You are on page 1of 11

Project Details

Project Name : drg Address Line1 :

Number of Distinct Buildings : 1 Address Line2 :

Number of EDGE Subproject(s) : 1 City :


associated
Total Project Floor Area : 2,700 m² State/ Province :
Project Owner Name : drg Postal Code :

Project Owner Email : drg@hotmail.com Country :


Project Owner Phone : Mobile 57-3008765423 Project Number : 1000488101

Share with investor(s) or bank(s)? : Yes


Associated Subproject(s):
drg

Subproject Details
Subproject Name : drg Address Line1 : carrera 53 61-73

Retail Store Name : DG Address Line2 :

Subproject Multiplier for the : 1 City : barranquilla


Project
Certification Stage : Post-Construction State/ Province :
Status : Self-Review Postal Code :
Auditor : Country : colombia
Certifier : Subproject Type : Existing Building
Year of Construction : 1999

Building Utility Data


Annual Measured Electricity Consumption : 2300 kWh/Year Existing Building Energy Performance Index

Annual Measured Water Consumption : 230 m³/Year 1.83 kWh/m²/Year

Annual Measured Natural Gas Consumption : 240 m³/Year Existing Building Water Usage Index

Annual Measured Diesel Consumption : 0 kWh/m²/Year 0.63 Lts/Person/Day

Annual Measured LPG Consumption : 0 Kg/Year

Location Data

Country : Colombia

City : Barranquilla

Basic Parameters
Type of Retail : Small Food Retail Yes Landscaped Area 1,000.00 m²

Site Area : 2,000 m² Yes Supermarket


Car Parking : Indoor Car Parking Yes Food Court

Created By: Dairo Granados File Number: 19042910067086 EDGE Version : 2.1.5
Modified By: Dairo Granados Project No.: 1000488101 Date Time: 05-May-2019 16:19:24 1
Building Data
Floors Above Ground 2 no.

Floors Below Ground 0 no.

Floor to Floor Height 7 m

Gross Internal Area Including Car Parking 2,700 m²

Default User Entry


Gross Internal Area Including Car Parking 2,700
General Sales Area 1,215 m²

Refrigerated Area 162 m²


Frozen Section 135 m²
Dry Storage 189 m²
Cold Storage Area 135 m²
Bathrooms 81 m²

Mechanical & Electrical Room 270 m²


Car Parking 270 m²
Food Court 108 m²
Supermarket 135 m²

Building Orientation
Building Lengths
Default User Entry Default User Entry

Floor Plan Depth*** : 23.24 m North 58.1

Main Orientation*** : North South 58.1

East 23.2

*** These parameters will be used to estimate building dimensions. If West 23.2
the exact details of the dimensions and orientation are available, then
complete the User Entry fields in the Building Lengths section. The Northeast -
orientation of the building will have a direct effect on energy
consumption. Northwest -

Southeast -

Southwest -

Building Systems
Does the building design include an AC system? : Yes
Does the building design include a space heating : Yes
system?

Created By: Dairo Granados File Number: 19042910067086 EDGE Version : 2.1.5
Modified By: Dairo Granados Project No.: 1000488101 Date Time: 05-May-2019 16:19:24 2
Key Assumptions for the Base Case
Default User Entry
Fuel Used for Electric Generator : Diesel Diesel
Fuel Used for Hot Water Generation : Electricity Electricity
Fuel Used for Cooking : Electricity Electricity
Fuel Used for Space Heating : Electricity Electricity
% of Electricity Generation Using Diesel : 5.00% % Ave. Yrly
Cost of Electricity : 0.080 $/kWh
Cost of Diesel Fuel : 1.95 $/L
Cost of Natural Gas : 0.53 $/L
Cost of Water : 0.04 $/kL
CO₂ Emissions from Electricity Generation : 219.83 g/kWh
Window to Wall Ratio : 30.00% %
Solar Reflectivity for Paint - Wall : 30.00% %
Solar Reflectivity for Paint - Roof : 30.00% %
Roof U-value : 1.99 W/m².K
Wall U-value : 1.86 W/m².K
Glass U-value : 5.75 W/m².K
Glass SHGC : 0.50 Factor
Cooling System : ASHRAE 90.1.2007 ASHRAE 90.1.2007
AC System Efficiency : 2.83 COP
Heating System : ASHRAE 90.1.2007 ASHRAE 90.1.2007
Heating System Efficiency : 1.00 Eff.

