You are on page 1of 2

Explanation:

1. Transformation between absolute and relative coordinates:


East North
North & Qibla directions for Absolute coordinates UTM (m) 486343.550 3501020.120
LTSA Warehouse for Solar system Relative coordinates (m) 0.000 0.000

01 4B 4A 04 7B 7A 07 01 4B 4A 04 7B 7A 07 2. Elevation measurements in meters,(Note: Reference here should be the same as for the survey drawings)
3. Measurements in meters.
47.12 4.
5. General elevations are on hold waiting for final urbanization.
6. Final building height shall be verified with the definitive structural system and the HVAC system
7C 7C
Column survey point will be in 7. This document is not for construction.
accordance with the instructions 8. Indicated useful surfaces are preliminary because of definitive surface depend on the thickness of the
enclosures and definitive distribution.
9. In the case of both building LTSA for GTG and LTSA for Solar System, layout of building is the same; only

1.50

1.50
2 2
46.52 the case of orientation have to considered as have been defined on north notes.(As per approval).

0.900
A 5.00 1.20 1.20 A
5.00 Instructions:
1. Defined total width, length and height for the building can not vary. Additionally, minimum internal
+852.03 +852.03 headroom, equipment clearance and free space for storage racks have to be considered and
A A
+852.03 +852.03 +852.03 +852.03 maintained.
0,5% 2,2% 2,2% 0,5% 2,2% 2,2%
+852.03 +852.03 2. Constructive solution for the structural elements can be changed in order to optimize and obtain the
+851.97 +851.97 +851.97 +851.97 7.78 most economic design; taking into account the defined requirements on drawings (height, headroom,
+852.01 +852.01

6.81
3 3 opening, clearance of passage-ways, etc).

6.88
6 6

8.36
3. Minimum clearance between base-plate and internal face of enclosure 100mm.
+852.03 +852.03 +852.03 4. Steel profile for doors or windows frame have to be defined taking into account precast concrete panel
+852.03
0.34 6.24 1.21 position and sandwich panel fixation.
1,6% 0,5% 0,5% 1,6% 1,6% 0,5% 0,5% 1,6% 5. Span between frames and columns have to be updated in accordance with the details and all the other
B B instructions of the document. Designer shall purpose the most optimized and economic solution taking

1.55
E E into account opening, height and equipment requirements.
4 4 6. Clearance between structural steel frames can be modified in order to optimize the design of steel
structure.
7.78 13

3.20
+852.03 Shower & +852.15 13 +852.03 Shower & 7. Clearance between steel purlin can be modified in order to optimize the design of steel structure.
2 2

7.15
eye washer eye washer
0,5% 0,5% D D' 0,5% 0,5% D D' 8. Steel structure bracing (if necessary) will be consider by the designer taking into account the location and
+852.15
FM200 protects size of opening and passageways and considering the defined codes and standard by the client.
E' Electrical and E' 9. Installation height, clearance between top of equipment and roof, span and load for the installation of
OHT-crane or hoist have to be confirmed with the supplier equipment information and requirement.
+852.01 IT rooms +852.01 10. The structural details for the installation of OHT-crane or hoist have to be considered and included in
C C
the steel structure drawings.

6.80
0,5% +852.03 0,5% +852.03 11. As general rule the sums of base-plate thickness and grouting thickness has been defined as 50mm
thickness; grouting thickness have to guarantee the installation on leveling nut and at maximum 50mm.
7 7.78 12. To define TOP for steel structure base-plate, concrete column are located 150mm above FFL.
+852.03 +852.03 +852.03 +852.03

37.00

36.40

35.47
7.15
7 13. In the case of columns located inside or around the perimeter of an office area alternative solution for
3 +852.03 +852.03 FM200 4 3 +852.03 +852.03 4 top of base-plate location can be considered in order to simplify the construction process, in any case,
+851.97 +851.97
steel protection has to be in accordance with technical specifications requirements.
0,5% +851.97 0,5% +851.97 14. FFL for office and FFL for storage areas shall be the same; on the other hand, FFL will be 150mm above
sidewalk level; at the same time, sidewalk will be 150mm above road level.
D C C' D C C' 15. Total skylight surface cannot be greater than 6% of total net surface. Skylight final dimensions shall be
updated taking into account purlin clearance and position.
8.10 8.10 16. Enclosure concrete panel is self-supporting, nonetheless wind load will be transmitted directly to the
+852.01 1,6% 0,5% 0,5% 1,6% +852.01 1,6% 0,5% 0,5% 1,6% steel structure through the anchorage of the panel to it.
1 1

