Gully trap construction


© BRANZ 2009

waste pipes (may discharge through the back of the


chamber) but must be watertight

grating must ‘pop-up’ in the event of surcharge

concrete surround if gully is likely to suffer damage

every residential building must have at least one


gully, the rim of which is 150 mm below the overflow
level of the lowest fixture
pipe bedding material

flow