Monthly Average Outdoor Temperature (deg.C)


Default User Entry
Jan : 26.9
Feb : 27.0
Mar : 27.3

Apr : 27.8
May : 28.1
Jun : 28.1
Jul : 27.9
Aug : 28.1

Sep : 27.6
Oct : 27.3
Nov : 27.4
Dec : 27.3

Latitude : 11.90 Deg


Average Annual Rainfall : 855.00 mm

Created By: Dairo Granados File Number: 19042910067086 EDGE Version : 2.1.5
Modified By: Dairo Granados Project No.: 1000488101 Date Time: 05-May-2019 16:19:24 3
RESULTS
Final Energy Use : 20,731.35 kWh/Month Operational CO₂ Savings : 63.66 tCO₂/Year

Final Water Use : 718.34 m3/Month Embodied Energy Savings : 1,518.81 MJ/m²

Base Case Utility Cost : 4,568.75 $/Month Incremental Cost : 263,699.76 $

Utility Cost Reduction : 2,482.00 $/Month Payback in Years : 8.85 Yrs.


Energy Savings : 298.46 MWh/Year Water Savings : 3880.72 m³/Year

Embodied Energy in Materials : 4100.79 GJ Aggregate Floor Space : 2700.00 m²


Savings Including Multiplier

Energy Efficiency Measures 54.54% Meets EDGE energy standard

* Virtual energy is the amount of energy that will be required based on the assumption that the retail will eventually install air conditioning or heating.

CARBON EMISSIONS: 53.06 tCO₂/Year

Created By: Dairo Granados File Number: 19042910067086 EDGE Version : 2.1.5
Modified By: Dairo Granados Project No.: 1000488101 Date Time: 05-May-2019 16:19:24 4
No RTE01 Reduced Window to Wall Ratio - WWR of 20% North
South
East
West
Northeast
Northwest
Southeast
Southwest
No RTE02 Reflective Paint/Tiles for Roof - Solar Reflectivity (albedo) of 0.7 SR
No RTE03 Reflective Paint for External Walls - Solar Reflectivity (albedo) of 0.7 SR
No RTE04 External Shading Devices - Annual Average Shading Factor (AASF) of 1 AASF
No RTE05 Insulation of Roof : U-value of 0.442 W/m².K
No RTE06 Insulation of External Walls : U-value of 0.435 W/m².K
No RTE07 Low-E Coated Glass : U-value of 3 W/m².K and SHGC of 0.45 W/m².K
SHGC
Yes RTE08 Natural Ventilation with Operable Windows for Corridors, Atrium, and Common Areas
Yes RTE09 Air Economizers During Favorable Outdoor Conditions
No RTE10 Variable Refrigerant Flow (VRF) Cooling System - COP of 3.5 COP

No RTE11 Air Conditioning with Air Cooled Screw Chiller - COP of 3.63 COP
No RTE12 Air Conditioning with Water Cooled Chiller - COP of 4.95 COP
No RTE13 Ground Source Heat Pump - COP of 4.1 COP
No RTE14 Absorption Chiller Powered by Waste Heat - COP of 0.7 COP
No RTE15 Recovery of Waste Heat from the Generator for Space Heating
No RTE16 Variable Speed Drives on the Fans of Cooling Towers
No RTE17 Variable Frequency Drives in AHUs
No RTE18 Variable Speed Drives Pumps

