You are on page 1of 41

HVL - Hydrovar 5th Generation

MOTOR MOUNTED VARIABLE SPEED DRIVES


Hydrovar 5th Generation

2
Benefits & Value Proposition
Potential Savings in a Pumping System

Increased Efficiency

Variable Speed Control System optimization

The 40% of the potential saving in a pumping system could be reached


through a high efficiency equipment and the use of a VSD
Life Cycle Cost!

Pumping systems account for nearly 20% of the world’s electrical energy demand
and range from 25-50% of the energy usage in certain industrial plant operations.

The energy and materials used by a system depend on the design of the pump,
the design of the installation, and the way the system is operated. These factors
are interdependent.
The Impact of the VSD in the LCC

DISPOSAL
COST

MAINTENANCE
• Higher investment cost
COST

DISPOSAL
COST
• Reduction of the energy cost
between 55% and 75%

MAINTENANCE
COST
• Reduction of the maintenance cost
ENERGY
COST between 20% and 35%
ENERGY
COST
• Higher disposal cost (around 5%)
INVESTMENT INVESTMENT

WITHOUT WITH
VSD VSD
Payback Period Calculation @ Hydrovar.com
Payback Period Calculation
Payback Period Calculation

Icon placed on Desktop


Payback Period Calculation
Payback Period Calculation
Payback Period Calculation
Energy Cost Reduction

H 0.00 H 6.00 H 12.00 H 18.00 H 24.00

100 %
Water usage

75 %

50 %

25 %

Water consumption in a building is not uniform during the day.


The pumping system should be able to match the real needs of the users.
Energy Cost Reduction – Affinity Law

𝑄1 𝑛1
𝑄∝𝑛 =
𝑄2 𝑛2

ℎ1 𝑛1 2
ℎ∝ 𝑛2 =
ℎ2 𝑛2

𝑃1 𝑛1 3
𝑃∝ 𝑛3 =
𝑃2 𝑛2
Energy Consumption at Varying Speed
Hydrovar – The Benefits

Noise Reduction Lifetime extension of Reduction of water


bearings hammer

Simply by reducing the speed of the motor, we acheive these


benefits and more...
Hydrovar – The Applications

Constant pressure Control according to Constant flow Manual control


control a system curve control (actuator mode)

... plus others like constant level & constant temperature

24
Maintenance Cost Reduction

Monitoring systems through sensors and BMS

• Sensor control

• BMS communication

• Preventive maintenance

• Active protection system


Applications?

• Varying Pressure

• Flow control

• Energy saving

• Soft starting

• Motor Protection

• Water hammer

• Phase Inverter

• Multi-use…varying demand?
General Hydrovar Key Features

Motor or Wall Mountable Easy to integrate in BMS


• Simple mounting Systems
• Small footprint of the package with the HV • Modbus as standard
mounted on the motor • Complete set of Analog & Digital I/O
• Mountable in any standard AC motor • Direct motor control function (Actuator)

Pump Specific Application software


• Easy to commission Robust and Quality Design
• Easy to program and operate • IP55 as standard
• Enables virtually any configuration of pumps • Quality components
• Pump specific functions / language • Aluminum pod
operation / application software
• Safe stop of the pump
Retrofitting
• Suitable for any AC Motor in the Market
Multipump capability up to 8 pumps • Easy and cost effective installation
with the motor mounted version
• Great redundancy for failsafe systems.
• Longer lifetime of the pumps
• No external control panel is needed

Energy saving up to 70%


Integrated functions to protect pumps and motors • Variable speed pump vs fix speed pump
• Specific pump protections
(e.g. Dry run protection, shout off of the system in case of pipe burst, etc…)
• Specific motor protections
(e.g. over temperature, overcurrent, under voltage etc…)
• Log Error with date and time stamp
HVL - Hydrovar 5th Generation - Key Features

Easy and Safe Accessibility


for Wiring Harness.
• Separated wiring chamber with a dedicated cover.
• Electronic components protected
Two Tiers Offering
• Multipump capability as standard
• Premium Card Hydrovar as option for
Easier to Commission and to Operate extended I/O
• Start-up Menu • Easy product selection
• Wider LCD with additional parameters • Optimized supply chain
shown in the same page
• Extended set of Language
• Pre-programmed parameter for Standard Motors
Range Extension
• Introduction of 1,5 kW 3ph 380-460V.
Extended Communication Capabilities • Introduction of 1,5kW 2,2kW 3ph 208-240V
• BACnet as standard
• Wi-Fi card as option

THDi Filter embedded


Advanced Motor Control : • Better quality of the Grid
• Reduced heating of the motor • Reduced heating of the cables
• Extended lifetime of the motor • Extended lifetime of equipment
• Thermal protection of the motor via software • No line reactor filters
(no more PTC)
• Minimizing the drive losses
Hydrovar Extras

A single cable run between the Hydrovars and


some basic setting adjustments is all that is
required to create a multiple pump set. No
other valves, contactors or panels are required.

33
Hydrovar Protections
Main fuse to protect
the Hydrovar

Main supply line

Over voltage / Under voltage


Over temperature
detection
Inverter

Overload / Over current


Over temperature
protection
Motor

Sensor failure
Low Water protection
Low pressure cut-out to
ensure a minimum outgoing by using a pressure or float
pressure switch

e.g to protect against dry run to ensure min. suction


of the pump pressure / level
Hydrovar – Retrofitting / Installation

Hydrovar is easy to install on new


applications or retro-fitted to
existing applications, also
adaptable for for wall mount
applications.

No special motor required, can be


mounted on any standard TEFC
motor!!
Hydrovar can convert any pumps into a
“ Thinking Pump ”
Hydrovar - Tools
PC Tool:
Hydrovar + external device RS485 converter

Modbus RTU

Modbus master application

WiFi connection :
Hydrovar + WiFi Module

no special software needed - Web Browser only

37
5thGeneration HYDROVAR
Installation / Applications
Application: Pressure Booster
- Golf Course / Water Reuse
Application: HVAC
Replace / Retrofit existing solutions
Application: HVAC
Replace / Retrofit existing solutions - Competitor retrofit
Application: HVAC – Cooling Tower
- Hydrovar + e-SV with premium efficiency motors and disconnect.
Realised Retrofit-projects: Vogel 2-pump booster
Before After
Before
After
Do you know the original?
More Consultants
Have Choose
“ Hydrovar ”
for Easy Retrofitting !
Modular Design for Fail-
Safe Precaution!
Each unit is a Master
by itself
Recap
Questions
Thank you
Thank you

You might also like