Professional Documents
Culture Documents
Explanation:
A'
5. The facade prefabricated concrete panels arrangement is orientative as well as the anchorage
system. The system shall be defined according to supplier and subjet to approval.
Mild slope
825.68 7. Stormwater drainage system and roof fall directions shall be defined in document
A 4011-DRA-ABE-054-370-0011_Mosque building facilities.
852.98
04 Shower References:
room
- 4011-DRA-ABE-000-000-0006_Power block layout
03 Toilet
- 4011-DRA-ABE-075-422-0072_Rev01 Electrical layout Mosque Building
5.68
FM200 82protects
the Electrical d 01 Main entra
nce
07 Electrical an List of abbreviations:
Room 852.96 4 I&C room
4
+852.53 - TOC: Top of concrete
- TOP: Top of paviment (walkway)
- FFL: Finish floor level
05
FM200
om Janitor's
06 Storage ro B
Mild slope room
05
06
B' 852.98
area
02.2 Ablution
852.98 C'
Mild slope
area
C
09 Minaret 02.1 Shoe rack
852.96
C C'
ll
08.1 Prayer ha
B'
As per approval
852.53
A