AREA I

BENDUNG, INTAKE,
SALURAN TRANSISI
PEKERJAAN PERSIAPAN PEKERJAAN TANAH PEKERJAAN LANTAI KERJA PEKERJAAN BETON PEKERJAAN LAIN
PEMBERSIHAN LAHAN PENGUPASAN TANAH TIMBUNAN TANAH PEKERJAAN LEAN CONCRETE HANDRAIL BERONJONG BATU KALI
1. CUT & GRAB POHON, AKAR TANAMAN 1. KUPAS/STRIPING TANAH T=20-30 CM 1. TRANSPORT TANAH TERSELEKSI 1. INSTALL FORMWORK 1. PIPA GALVANIZED 1. PASANGAN BATU PECAH 2X1X0.5 M 1. PASANGAN BATU KALI DIA 0.5 M
2. MUAT KE DUMPTRUCK 2. MUAT KE DUMPTRUCK 2. PENGHAMPARAN TANAH TERSELEKSI 2. BETON K100 2. INSTALL HANDRAIL 2X2', H=0.9 2. DIAMETER KAWAT 2.7 MM
3. ANGKUT KE DISPOSAL AREA 3. ANGKUT KE DISPOSAL AREA 3. PEMADATAN TIMBUNAN TANAH 3. PENGECORAN AREA LANTAI KERJAI 3. PEMASANGAN SAMBUNGAN
3. PENGHAMPARAN MATERIAL 3. PENGHAMPARAN MATERIAL 4. PEMBONGKARAN BEKISTING
5. PERAWATAN BETON
GALIAN TANAH GALIAN TANAH BERBATU GALIAN BATU BETON CYCLOPE BETON K225
1. GALIAN TANAH BIASA & LEMPUNG 1. GALIAN TANAH BERBATU & KERIKIL 1. PENGHANCURAN BATU (GIANT BREAKER) 1. INSTALL FORMWORK 1. INSTALL FORMWORK
2. MUAT KE DUMPTRUCK 2. MUAT KE DUMPTRUCK 2. GALIAN BATU HASIL PENGHANCURAN 2. 60 % BATU KALI, 40 % MORTAR 1. REBAR
3. ANGKUT KE DISPOSAL AREA 3. ANGKUT KE DISPOSAL AREA 3. MUAT KE DUMPTRUCK 3. PENGECORAN BADAN BENDUNG 2. READY MIX K225
3. PENGHAMPARAN MATERIAL 3. PENGHAMPARAN MATERIAL 4. ANGKUT KE DISPOSAL AREA 4. PEMBONGKARAN FORMWORK 3. PENGECORAN
5. PENGHAMPARAN MATERIAL 5. PERAWATAN BETON 4. PEMBONGKARAN FORMWORK
5. PERAWATAN BETON