You are on page 1of 8

Lifting Equipment Load test status

Frequency
Result Frequency
Testing Next SWL Test for Date of next
SN Plant/Location Equipment Description SWL(Kg) Test Date (Certified / for Proof Remarks
Center (TPA) Date Load(SWL) Proof test
Faulty) Load Testing
Testing

Over head beam c/w under Slung Electric


1 6300 28-May-15 ABS Certified 27-May-16 1 year 4 years 27-May-19 Satisfactory
Hoist (SN:HMY90516)/ Kone

Over head beam c/w under Slung Electric


PS

2 PS - 50 6300 28-May-15 ABS Certified 27-May-16 1 year 4 years 27-May-19 Satisfactory


Hoist (SN:HMY90515)/ Kone

Over head beam c/w under Slung Electric


3 3000 28-Jan-15 ABS Certified 27-Jan-16 1 year 4 years 27-Jan-19
Hoist (SN:1212303968)/ Kone

Runway beam c/w Manual Trolley and


PS

4 PS 52 500 16-Nov-15 GL Certified 16-Nov-16 1 year 4 years 16-Nov-19 Satisfactory


Chain Block (SN: GD 48132)

Runway beam c/w geared Trolley and


PS

5 PS 53 500 16-Nov-15 GL Certified 16-Nov-16 1 year 4 years 16-Nov-19 Satisfactory


Chain Block (SN: GD 48130)

Runway beam c/w geared Trolley and


PS

6 PS 54 1000 16-Nov-15 GL Certified 16-Nov-16 1 year 4 years 16-Nov-19 Satisfactory


Chain Block (SN: GD 63429)
Runway beam c/w Gear Trolley and
PS

7 PS - SB3 Electric Chain Hoist 500 16-Nov-15 GL Certified 16-Nov-16 1 year 4 years 16-Nov-19 Satisfactory
(SN:0826210609)
Runway beam c/w Gear Trolley and
PS

8 PS - SB4 Electric Chain Hoist 500 16-Nov-15 GL Certified 16-Nov-16 1 year 4 years 16-Nov-19 Satisfactory
(SN: 0826210601)

Runway beam c/w under Slung Electric


PS

9 PS - TBZ 500 24-Nov-15 GL Certified 24-Nov-16 1 year 4 years 24-Nov-19 Satisfactory


Hoist (SN: 0826210602)
Runway beam c/w geared Trolley &
PS

10 PS - UD1 Chain Block (SN:GD63050) Manually 500 16-Nov-15 GL Certified 16-Nov-16 1 year 4 years 16-Nov-19 Satisfactory
Operated
Not
PS

11 PS - 15 Not handed over by client 1 year 4 years


Available
Runway beam c/w geared Trolley and
PS

12 PS - 15/2 Chain Block (SN: GD 86144/BX127118)/ 500 14-Dec-15 GL Certified 14-Dec-16 1 year 4 years 14-Dec-19 Satisfactory
Morris

Runway beam c/w geared trolley (SN: GD


PS

13 PS - 15/3 500 14-Dec-15 GL Certified 14-Dec-16 1 year 4 years 14-Dec-19 Satisfactory


48135) Manually operated/ Morris

1 of 8 WBQ/F/143
Rev01 13th February 2012
Lifting Equipment Load test status
Frequency
Result Frequency
Testing Next SWL Test for Date of next
SN Plant/Location Equipment Description SWL(Kg) Test Date (Certified / for Proof Remarks
Center (TPA) Date Load(SWL) Proof test
Faulty) Load Testing
Testing

Over head beam c/w under Slung Electric


14 1500 18-Nov-14 Certified 18-Nov-15 1 year 4 years 18-Nov-18
wire rope Hoist (SN:1341207)/ Street

Runway beam c/w under Slung Electric


15 3000 18-Nov-14 Certified 18-Nov-15 1 year 4 years 18-Nov-18
wire rope Hoist (SN: )/ Street
PS

PS - 31
Over head under slung C/W manual Not
16 1000 1 year 4 years
trolley and chain block(SN:) Available

Over head under slung C/W manual


Not
17 trolley and chain 1000 1 year 4 years
Available
block(SN:GJ19592/KG19544) Morris

