You are on page 1of 2

O

Explanation:

1. Transformation between absolute and relative coordinates:


East North
Absolute coordinates
UTM (m) 486343.550 3501020.120
B
1 B P Relative coordinates
(m) 0.000 0.000
09
852.28
09
852.28 FM200 protects 2. Elevation measurements in meters.
Mild 09 Mild 852.28 (Note: Reference here should be the same as for the survey drawings)
852.30 slope
I& and Security slope 852.30
11 Security
852.58 852.60 room
rooms 25 IT&C room 852.60 852.58 3. Measurements in meters.
28 31
852.30 4.
Secondary 852.30 852.30 Secondary
access 09 access
852.30 max. 8% 852.30 5. The facade prefabricated concrete panels arrangemet is orientative as well as the anchorage
18 Printer system. The system shall be defined according to supplier and subject to approval.
room 852.58
6. Building perimeter sidewall shall be adjusted according to document
Mild 4011-DRA-ABE-066-370-0001_Urbanitazion drawing.
C slope
Q 7. Stormwater drainage system and roof fall directions shall be defined in document
19 Supervisor 4011-DRA-ABE-054-370-0014_Main Administration Building facilities.
22 Corridor office
23 Office area
02 Main 21 General Admon 26 Corridor
03 Control 852.60
reception Office 2 References:
access storage
852.60 20 General Admon 852.60
01 Main access FM
Office 1 - 4011-DRA-ABE-000-000-0006_Power block layout
200 27 Office area

List of abbreviations:
852.58 852.58
- TOC: Top of concrete
- TOP: Top of paviment (walkway)
852.30 852.30
- FFL: Finish floor level

852.28 29 Janitor's
1 04 Main hall 852.28
room
16
30 General
Toilet 2

3D Model
Video display system
2
24 Meeting room
15
09 Electrical &
06 Storage HVAC board
room

3 05 Stairs
14
F

10 General toilet 12 Tea room


D
G
E H
4
5
13
07 Toilet for 12
disabled 13 Training Manage
office

852.90

17 Training Main room


A A
852.60 852.60

14 Training Gerenal
J purpose office
08 Corridor
852.90
3 4 09 2019/03/13 Revision TRM Feb-19 IFD AFF ALNM RPR VTM
08 2019/01/30 Updated_TRM IFD AFF ALNM RPR VTM
853.20
07 2018/06/01 Revision IFD LGG DGV RPR VTM
15 Audiovisual room 06 2017/08/23 SEC Comments IFD MRP DGV RPR VTM
853.50 05 2017/07/12 Revision IFD MRP DGV RPR VTM
Sound& Mics Light Aux
recording 04 2016/10/18 SEC Comments IFD MCH DGV VMB VTM
K 03 2016/09/16 SEC Comments DGV CSG JNM / NPS VTM
IFD
02 2016/07/28 Design Revison IFD MCH/DGV CSG JNM / NPS VTM
852.60 01 2016/04/14 Design Revison IFD ATC / DGV CSG JNM / NPS VTM
00 2016/02/12 Preliminary design IFD ATC CSG JNM / NPS VTM
Rev. Edition Description: Issue Signature Signature Signature Signature
852.30 No.: Date: for: Drawn: Checked: Reviewed: Approved:
Location:
852.00

L
851.70

851.40

851.10

850.80
M

850.80 850.80

As per approval
16 Auditorium
Survey point: 851.25 851.25
E: 166.259
N: 878.509 Client: P. Engineer (if applicable):
850.90 850.90 Stamp: Signature: P.Eng.No:

N
EPC Contractor: EPC Subcontractor:
850.87 Consultant:
Mild slope
850.87
Mild slope ABENER
Project: Supplier:

852.30 Ground floor plan view CONSTRUCTION OF


Mild slope
Scale 1:100 Waad Al-Shamal ISCCPP
852.30 Scale: Administration Buildings Area Drawing No.:

Title & Subtitles:


