Prepared By: Pennoni Asssociates, Inc. Date Prepared: March 19, 2002 By: KCH Chk'd: WBM/TFJ
PROJECT TITLE
PROJECT LOCATION (Bridge over Harvey Creek, City/Town, DE)
SUMMARY
Preliminary Cost Estimate for T.S.& L
Alternative No. 2: List Concrete Bridge Structure Type
Use $ / Square Foot for Concrete Box Segmental Bridges - This is for the entire bridge (1)
Note:
(1) List Sources for Estimate (ASBI unit prices, etc.)
(2) List key assumptions
(3) Derive Cost for non-standard items
Bridge Lighting (if used)
Metal Bridge Railing (if used)
Anti-Graffitti Coating
LS $1.00 1 $1.00 $1.00
LF $1.00 1 $1.00 $1.00
SY $1.00 1 $1.00 $1.00