Runway beam c/w chain /(SN:)/ block


PS

18 PS - 29 1000 22-Dec-15 GL Certified 22-Dec-16 1 year 4 years 22-Dec-19 Satisfactory


and manual geard trolleyy/Pelloby

Single girder electric overhead travelling


PS

19 PS - 36 2000 22-Dec-15 GL Faulty 1 year 4 years Faulty


chain hoist(SN:426300)/ Morris

Chain Block& trolley (SN: GD 66221)


PS

20 PS - 35/1 1000 22-Dec-15 GL Certified 22-Dec-16 1 year 4 years 22-Dec-19 Satisfactory


Manually operated/Morris

Runway beam c/w under Slung Electric


PS

21 PS - 35/A 1000 22-Dec-15 GL Certified 22-Dec-16 1 year 4 years 22-Dec-19 Satisfactory


chain Hoist /(SN:DGL00103422)/ Morris

Chain Block& trolley (SN: GD 57377)


PS

22 PS - COT 1000 22-Dec-15 GL Certified 22-Dec-16 1 year 4 years 22-Dec-19 Satisfactory


Manually operated/Morris
Runway beam c/w geared Trolley and
PS

23 PS - 25/1 500 18-Jan-16 GL Certified 18-Jan-17 1 year 4 years 18-Jan-20 Satisfactory


Chain Block (SN: 27294)/ Hublast

Single girder overhead with electric chain


24 hoist(SN:66/93 AK725 DT100L8/2) 2500 18-Jan-16 GL Certified 18-Jan-17 1 year 4 years 18-Jan-20 Satisfactory
HADEF

Single girder overhead c/w geared trolley Faulty/no access


PS

25 PS - 27 1000 18-Jan-16 GL Faulty 1 year 4 years


and chain block(SN:31590-60-01)HADEF for test

Single girder overhead c/w geared trolley Faulty/no access


26 1000 18-Jan-16 GL Faulty 1 year 4 years
and chain block(SN:31590-60-02)HADEF for test

Runway beam C/W manual trolley and


PS

27 PS-27/3 Chain Block 500 26-Nov-15 GL Certified 26-Nov-16 1 year 4 years 26-Nov-19 Satisfactory
(S/no.GD/11965/BW020457)/Morris
Runway beam C/W geared manual trolley
PS

28 PS - 27/4 and Chain Block 500 26-Nov-15 GL Certified 26-Nov-16 1 year 4 years 26-Nov-19 Satisfactory
(S/no.GD41852/BW50639)/Morris

2 of 8 WBQ/F/143
Rev01 13th February 2012
Lifting Equipment Load test status
Frequency
Result Frequency
Testing Next SWL Test for Date of next
SN Plant/Location Equipment Description SWL(Kg) Test Date (Certified / for Proof Remarks
Center (TPA) Date Load(SWL) Proof test
Faulty) Load Testing
Testing

PS Runway beam C/W geared manual trolley


29 PS - 27/5 and Chain Block 500 26-Nov-15 GL Certified 26-Nov-16 1 year 4 years 26-Nov-19 Satisfactory
(S/no.GD41854/BW50641)/Morris
Runway beam C/W geared manual trolley
PS

30 PS - 27/6 and Chain Block 500 26-Nov-15 GL Certified 26-Nov-16 1 year 4 years 26-Nov-19 Satisfactory
(S/no.GD248139/BW51391)/Morris
Runway beam C/W geared manual trolley
PS

31 PS - 27/7 and Chain Block 500 26-Nov-15 GL Certified 26-Nov-16 1 year 4 years 26-Nov-19 Satisfactory
(S/no.GD26567/BW38399)/Morris
Runway beam C/W manual trolley and
PS

32 PS - 20/1 Chain Block (S/no.GD 500 7-Dec-15 GL Certified 7-Dec-16 1 year 4 years 7-Dec-19 Satisfactory
7331/BW6092)/Morris
Runway beam C/W manual trolley and
PS

33 PS - 20/2 Chain Block (S/no.GD 500 7-Dec-15 GL Certified 7-Dec-16 1 year 4 years 7-Dec-19 Satisfactory
11963/BW020455)/Morris

Runway beam C/W manual trolley and


PS

34 PS - 21/1 1000 7-Dec-15 GL Certified 7-Dec-16 1 year 4 years 7-Dec-19 Satisfactory


chain block (SN:GD 57375)/Morris

Runway beam c/w under Slung Electric


35 1000 10-Feb-16 GL Faulty 1 year 4 years Faulty
Hoist /(SN:04693964F10001)/ SWF