No RTE19 Sensible Heat Recovery from Exhaust Air - Efficiency of 60% Efficiency

Created By: Dairo Granados File Number: 19042910067086 EDGE Version : 2.1.5
Modified By: Dairo Granados Project No.: 1000488101 Date Time: 05-May-2019 16:19:24 5
No RTE20 CO2 Sensor/Demand-Controlled Ventilation for Fresh Air Intake
No RTE21 High-Efficiency Condensing Boiler for Space Heating - Efficiency of 90% Efficiency
No RTE22 High-Efficiency Boiler for Water Heating - Efficiency of 90% Efficiency
Yes RTE23 Energy-Saving Light Bulbs - Sales Area
Yes RTE24 Energy-Saving Light Bulbs - Corridors and Common Areas
Yes RTE25 Energy-Saving Light Bulbs - External Spaces
No RTE26 Occupancy Sensors in Bathrooms
No RTE27 Higher Efficiency Refrigerated Cases
No RTE28 Solar Hot Water Collectors - 50% of Hot Water Demand % Hot Water
Collector Area (m²) 0.0
Yes RTE29 Solar Photovoltaics - 50% of Total Energy Demand % of Annual Electricity Use 50
Capacity (kWp) 140.2
No RTE30 Skylight(s) to Provide Daylight to 50% of Top Floor Area % Daylit Area 10
SHGC
U-value [K·m²/W]
No RTE31 Other Renewable Energy for Electricity Generation Source Type Biomass
% of Annual Electricity Use
No RTE32 Offsite Renewable Energy Procurement - Equal to 100% of total Operational CO2 % Annual Operational CO2
kWh/Year -
No RTE33 Carbon Offset - 100% of Total CO2 % Annual Operational CO2
tCO2/Year -

Created By: Dairo Granados File Number: 19042910067086 EDGE Version : 2.1.5
Modified By: Dairo Granados Project No.: 1000488101 Date Time: 05-May-2019 16:19:24 6
Water Efficiency Measures 30.75% WATER SAVINGS Meets EDGE Water Standard

Yes RTW01 Dual Flush for Water Closets in All Bathrooms - 6 L/first flush and 3 L/second flush 1st - L/flush 6

No Single Flush/Flush Valve 2nd - L/flush 3

Yes RTW02 Water-Efficient Urinals in All Bathrooms - 2 L/flush L/flush 2

Yes RTW03 Aerators & Auto Shut-off Faucets in All Bathrooms - 2 L/min L/min 2
Yes RTW04 Water-Efficient Kitchen Faucets - 4 L/min L/min 4

No RTW05 Water-Efficient Dishwashers - 2 L/Rack

No RTW06 Pre-Rinse Valve for Rinsing Operation - 6 L/min

No RTW07 Water-Efficient Landscaping - 3 L/m²/day L/m²/day


No RTW08 Condensate Water Recovery
No RTW09 Rainwater Harvesting System - 50% of Roof Area Used for Rainwater Collection % of Roof Area Used

No RTW10 Grey Water Treatment and Recycling System

No RTW11 Black Water Treatment and Recycling System

Created By: Dairo Granados File Number: 19042910067086 EDGE Version : 2.1.5
Modified By: Dairo Granados Project No.: 1000488101 Date Time: 05-May-2019 16:19:24 7
Materials Efficiency Measures 44.37% Embodied Energy Savings Meets EDGE Material Standard

RTM01 Floor Slabs Proportion % Thickness Steel Rebar


In-Situ Reinforced Concrete In-Situ Reinforced Concrete Slab mm kg/m²
Slab
350 mm
Steel : 35 kg/m²

RTM02 Roof Construction


In-Situ Reinforced Concrete Type 1 In-Situ Reinforced Concrete Slab 100 % mm kg/m²
Slab
350 mm
Steel : 35 kg/m²

RTM03 External Walls


Common Brick Wall with Type 1 Re-Use of Existing Wall 100 % mm
Internal & External Plaster
200 mm

Created By: Dairo Granados File Number: 19042910067086 EDGE Version : 2.1.5
Modified By: Dairo Granados Project No.: 1000488101 Date Time: 05-May-2019 16:19:24 8
RTM04 Internal Walls Proportion % Thickness
Common Brick Wall with Type 1 Re-Use of Existing Wall 100 % mm
Plaster on Both Sides
100 mm

RTM05 Flooring Type 1 Re-Use of Existing Flooring 100 %


Ceramic Tile

RTM06 Window Frames


Aluminium Type 1 Timber 100 % Single Glazing
Single Glazing

Created By: Dairo Granados File Number: 19042910067086 EDGE Version : 2.1.5
Modified By: Dairo Granados Project No.: 1000488101 Date Time: 05-May-2019 16:19:24 9
EDGE Certification Checklist
Building Type Certification Stage Subproject Name
Retail Post-Construction drg
Energy Measures Construction Audit Requirements
RTE08 Natural Ventilation: Corridors, Atrium > As-built drawings including floor plans and sections.
and Common Areas
> Confirmation from the project team that there have been no changes to the layout or the floor to
ceiling height during the design/construction process.
> Photographic evidence to demonstrate that the corridor layouts and location of openings as specified
at the design stage have been constructed.