7.15
17. Final number of ventilation grilles is pending to be defined, hence the quantity and dimensions of them
0,5% 0,5% 8 0,5% 0,5% 8 can vary.
18. As general rule for HVAC equipment area, consider 1,00 kN/m2 as dead load additionally to roof/slab
+852.03 5 +852.03 5 live load (as per specifications in functions of usage and slope).
+852.03 +852.03 19. For gutter installation detail, maximum rainfall intensity, slope and surface of roof shall be considered in
+852.03 +852.03
E E order to define the minimum section in accordance with SBC-701_Sanitary.
20. Total number and dimensions of exit or exit access doorways shall be in accordance with the local codes
(SBC-201 & SBC-801) and international codes (NFPA-101); taking into account the maximum travel
+852.03 +852.03 distance with the updated lay-out of the building and the type of occupation.
3 3 21. Pallet racking and storage purpose only for information.

7.15
22. Additional load will be considered around the perimeter of the building for electrical and I&C trays. 300
+851.97 +851.97 +851.97 +851.97
kg/m at 3,50 meters height; in the case of higher doors; this load will be considered 0,50 meters at least
0,5% 2,2% 0,5% 2,2% above the upper level of them.
B +852.03 2,2% B' B +852.03 2,2% B'
+852.03 +852.03 23. Provide an independent stairs structure. However it must be considered the bracing- connexion of this
+852.03 +852.03 +852.03 +852.03
F F stairs with the building structure
24. Enclosure requirements:
5.00

1.50
1.20

1.20

1.50
+851.88 5.00 1.20 +851.88 1.20 1.20 2.40

0.62
24.1. Insulated (U min ) pre-cast concrete panel, minimum height 3,00 meters, minimun
thickness 250 mm.
Survey point: Survey point:

1.50
24.2. Sandwich panel for wall, U min
LTSA Warehouse for Solar system: LTSA Warehouse for Solar system: 24.3. Sandwich panel for roof, U min
E: 619.350 1 E: 619.350 1 24.4. Skylight for roof, U min and SF (solar factor) 0,35

6.00

6.00
N: 985.880 0.96
N: 985.880 7.20 7.70 7.70 7.70 7.45 7.45 25. Fire resistance of structure and enclosure will be in accordance with :
9 9
(As per approval) (As per approval) Occupancy: Group S-1 or H [IBC/SBC-801] Storage or High-Hazard [NFPA 850/101]

5.00
Type of construction: Type II (111) [NFPA 5000/220] Type I(A) [IBC Chapter 6 / SBC-801]
Definitive fire resistance for structure and enclosure have to be confirmed in function of the stored
J J J J materials.
26. Acoustic insulation will be in accordance with GEMSS-G-02 Rev 02 Plant Design Criteria; in function of
the distance between the building and the equipment.
27. Metallic fence for protection column will be provided in the case of storage areas with forklift traffic;

6.00
fence will be define on typical drawings document for stairs, handrail and fences.

8.00
E E' E E'

List of abbreviations & legend:

31.50
J1 J1 TOF: Top of foundation TOP: Top of plate LTSA: Long Term Service Agreement
Storage bay Storage bay Storage bay Storage bay TBD: To be discussed SP: Stakeout point TOC: Top of concrete
15.00 x 8.00 m 15.00 x 8.00 m 15.00 x 8.00 m 15.00 x 8.00 m FFL: Finish floor levelTop of concrete
I I

32.00
6.00
07 2019/02/18 TRM Revision Feb-19 IFD HGRC ALNM RPR VTM
12 12
06 2018/11/30 New electrical room inclusion IFD HGRC ALNM RPR VTM

24.00
8.00

10 11 I1 10 11 I1 05 2018/03/08 Updated IFD RMG LEVA RPR VTM


04 2017/11/09 Revision as per comments IFD RMG LEVA RPR VTM
03 2017/10/04 General revision IFD RMG LEVA RPR VTM

6.00
Storage bay Storage bay Storage bay Storage bay Rev. Edition Description: Issue Signature Signature Signature Signature
15.00 x 8.00 m 15.00 x 8.00 m 15.00 x 8.00 m 15.00 x 8.00 m No.: Date: for: Drawn: Checked: Reviewed: Approved:
H H
Location:
H1 H1
8.00

6.00
Storage bay Storage bay Storage bay Storage bay
G 15.00 x 8.00 m 15.00 x 8.00 m G G 15.00 x 8.00 m 15.00 x 8.00 m G
01 07 01 07
09 09
0.50