Overhead beam c/w under Slung Electric


36 1000 10-Feb-16 GL Faulty 1 year 4 years Faulty
PS

PS - 10 Hoist (SN:04693924F10001)/ SWF

Overhead beam c/w under Slung Electric


37 1000 10-Feb-16 GL Faulty 1 year 4 years Faulty
Hoist (SN:04693944F10001)/ SWF

Swing jib davit flor mounted with chain


PS

38 PS - MOI 300 23-Dec-15 GL Certified 23-Dec-16 1 year 4 years 23-Dec-19 Satisfactory


block (SN: GD 64676)/ Morris

Runway beam c/w under Slung Electric


39 3000 15-Dec-13 ABS Certified 14-Dec-14 1 year 4 years 14-Dec-17
Hoist (SN: 1237310937)/ KONE

Over head beam c/w under Slung


40 3000 15-Dec-13 ABS Certified 14-Dec-14 1 year 4 years 14-Dec-17
PS

PS - 5 Electric Hoist (SN: 1237310936)/ KONE

Runway beam c/w under Slung Electric


41 3000 15-Dec-13 ABS Certified 14-Dec-14 1 year 4 years 14-Dec-17
Hoist (SN: HMY94086)/ KONE

3 of 8 WBQ/F/143
Rev01 13th February 2012
Lifting Equipment Load test status
Frequency
Result Frequency
Testing Next SWL Test for Date of next
SN Plant/Location Equipment Description SWL(Kg) Test Date (Certified / for Proof Remarks
Center (TPA) Date Load(SWL) Proof test
Faulty) Load Testing
Testing

Runway beam c/w under Slung Electric


42 1000 4-Jun-06 4-Jun-07 1 year 4 years
Hoist (SN: )SWF

Runway beam c/w under Slung Electric


43 3000 19-Dec-13 ABS Certified 18-Dec-14 1 year 4 years 18-Dec-17
PS

PS - 6 Hoist (SN: HMY94107)/ KONE

Overhead single girder travelling cran


44 with Electric Hoist (SN: 1237310875)/ 3000 22-Dec-13 ABS Certified 21-Dec-14 1 year 4 years 21-Dec-17
KONE
Runway beam C/W manual trolley and
PS

45 PS - 30/1 Chain Block (S/no.GA 500 7-Dec-15 GL Certified 7-Dec-16 1 year 4 years 7-Dec-19 Satisfactory
0538/GV5582)/Morris

Runway beam C/W manual trolley and


PS

46 PS - 30/2 1000 7-Dec-15 GL Certified 7-Dec-16 1 year 4 years 7-Dec-19 Satisfactory


electric chain hoist (SN:GD 57374)/Street

Monorail with electric chain


47 1000 10-Feb-16 GL Faulty 1 year 4 years Faulty
hoist(SN:04693894F10001)
PS

PS - 11
Single girder overhead with electric chain
48 1000 10-Feb-16 GL Faulty 1 year 4 years Faulty
hoist(SN:04693954F10001)

Single girder underslung Over head


49 5000 1-Jul-13 ABS Certified 30-Jun-14 1 year 4 years 30-Jun-17
Electric Hoist (SN:12537310817)/ Kone

Single girder underslung Over head


50 5000 2-Jul-13 ABS Certified 1-Jul-14 1 year 4 years 1-Jul-17
Electric Hoist (SN: 12537310823)/ Kone
PS

PS - 30
Monorail beam c/w electric Chain hoist
51 3000 3-Jul-13 ABS Certified 2-Jul-14 1 year 4 years 2-Jul-17
with trolley (SN: 1237310818) /Kone

Double girder top running electric over


52 5000 21-May-13 ABS Certified 20-May-14 1 year 4 years 20-May-17
head craneSN: HMY94232)/Kone

Over head beam c/w under Slung Electric


53 3000 12-Jan-16 GL Certified 12-Jan-17 1 year 4 years 12-Jan-20 Satisfactory
Hoist (SN:)/
Single beam under slung over head crane
54 c/w Trolley & Chain Block (SN:) Manually 1500 13-Jan-16 GL Certified 13-Jan-17 1 year 4 years 13-Jan-20 Satisfactory
operated/Morris
Single beam under slung over head crane
Faulty/no access
55 c/w Trolley & Chain Block (SN:GE05157) 1500 13-Jan-16 GL Faulty 1 year 4 years
PS

PS - 3 for test
Manually operated/Morris
Single beam under slung over head crane
56 c/w Trolley & Chain Block (SN:GE0555) 1500 13-Jan-16 GL Certified 13-Jan-17 1 year 4 years 13-Jan-20 Satisfactory
Manually operated/Morris