RTE09 Air Economizers During Favorable > Updated system schematics.


Outdoor Conditions
> Photographs of the installed economizer.
> Purchase receipts and delivery notes for the economizers.
> Manufacturer’s data sheet for the economizers purchased.

RTE23 Energy Saving Light Bulbs- Sales Area > Photographs of the lighting installation. It is not necessary to take photos of every single installed lamp,
but the auditor must be convinced that a reasonable proportion has been checked and verified.
> As-built electrical drawings with the lighting layout if changed from design.
> Purchase receipts and delivery notes for lamps

RTE24 Energy Saving Light Bulbs- Corridors > Photographs of the lighting installation. It is not necessary to take photos of every single installed lamp,
and Common Areas but the auditor must be convinced that a reasonable proportion has been checked and verified.
> As-built electrical drawings with the lighting layout if changed from design.
> Purchase receipts and delivery notes for lamps

RTE25 Energy Saving Light Bulbs- External > Photographs of the lighting installation. It is not necessary to take photos of every single installed lamp,
Areas but the auditor must be convinced that a reasonable proportion has been checked and verified.
> As-built electrical drawings with the lighting layout if changed from design.
> Purchase receipts and delivery notes for lamps

RTE29 Solar Photovoltaics > As-built roof plan showing the location, orientation, and angle of the panels if changed from design.
> Purchase receipts and delivery notes for the solar panels.
> Photographs of the installed panels

Water Measures Construction Audit Requirements


RTW01 Dual Flush for Water Closets in > Photographs of installed water closet(s).
Bathrooms
> Purchase receipts and delivery note for water closet(s).

RTW02 Water-Efficient Urinals in all > Photographs of installed urinal(s).


Bathrooms
> Purchase receipts and delivery note for urinal(s).

RTW03 Aerators for Faucets/ Auto Shut-Off > On site test results by the auditor of the flow rate at the highest flow per minute, using a timer and a
Faucet measurement container. It is also recommended to use a pressure gauge to measure the water
pressure.
> Photographs of the installed faucet(s).
> Purchase receipts and delivery note for faucet(s) which includes make, model and auto shut-off
mechanism.

RTW04 Water-Efficient Faucets for Kitchen > On site test results by the auditor of the flow rate at the highest flow per minute, using a timer and a
Sinks measurement container. It is also recommended to use a pressure gauge to measure the water
pressure.
> Photographs of the installed faucet(s) or flow restrictor(s).
> Purchase receipts and delivery note for faucet(s) or flow restrictor(s).

Material Measures Construction Audit Requirements


RTM01 Floor Slabs > Date stamped photographs of floor slabs taken during or after construction; and
> Purchase receipt for the specified floor slab material; or
> Delivery notes.

Created By: Dairo Granados File Number: 19042910067086 EDGE Version : 2.1.5
Modified By: Dairo Granados Project No.: 1000488101 Date Time: 05-May-2019 16:19:24 10
RTM02 Roof Construction > Date stamped photograph of the roof taken during or after construction; and
> Purchase receipt for the building materials used for roof construction; or
> Delivery note for materials used for roof construction.

RTM03 External Walls > Date stamped photograph of the wall taken during or after construction; and
> Purchase receipt for the building materials used for wall construction; or
> Delivery note for materials used for wall construction.

RTM04 Internal Walls > Date stamped photograph of the wall taken during or after construction; and
> Purchase receipt for the building materials used for wall construction; or
> Delivery note for materials used for wall construction.

RTM05 Flooring > Date stamped photograph of the flooring once fitted; and
> Purchase receipt for the specified building materials used as a floor finish; or
> Delivery note for materials used for flooring.

RTM06 Window Frames > Date stamped photograph of the installed windows; and
> Purchase receipt for the specified window; or
> Delivery note for windows.

Created By: Dairo Granados File Number: 19042910067086 EDGE Version : 2.1.5
Modified By: Dairo Granados Project No.: 1000488101 Date Time: 05-May-2019 16:19:24 11

You might also like