Walkway 4011-DRA-ABE-054-370-0004
6 7 8 9 10 11 1:100 Civil Works
(width=1.50m) Sheets: Sheet No.:
Architecture. Basic plans 08 01
Size:
Main Administration Building Int. Drawing No.
A1 Ground floor. Plan view
Space reserved for the Annex Building of the Main Administration Building
See the document:
This drawing and the design it covers are the property of Abener. They have been Project/Contract number: 4400006770
merely loaned by express agreement of the borrower, who states that it cannot be
4011-DRA-ABE-054-370-0006_Main Administration building Annex building reproduced, copied, loaned, exhibited or used under any circumstances. As an Document status: X For approval. For information.
exception, it can be used in a limited and private way, as long as Abener gives
permission to the borrower for using it through a written consent . Critical: X Yes No
A
O Explanation:
FM200 protects
the IT room 1. Transformation between absolute and relative coordinates:
East North
Absolute coordinates
UTM (m) 486343.550 3501020.120

B Relative coordinates
FM
FM 0.000 0.000
1 B P (m)
200
200
22 First floor
access locker
west 29 First floor 2. Elevation measurements in meters.
access locker (Note: Reference here should be the same as for the survey drawings)
east
3. Measurements in meters.

4.
21 Printer room 28 IT&C
room 5. The facade prefabricated concrete panels arrangemet is orientative as well as the anchorage
system. The system shall be defined according to supplier and subject to approval.

6. Building perimeter sidewall shall be adjusted according to document


4011-DRA-ABE-066-370-0001_Urbanitazion drawing.

C 20 Manager 26 Manager 7. Stormwater drainage system and roof fall directions shall be defined in document
Office 2 office 2 Q 4011-DRA-ABE-054-370-0014_Main Administration Building facilities.

30 Corridor
23 Corridor 16 Manager References:
15 Manager secretary
19 Manager toilet office - 4011-DRA-ABE-000-000-0006_Power block layout
24 Office area Office 1
31 Office area List of abbreviations:
17 Facilities
reserved area - TOC: Top of concrete
14 Manager - TOP: Top of paviment (walkway)
office 1 - FFL: Finish floor level
25 Meeting
room 04 Janitor's
room
1
16
857.30

27 General
01 Hall toilet 2
2
15

18 Facilities
05 Facilities
reserved area
reserved area

3 06 Stairs
14
F
07 Tea room

D
G
12 General toilet 1
E H
4
5
13
03 Toilet for 12
disabled

A 10 Office 1 A

09 2019/03/13 Revision TRM Feb-19 IFD AFF ALNM RPR VTM


3 02 Corridor 4
08 2019/01/30 Updated_TRM IFD AFF ALNM RPR VTM
07 2018/06/01 Revision IFD LGG DGV RPR VTM
06 2017/08/23 SEC Comments IFD MRP DGV RPR VTM
05 2017/07/12 Revision IFD MRP DGV RPR VTM
04 2016/10/18 SEC Comments IFD MCH DGV VMB VTM

K 03 2016/09/16 SEC Comments IFD DGV CSG JNM / NPS VTM


02 2016/07/28 Design Revison IFD MCH/DGV CSG JNM / NPS VTM

11 Office 2 01 2016/04/14 Design Revison IFD ATC / DGV CSG JNM / NPS VTM
00 2016/02/12 Preliminary design IFD ATC CSG JNM / NPS VTM
Rev. Edition Description: Issue Signature Signature Signature Signature
No.: Date: for: Drawn: Checked: Reviewed: Approved:
08 Meeting room
Location:

09 Library

Client: P. Engineer (if applicable):


13 Library Stamp: Signature: P.Eng.No:
access
locker
N
EPC Contractor: EPC Subcontractor:
857.30 Consultant:
ABENER
Project: Supplier:
CONSTRUCTION OF
Waad Al-Shamal ISCCPP
Scale: Administration Buildings Area Drawing No.:

Title & Subtitles:


4011-DRA-ABE-054-370-0004
1:100 Civil Works Sheets: Sheet No.:
6 7 8 9 10 11 Architecture. Basic plans
Size: 08 02
Main Administration Building Int. Drawing No.
A1 First floor. Plan view
This drawing and the design it covers are the property of Abener. They have been Project/Contract number: 4400006770
merely loaned by express agreement of the borrower, who states that it cannot be
2 B reproduced, copied, loaned, exhibited or used under any circumstances. As an Document status: X For approval. For information.
exception, it can be used in a limited and private way, as long as Abener gives
permission to the borrower for using it through a written consent . Critical: X Yes No

You might also like