0.50
A' A'
08 10 08 10
0.50 8.00 5.92 10.00 10.00 6.20 5.80 0.70
Ground floor plan view 47.12
LTSA Warehouse for Solar system 0.46 Ground floor dimensioned view 0.21
Scale 1:200 LTSA Warehouse for Solar system
Scale 1:200

Surface schedule LTSA Warehouse for Solar System Surface schedule LTSA Warehouse for Solar System
CODE AREA SURFACE CODE AREA SURFACE Client: P. Engineer (if applicable):
1 General storage area 8.5 IT Rooms Stamp: Signature: P.Eng.No:
2 Heavy parts storage area 8.6 Kitchen
3 Receiving and inspection area 8.7 Technical Rooms EPC Contractor: EPC Subcontractor:
4 Hazardous & chemical storage area 8.8 Locker Room Consultant:
5 Bottle gas hazardous storage area 8.9 Toilets and showers area ABENER
6 Sensitive I&C equipment storage room [air conditioned] 8.10 Janitor's Room
7 Sensitive electrical equipment storage room [air conditioned] Total usable area (including office and air aconditioned storage rooms) Project: Supplier:

Total built area (including office and air aconditioned storage rooms)
Total built area (including office and air aconditioned storage rooms) CONSTRUCTION OF
Total usable area air conditioned storage rooms
9 Open asphalt paved area Waad Al-Shamal ISCCPP
10 Partially covered material storage yard
Scale: General buildings Drawing No.:

Title & Subtitles:


Total built area air conditioned storage rooms 11 Open storage area yard
4011-DRA-ABE-057-370-0011
Offices building Covered parking [8un] 1:200 Civil works
8 12 Sheets: Sheet No.:
8.1 Entrance Total built area of exterior paved space* Architecture 04 01
Size:
8.2 Office
*Including partiallyd covered storage yard and covered parking LTSA Warehouses for GTG and solar system Int. Drawing No.
A1 Ground floor. Plan and dimensioned views (solar syst.)
8.3 Storage Rooms 13 Electrical Room
This drawing and the design it covers are the property of Abener. They have been Project/Contract number: 4400006770
8.4 Corridor merely loaned by express agreement of the borrower, who states that it cannot be
reproduced, copied, loaned, exhibited or used under any circumstances. As an Document status: X For approval. For information.
exception, it can be used in a limited and private way, as long as Abener gives
permission to the borrower for using it through a written consent . Critical: Yes X No
North & Qibla directions for Explanation:
47.12
LTSA Warehouse for GTG 37.92 8.00 0.50
1. Transformation between absolute and relative coordinates:
East North

0.50
10 08 10 08 Absolute coordinates UTM (m) 486343.550 3501020.120

0.50
0.70 Relative coordinates (m) 0.000 0.000
07 A' 09 01 07 A' 09 01
G G G G 2. Elevation measurements in meters,(Note: Reference here should be the same as for the survey drawings)
6.00 3. Measurements in meters.

3.00
9.00 4.
5. General elevations are on hold waiting for final urbanization.

6.00
6. Final building height shall be verified with the definitive structural system and the HVAC system

8.00
3.00
7. This document is not for construction.
8. Indicated useful surfaces are preliminary because of definitive surface depend on the thickness of the
H1 H1 enclosures and definitive distribution.
9. In the case of both building LTSA for GTG and LTSA for Solar System, layout of building is the same; only

3.00
H H the case of orientation have to considered as have been defined on north notes.(As per approval).

6.00
Instructions:
1. Defined total width, length and height for the building can not vary. Additionally, minimum internal

3.00
headroom, equipment clearance and free space for storage racks have to be considered and
maintained.

25.00

8.00
I1 11 10 I1 11 10 2. Constructive solution for the structural elements can be changed in order to optimize and obtain the
most economic design; taking into account the defined requirements on drawings (height, headroom,

3.00
12 12 opening, clearance of passage-ways, etc).

30.65
3. Minimum clearance between base-plate and internal face of enclosure 100mm.

6.00
4. Steel profile for doors or windows frame have to be defined taking into account precast concrete panel
I I position and sandwich panel fixation.

3.00
5. Span between frames and columns have to be updated in accordance with the details and all the other
instructions of the document. Designer shall purpose the most optimized and economic solution taking
J1 J1
into account opening, height and equipment requirements.
6. Clearance between structural steel frames can be modified in order to optimize the design of steel

3.00

8.00
structure.
E' E E' E 7. Clearance between steel purlin can be modified in order to optimize the design of steel structure.