57 Manual Winch(SN:ABS0208) 100 13-Jan-16 GL Certified 13-Jan-17 1 year 4 years 13-Jan-20 Satisfactory

4 of 8 WBQ/F/143
Rev01 13th February 2012
Lifting Equipment Load test status
Frequency
Result Frequency
Testing Next SWL Test for Date of next
SN Plant/Location Equipment Description SWL(Kg) Test Date (Certified / for Proof Remarks
Center (TPA) Date Load(SWL) Proof test
Faulty) Load Testing
Testing

PS Single girder overhead c/w electric chain


58 PS - 3/1 1000 29-Jan-15 Certified 29-Jan-16 1 year 4 years 29-Jan-19
hoist(SN:)13374.01/Street

Over head beam c/w under Slung Electric


59 3000 2-Feb-15 ABS Certified 1-Feb-16 1 year 4 years 1-Feb-19
Hoist (SN:1248313917)/ Kone

Monorail beam c/w under Slung Electric


PS

60 PS - 17 3000 2-Feb-15 ABS Certified 1-Feb-16 1 year 4 years 1-Feb-19


wire rope Hoist (SN:HMY96762)/ Kone

Over head beam c/w under Slung Electric


61 3000 2-Feb-15 ABS Certified 1-Feb-16 1 year 4 years 1-Feb-19
Hoist (SN:1248313918)/ Kone

Runway beam c/w Chain Block/trolley


PS

62 PS-17/1 (SN: GD 69335/BX134223) Manually 500 23-Dec-15 GL Certified 23-Dec-16 1 year 4 years 23-Dec-19 Satisfactory
operated/Morris

Runway beam c/w Chain Block/trolley


PS

63 PS-17/2 500 23-Dec-15 GL Certified 23-Dec-16 1 year 4 years 23-Dec-19 Satisfactory


(SN:GD 41849) Manually operated/Morris

Runway beam c/w Chain Block/trolley


PS

64 PS-17/3 (SN:GD 41855/BW50642) Manually 500 23-Dec-15 GL Certified 23-Dec-16 1 year 4 years 23-Dec-19 Satisfactory
operated/Morris

Not
PS

65 PS - 17/4 Not handed over by client 1 year 4 years


Available

Double girder Over head cranewith


66 electric wire rope Hoist 5000 9-Mar-15 VELOSI Certified 9-Mar-16 1 year 4 years 19-Jan-18 Satisfactory
(SN:QAT/C/2475/HMY96702)/ Kone

Over head beam c/w under Slung Electric


67 Hoist (SN:QAT/C/2498/1248313924)/ 5000 9-Mar-15 VELOSI Certified 9-Mar-16 1 year 4 years 20-Jan-17 Satisfactory
Kone
PS

PS - 40
Single girder Over head beam c/w
68 Electric chain Hoist 5000 9-Mar-15 VELOSI Certified 9-Mar-16 1 year 4 years 20-Jan-17 Satisfactory
(SN:QAT/C/2499/1248313923)/ Kone

Monorail beam c/w Electric chain with


69 3000 25-Jan-15 ABS Certified 24-Jan-16 1 year 4 years 24-Jan-19
trolley Hoist (SN:1248313916)/ Kone

Chain Block& geared trolley (SN:


PS

70 PS - 40/1 500 24-Nov-15 GL Certified 24-Nov-16 1 year 4 years 24-Nov-19 Satisfactory


BV1604/) Manually operated/Morris

Chain Block& geared trolley (SN: GD


Faulty-Runway
PS

71 PS - 40/2 53035/BX009810) Manually 500 24-Nov-15 GL Faulty 1 year 4 years


beam twisted
operated/Morris

5 of 8 WBQ/F/143
Rev01 13th February 2012
Lifting Equipment Load test status
Frequency
Result Frequency
Testing Next SWL Test for Date of next
SN Plant/Location Equipment Description SWL(Kg) Test Date (Certified / for Proof Remarks
Center (TPA) Date Load(SWL) Proof test
Faulty) Load Testing
Testing

PS Runway beam c/w chain block& geared


72 PS - 40A trolley (SN:GD563488/BX129474 )/ 1000 24-Nov-15 GL Certified 24-Nov-16 1 year 4 years 24-Nov-19 Satisfactory
Morris

