PROJECT : ONE WILSON SQUARE

LOCATION : Wilson St. Cor. Ortigas Ave., Greenhills San Juan City DATE : FEBRUARY 09, 2018

SUBJECT : TURN OVER OF KEYS @ 9th floor unit A2, B, C, D, E1, F2 OWS - OO3

MASTER MASTER UTILITY


FLOOR / MAIN DOOR BEDROOM KEY BEDROOM COMMON T&B KEY ROOM REMARKS
UNIT KEY NO. KEY NO. T&B KEY NO.
NO. NO. KEY NO.

8F-C 43545 334646 516636 3344725 334673 242115 13PCS

***NOTHINGS FOLLOW***

Prepared by: Received by:

ENGR. JAYRINE AQUINO


Turn-over engineer Signature over printed name

Noted by:

ENGR. ERIC I. ABUTAR


Project manager
PROJECT : ONE WILSON SQUARE
LOCATION : Wilson St. Cor. Ortigas Ave., Greenhills San Juan City DATE : NOVEMBR 27, 2017

SUBJECT : TURN OVER OF KEYS @ 8th floor unit A2, E1, F2, J1 OWS - OO2

MASTER MASTER UTILITY


FLOOR / MAIN DOOR BEDROOM KEY BEDROOM COMMON T&B KEY ROOM REMARKS
UNIT KEY NO. KEY NO. T&B KEY NO.
NO. NO. KEY NO.

8F-A2 52112 334624 511266 1PAIR

8F-E1 45245 241574 242454 1PAIR

8F-F2 51236 237643 516742 1PAIR

8F-J1 15452 523355 477513 1PAIR


* * *NOTHINGS FOLLOW * * *

Prepared by: Received by:

ENGR. JAYRINE A. AQUINO Signature over printed name

Noted by:

ERIC I ABUTAR
38th floor unplaster wall Electrical room 38th floor auxilliary room

37th floor uplaster wall METER ROOM 36th Floor unfinish at door jamb METER R
33rd floor inc chb laying METER ROOM 33RD FLOOR no topping at flooring AUXIL
33RD FLOORunfinish plaster of wall ELECT. ROOM 32ND floor no topping Electrical room

31ST FLOOR unfinish firehost cabinet 31st floor unfinish plaster of wall ELECT. R
29TH FLOOR unfinish plastering ELECTRICAL ROOM 27TH FLOOR cutting of steel bar
unplaster wall 23rd AUXILLIARY ROOM rectify damage

22nd floor not quality plaster 21st floor unfinish work


19TH FLOOR unplaster wall AUXILLIARY ROOM 19TH UNTOPPING OF FLOORIG AUXILLIAR
r auxilliary room 36th floor untopping of flooring AUX ROOM

35th unfinish work ELECTRICAL ROOM


r unfinish at door jamb METER ROOM
OOR no topping at flooring AUXILLIARY RM 32nd unfinished work of firehost cabinet
or no topping Electrical room 31ST FLOOR unfinish firehost cabinet and jamb
perimeter of meter room

unfinish plaster of wall ELECT. ROOM 26th floor unplaster work METER ROOM
OR cutting of steel bar 26TH FLOOR UNTOPPING WORK ELECTRICAL ROOM
rectify 21st floor

r unfinish work 20th floor unfinish work ELECTRICAL ROOM


TOPPING OF FLOORIG AUXILLIARY ROOM
35th floor unfinish work at door jamb METER ROOM

34th unfinish work at door jamb METER ROOM


32nd floor unfinish plaster of wall METER ROOM
31st floor unfinish work, unplaster AUX ROOM

26TH FLLOR UNTOPPING WORK METER ROOM


rectify damage
rectify

20TH FLOOR unfinish work METER ROOM


For approval
Sample of DYNA BOLT
Φ16mmx100mm
STANDARD
By: C-E CONSTRUCTION
ONE WILSON SQUARE

For approval
Sample of Steel Plate
300mm diameter
100mm thk
By: C-E CONSTRUCTION
ONE WILSON SQUARE