6.00
8. Steel structure bracing (if necessary) will be consider by the designer taking into account the location and
size of opening and passageways and considering the defined codes and standard by the client.

3.00
9. Installation height, clearance between top of equipment and roof, span and load for the installation of
J J J J OHT-crane or hoist have to be confirmed with the supplier equipment information and requirement.
+850.65 +850.65 10. The structural details for the installation of OHT-crane or hoist have to be considered and included in
9 9 the steel structure drawings.
Survey point: Survey point: 1.20 1.20 1.20
2.07 2.40 2.34 1.51 5.00 2.29 11.70 1.71 5.00 9.51 11. As general rule the sums of base-plate thickness and grouting thickness has been defined as 50mm
LTSA Warehouse for GTG: LTSA Warehouse for GTG:

5.00
thickness; grouting thickness have to guarantee the installation on leveling nut and at maximum 50mm.
E: 191.150 E: 191.150
12. To define TOP for steel structure base-plate, concrete column are located 150mm above FFL.

8.12

8.13
0.65
N: 716.861 1 N: 716.861 1 13. In the case of columns located inside or around the perimeter of an office area alternative solution for
(As per approval) (As per approval) 0.87 7.29 7.70 7.70 7.70 7.70 7.29 0.87
top of base-plate location can be considered in order to simplify the construction process, in any case,

1.20
1.20
steel protection has to be in accordance with technical specifications requirements.

0.15
14. FFL for office and FFL for storage areas shall be the same; on the other hand, FFL will be 150mm above
sidewalk level; at the same time, sidewalk will be 150mm above road level.
+850.95 F +850.95 F 15. Total skylight surface cannot be greater than 6% of total net surface. Skylight final dimensions shall be
+850.95 +850.95

0.15
+850.95 +850.95 0,5% +850.95 +850.95 0,5% updated taking into account purlin clearance and position.
2,2% 2,2% 2,2% 2,2%

69.00

69.00
B' B B' B 16. Enclosure concrete panel is self-supporting, nonetheless wind load will be transmitted directly to the
7.57 steel structure through the anchorage of the panel to it.
+850.89 3 +850.89 +850.89 3 +850.89 17. Final number of ventilation grilles is pending to be defined, hence the quantity and dimensions of them

7.15
9.69
can vary.
18. As general rule for HVAC equipment area, consider 1,00 kN/m2 as dead load additionally to roof/slab
+850.95 +850.95 live load (as per specifications in functions of usage and slope).
19. For gutter installation detail, maximum rainfall intensity, slope and surface of roof shall be considered in
+850.93 E +850.93 E order to define the minimum section in accordance with SBC-701_Sanitary.
+850.95 +850.95 20. Total number and dimensions of exit or exit access doorways shall be in accordance with the local codes

18.20
1.00
5 5 (SBC-201 & SBC-801) and international codes (NFPA-101); taking into account the maximum travel
FM200 protects +850.95 +850.95
+850.95 +850.95 distance with the updated lay-out of the building and the type of occupation.
Electrical and 8 1 8 1 21. Pallet racking and storage purpose only for information.

7.15
0.60
2.14
0,5% 0,5% 0,5% 0,5% 22. Additional load will be considered around the perimeter of the building for electrical and I&C trays. 300
IT rooms 1,6% 0,5% 0,5% 1,6% 1,6% 0,5% 0,5% 1,6% kg/m at 3,50 meters height; in the case of higher doors; this load will be considered 0,50 meters at least
8.10 8.10 above the upper level of them.
23. Provide an independent stairs structure. However it must be considered the bracing- connexion of this

0.60
2.18
D D stairs with the building structure
C' C C' C 24. Enclosure requirements:

0.44
0,5% 0,5% 24.1. Insulated (U min ) pre-cast concrete panel, minimum height 3,00 meters, minimun

7.15
E' thickness 250 mm.
30.65
+850.89 +850.89 +850.95 +850.89 +850.89 +850.95 24.2. Sandwich panel for wall, U min

0.60
FM200

36.40

37.00
+850.95 +850.95
4 D' D 3 4 7.78 3 24.3. Sandwich panel for roof, U min
+850.95 +850.95 24.4. Skylight for roof, U min and SF (solar factor) 0,35
+850.95 0,5% +850.95 0,5% 25. Fire resistance of structure and enclosure will be in accordance with :