Runway beam c/w Chain Block & geared


PS

73 PS - 41 1000 24-Nov-15 GL Certified 24-Nov-16 1 year 4 years 24-Nov-19 Satisfactory


trolley (SN: GD 26840/BW32315)/Morris
PS

74 PS - NDIA2 A frame with chain block 300 7-Jan-16 GL Certified 7-Jan-17 1 year 4 years 7-Jan-20 Satisfactory

Runway beam c/w electric chain hoist


PS

75 PS -2 1000 7-Jun-15 Certified 7-Jun-16 1 year 4 years 7-Jun-19 Satisfactory


(SN:1403200228 )/ Kone

76 Runway beam c/w electric wire rope hoist 1000 7-Jun-15 Certified 7-Jun-16 1 year 4 years 7-Jun-19 Satisfactory
PS

PS - 7 Runway beam c/w Chain Block & geared Not


77 1000 1 year 4 years
trolley (SN:)/Morris Available
Runway beam c/w Chain Block & geared Not
78 1000 1 year 4 years
trolley (SN: CD 3478)/Morris Available
Runway beam c/w under Slung Electric
79 1000 6-Jan-16 GL Faulty 1 year 4 years Faulty
wire rope Hoist (SN:36441A )/ Morris
PS

PS-8
Single beam under slung over head crane
80 c/w Trolley & Chain Block (SN: GD 1000 6-Jan-16 GL Faulty 1 year 4 years Faulty
63485/63486/ Morris

Not
PS

81 PS-8/1 Not handed over by client 1 year 4 years


Available

Chain Block with geared trolley (SN: GD


PS

82 PS-8/4 40972)/BW48809 Manually 500 6-Jan-16 GL Certified 6-Jan-17 1 year 4 years 6-Jan-20 Satisfactory
operated/Morris

Runway beam C/W manual trolley and


PS

83 PS-8/5A 1500 12-Jan-16 GL Certified 12-Jan-17 1 year 4 years 12-Jan-20 Satisfactory


chain block (SN:)/Toyo

Runway beam C/W manual trolley and


PS

84 PS-8/5B 1500 12-Jan-16 GL Certified 12-Jan-17 1 year 4 years 12-Jan-20 Satisfactory


chain block (SN:07103066)/Toyo

Runway beam C/W manual trolley and


PS

85 PS-8/6 chain block (SN:GD 500 6-Jan-16 GL Certified 6-Jan-17 1 year 4 years 6-Jan-20 Satisfactory
83138/127112)/Morris

Runway beam C/W manual trolley and


PS

86 PS-8/7A 1500 12-Jan-16 GL Certified 12-Jan-17 1 year 4 years 12-Jan-20 Satisfactory


chain block (SN:07102660)/Toyo

6 of 8 WBQ/F/143
Rev01 13th February 2012
Lifting Equipment Load test status
Frequency
Result Frequency
Testing Next SWL Test for Date of next
SN Plant/Location Equipment Description SWL(Kg) Test Date (Certified / for Proof Remarks
Center (TPA) Date Load(SWL) Proof test
Faulty) Load Testing
Testing

PS
87 PS-8/8 Davit with chain block(SN:07102570) 500 6-Jan-16 GL Faulty 1 year 4 years Faulty

Over head beam c/w under Slung Electric


88 6300 10-Mar-15 VELOSI Certified 10-Mar-16 1 year 4 years 24-Nov-17 Satisfactory
Hoist (SN:HMY96781)/ KONE
PS

PS - W1
Over head beam c/w geared Trolley and
89 6300 10-Mar-15 VELOSI Certified 10-Mar-16 1 year 4 years 20-Oct-17 Satisfactory
Chain Block (SN: HMY96780)/ KONE

Runway beam c/w under Slung Electric


PS

90 PS - W2 1000 25-May-15 BV Faulty 1 year 4 years Faulty


Hoist (SN:61751306)/ Demag

Runway beam c/w under Slung Electric


PS

91 PS - W3 750 25-May-15 BV Faulty 1 year 4 years Faulty


Hoist (SN:0920303214)/ Morris

Runway beam c/w trolley mounted


PS

92 PS - W5 electric hoist (SN:1100004028)Manually 500 25-May-15 BV Faulty 1 year 4 years Faulty


operated

Chain Block& trolley (SN: GD 71434)


