00 2016/04/29 Preliminary design IFD EGF CSG JNM / NPS VTM
Rev. Edition Description: Issue Signature Signature Signature Signature
No.: Date: for: Drawn: Checked: Reviewed: Approved:
Location:

Client: P. Engineer (if applicable):


Stamp: Signature: P.Eng.No:

EPC Contractor: EPC Subcontractor:


Consultant:
ABENER
Project: Supplier:
CONSTRUCTION OF
Waad Al-Shamal ISCCPP
Scale: Auxiliary Buildings Drawing No.:

Title & Subtitles:


4011-DRA-ABE-056-370-0001
1:100 Civil works Sheets: Sheet No.:
Architecture. Basic plans 01 00
Size:
Driver room building Int. Drawing No.
A1 Plan views & dimensioned views
This drawing and the design it covers are the property of Abener. They have been Project/Contract number: 4400006770
merely loaned by express agreement of the borrower, who states that it cannot be
reproduced, copied, loaned, exhibited or used under any circumstances. As an Document status: X For approval. For information.
exception, it can be used in a limited and private way, as long as Abener gives
permission to the borrower for using it through a written consent . Critical: Yes X No

You might also like