6.80
7 +850.95 7 +850.95 Occupancy: Group S-1 or H [IBC/SBC-801] Storage or High-Hazard [NFPA 850/101]
E Type of construction: Type II (111) [NFPA 5000/220] Type I(A) [IBC Chapter 6 / SBC-801]
C C Definitive fire resistance for structure and enclosure have to be confirmed in function of the stored
materials.
E' 26. Acoustic insulation will be in accordance with GEMSS-G-02 Rev 02 Plant Design Criteria; in function of
1,6% 0,5% 1,6% 1,6% 0,5% 1,6% the distance between the building and the equipment.
2 0,5% +850.95 2 0,5% +850.95

7.15
+851.07 D' 7.78 D 27. Metallic fence for protection column will be provided in the case of storage areas with forklift traffic;

3.20
0,5% 0,5% 0,5% 0,5% fence will be define on typical drawings document for stairs, handrail and fences.
13 13 +851.07

19.75

18.20
4 4
List of abbreviations & legend:

1.55
Shower & E Shower &
eye washer B eye washer B TOF: Top of foundation TOP: Top of plate LTSA: Long Term Service Agreement
+850.93 +850.95 +850.93 TBD: To be discussed SP: Stakeout point TOC: Top of concrete
+850.95 1.21 6.24
0.34 FFL: Finish floor levelTop of concrete
6 +850.95 6 +850.95

8.36

6.88
3 3

6.81
07 2019/02/18 TRM Revision Feb-19 IFD HGRC ALNM RPR VTM
+850.89 +850.89 +850.89 +850.89
7.78 7.57 06 2018/11/30 New electrical room inclusion IFD HGRC ALNM RPR VTM
+850.95 +850.95
2,2% 2,2% 2,2% 2,2% 05 2018/03/08 Updated IFD RMG LEVA RPR VTM
0,5% 0,5%
+850.95 +850.95 +850.95 +850.95 04 2017/11/09 Revision as per comments IFD RMG LEVA RPR VTM
A A
+850.95 +850.95
03 2017/10/04 General revision IFD RMG LEVA RPR VTM
Issue Signature Signature Signature Signature

0.90
Rev. Edition Description:
A A No.: Date: for: Drawn: Checked: Reviewed: Approved:
2 2 Location:
9.51 5.00 1.70 11.70 2.29 5.00 9.51
1.20 1.20

7C 7C

07 7A 7B 04 4A 4B 01 07 7A 7B 04 4A 4B 01
Ground floor plan view
LTSA Warehouse for GTG Ground floor dimensioned view
Scale 1:200
Building ground floor FFL: 850.950 m (GTG)
LTSA Warehouse for GTG
Scale 1:200
Sidewalk FFL: 850.800 m (GTG)

Surface schedule Warehouse for GTG Surface schedule LTSA Warehouse for GTG
Client: P. Engineer (if applicable):
CODE AREA SURFACE CODE AREA SURFACE Stamp: Signature: P.Eng.No:
1 General storage area 8.5 IT Rooms
2 Heavy parts storage area 8.6 Kitchen
3 Receiving and inspection area 8.7 Technical Rooms EPC Contractor: EPC Subcontractor:
Hazardous & chemical storage area Consultant:
4
5 Bottle gas hazardous storage area
8.8 Locker Room
8.9 Toilets and showers area
ABENER
6 Sensitive I&C equipment storage room [air conditioned] 8.10 Janitor's Room
Project: Supplier:
7 Sensitive electrical equipment storage room [air conditioned] Total usable area (including office and air aconditioned storage rooms)
Total built area (including office and air aconditioned storage rooms)
CONSTRUCTION OF
Total built area (including office and air aconditioned storage rooms)
9 Open asphalt paved area Waad Al-Shamal ISCCPP
Total usable area air conditioned storage rooms Partially covered material storage yard
10 Scale: General buildings Drawing No.:

Title & Subtitles:


Total built area air conditioned storage rooms Open storage area yard 4011-DRA-ABE-057-370-0011
11 1:200 Civil works
Offices building Covered parking [8un] Sheets: Sheet No.:
8 12 Architecture 04 02
Size:
8.1 Entrance Total built area of exterior paved space* LTSA Warehouses for GTG and solar system Int. Drawing No.
8.2 Office
*Including partiallyd covered storage yard and covered parking A1 Ground floor. Plan and dimensioned views (GTG)
8.3 Storage Rooms 13 Electrical Room This drawing and the design it covers are the property of Abener. They have been Project/Contract number: 4400006770
merely loaned by express agreement of the borrower, who states that it cannot be
8.4 Corridor reproduced, copied, loaned, exhibited or used under any circumstances. As an Document status: X For approval. For information.
exception, it can be used in a limited and private way, as long as Abener gives
permission to the borrower for using it through a written consent . Critical: Yes X No

You might also like