PS

93 PS - W6 500 25-May-15 BV Faulty 1 year 4 years Faulty


Manually operated/Morris

Runway beam c/w under Slung Electric


PS

94 PS - W7 1000 25-May-15 BV Faulty 1 year 4 years Faulty


Hoist (SN:61751329)/ Demag

Runway beam c/w gearedTrolley and


PS

95 PS - W12 500 25-May-15 BV Faulty 1 year 4 years Faulty


Chain Block (SN: )/ Morris

Runway beam c/w under Slung Electric


PS

96 PS - WH 750 25-May-15 BV Faulty 1 year 4 years Faulty


Hoist (SN:1039310525)/ Morris

Single girder over head c/w electric chain Not tested/site


PS

97 PS - HUP 1500 5-Aug-13 BV 5-Aug-14 1 year 4 years 5-Aug-17


hoist(SN:)Street constraint

Double girder Over head crane with


98 electric wire rope hoist (SN:32-3945)/ 5000 23-Feb-16 GL Certified 23-Feb-17 1 year 4 years 23-Feb-20 Satisfactory
Morris
PS

PS - SW3
Faulty/davit
99 Davit socket mounted 125 23-Feb-16 GL Faulty 1 year 4 years
foundation cracks

Runway beam c/w electric chain hoist


PS

100 PS - SW4 2000 23-Feb-16 GL Certified 23-Feb-17 1 year 4 years 23-Feb-20 Satisfactory
(SN: )/ Street

7 of 8 WBQ/F/143
Rev01 13th February 2012
Lifting Equipment Load test status
Frequency
Result Frequency
Testing Next SWL Test for Date of next
SN Plant/Location Equipment Description SWL(Kg) Test Date (Certified / for Proof Remarks
Center (TPA) Date Load(SWL) Proof test
Faulty) Load Testing
Testing

Double girder top running electric over


PS
101 PS - SW8 5000 23-Feb-16 GL Certified 23-Feb-17 1 year 4 years 23-Feb-20 Satisfactory
head craneSN: HHY48448)/Morris

Runway beam c/w geared Trolley and


102 1000 14-Dec-15 GL Certified 14-Dec-16 1 year 4 years 14-Dec-19 Satisfactory
Chain Block (SN5684-8: )/ Hadef

Runway beam c/w Electric hoist (SN: 12-


PS

103 PS - GIC 2500 14-Dec-15 GL Certified 14-Dec-16 1 year 4 years 14-Dec-19 Satisfactory
306125)/Morris

104 Davit 375 14-Dec-15 GL Certified 14-Dec-16 1 year 4 years 14-Dec-19 Satisfactory

Over head beam c/w under Slung Electric


PS

105 PS - OBK 1000 22-Jan-15 VELOSI Certified 22-Jan-16 1 year 4 years 22-Jan-19
Hoist (SN:0807302365)/ Morris

Single girder overhead crane with


106 electric chain 2000 17-Feb-15 VELOSI Certified 17-Feb-16 1 year 4 years 17-Feb-19 Satisfactory
hoist(SN:1105301648)Morris
PS

PS - RUP
Monorail with electric wire rope
107 3000 14-Oct-14 14-Oct-15 1 year 4 years 14-Oct-18
hoist(SN:)/Morris
Single girder overhead with electric chain
PS

108 PS - JUP 1000 6-Apr-15 VELOSI Certified 6-Apr-16 1 year 4 years 6-Apr-19 Satisfactory
Hoist(SN:0807302362)/morris

Runway Beam c/w Chain Block Morris


PS

109 PS - AD2A (S/no. GJ 18273) & trolley 1000 18-Nov-15 GL Certified 18-Nov-16 1 year 4 years 18-Nov-19 Satisfactory
(S/no.KC014471)
Runway Beam c/w Chain Block Liftingear
PS

110 PS - AD2B (S/no. 13052302) & Geared trolley 1000 18-Nov-15 GL Certified 18-Nov-16 1 year 4 years 18-Nov-19 Satisfactory
(S/no.KC014473)
Run way beam c/w manual trolley & chain
PS

111 PS - AD1 1000 18-Nov-15 GL Certified 18-Nov-16 1 year 4 years 18-Nov-19 Satisfactory
block (SN:GD42507)

Run way beam c/w Manual Trolley &


PS

112 PS - AD2 1000 18-Nov-15 GL Certified 18-Nov-16 1 year 4 years 18-Nov-19 Satisfactory
Chain Block (SN:13052329)

Faulty

Tested & certified

Under Defect liability

8 of 8 WBQ/F/143