DESIGN PROBLEM NO.

TITLE AND GENERAL DESCRIPTION

Vista Group of company decided to put 50 storey mixed used building located at
Taft Avenue, Manila on a very high intensity commercial zone with a 6-basement
component, A mixed used type of building structure having complete commercial
facilities within the Podium structure and an office and residential spaces on top
of it. The 5 level is for shopping mall with hypermarket and the condominium
type of residential units will be on top of the eighteen (18) level of rentable office
space. The administrative facilities as well as the main utility system of the
structure are located within the lower ground floor where the supermarket is
located. The basement level considers 3.0 meter floor to floor height distance,
the commercial level considers 3.5 meter floor to floor height distance, while the
office and residential should have 3.0 meters floor to floor height distance.
B. PROJECT SITE FEATURES

The 25,000 Total Lot Area (TLA) is rectangular and is a corner lot with 100
meters wide frontage that is facing south. It is located along a twenty (20.0) m
wide street (RROW) and a minor road of fourteen (14.0) meters right of way
(RROW) facing east. The minor road sloping downward by 3% slope from the
elevation of the front ground line (I6.0 meters elevation) @ south east
property line NOTE: the ground level is the same elevation of the front ground
line.
C. DESIGN OBJECTIVES:

1. To design a mixture structure with an advance technology and modern trend


of architecture should be considered in design configuration.
2. The project should consider automation system for security and premises,
3. The project will be consider centralized air-conditioning system within the
commercial facilities and the office while having option on residential of using
split type or window type.
4. The project will consider longer span on commercial level while the office and
residential have an 8 meter module.
1. Based on the given data of the project, how much is the Allowable
Maximum Building Footprint (AMBF)?
a. 22,599 sqm c. 22,264 sqm
b. 23,599 sqm d. 23,000 sqm
1. Based on the given data of the project, how much is the Allowable
Maximum Building Footprint (AMBF)?
a. 22,599 sqm c. 22,264 sqm
b. 23,599 sqm d. 23,000 sqm
2. Based on PD1096, how much is the Percentage of Site Occupancy (PSO) of
the project without firewall?
a. 80% of TLA c. 90% of TLA
b. 70% of TLA d. 20% of TLA
2. Based on PD1096, how much is the Percentage of Site Occupancy (PSO) of
the project without firewall?
a. 80% of TLA c. 90% of TLA
b. 70% of TLA d. 20% of TLA
3. Based on PD1096, how much is the maximum allowable impervious
surface area (ISA) of the project without firewall?
a. 20,000 sqm c. 3750 sqm
b. 17,000 sqm d. 1250 sqm
3. Based on PD1096, how much is the maximum allowable impervious
surface area (ISA) of the project without firewall?
a. 20,000 sqm c. 3750 sqm
b. 17,000 sqm d. 1250 sqm
4. Based on PD1096 how much is the percentage of maximum allowable
impervious area (ISA) of the project with firewall?
a. 15% c. 5%
b. 10% d. 80%
4. Based on PD1096 how much is the percentage of maximum allowable
impervious area (ISA) of the project with firewall?
a. 15% c. 5%
b. 10% d. 80%
5. What is the Zoning Classification of the development?
a. C1 c. C2
b. C3 d. C4
5. What is the Zoning Classification of the development?
a. C1 c. C2
b. C3 d. C4
6. Based on PD1096 what is the total MACA of the project without firewall?
a. 22,500 sqm c. 23,750 sqm
b. 23,500 sqm d. 22,750 sqm
6. Based on PD1096 what is the total MACA of the project without firewall?
a. 22,500 sqm c. 23,750 sqm
b. 23,500 sqm d. 22,750 sqm
7. Based on PD1096, what is the total MACA of the project with firewall?
a. 22,500 sqm c. 23,750 sqm
b. 23,500 sqm d. 22,750 sqm
7. Based on PD1096, what is the total MACA of the project with firewall?
a. 22,500 sqm c. 23,750 sqm
b. 23,500 sqm d. 22,750 sqm
8. Based on PD1096, what is the USA of the project with firewall?
a. 1250 sqm c. 500 sqm
b. 750 sqm d. 1200 sqm
8. Based on PD1096, what is the USA of the project with firewall?
a. 1250 sqm c. 500 sqm
b. 750 sqm d. 1200 sqm
9. Based on PD1096, what is the USA of the project without firewall?
a. 1250 sqm c. 500 sqm
b. 750 sqm d. 1200 sqm
9. Based on PD1096, what is the USA of the project without firewall?
a. 1250 sqm c. 500 sqm
b. 750 sqm d. 1200 sqm
10. Based on PD1096, what is the Total Open Space within Lot (TOSL) of the
project?
a. 5100 sqm c. 5550 sqm
b.5125 sqm d. 5000 sqm
10. Based on PD1096, what is the Total Open Space within Lot (TOSL) of the
project?
a. 5100 sqm c. 5550 sqm
b.5125 sqm d. 5000 sqm
11. What is the minimum front setback of the project of the RROW is 30.00 m?
a. 8.00 m c. 4.00 m
b. 6.00 m d. 2.00 m
11. What is the minimum front setback of the project of the RROW is 30.00 m?
a. 8.00 m c. 4.00 m
b. 6.00 m d. 2.00 m
12. What is the minimum rear setback of the project if the RROW is 22.00 m?
a. 3.00 m c. 4.00 m
b. 6.00 d. 2.00 m
12. What is the minimum rear setback of the project if the RROW is 22.00 m?
a. 3.00 m c. 4.00 m
b. 6.00 d. 2.00 m
13. Based on PD1096, to satisfy natural light & ventilation requirements along
RROW and front yards. What is the angle of angular plane for structure
without projections of the project if the RROW is 20.00 meters?
a. 61 degrees c. 60 degrees
b. 63.6 degrees d. 68.0 degrees
13. Based on PD1096, to satisfy natural light & ventilation requirements along
RROW and front yards. What is the angle of angular plane for structure without
projections of the project if the RROW is 20.00 meters?
a. 61 degrees c. 60 degrees
b. 63.6 degrees d. 68.0 degrees
14. Based on PD1096, to satisfy natural light & ventilation requirements along
RROW and front yards. What is the angle of angular plane for structure without
projections of the project if the RROW is 14.00 meters?
a. 60 degrees c. 65.5 degrees
b. 63.6 degrees d. 61.7 degrees
14. Based on PD1096, to satisfy natural light & ventilation requirements along
RROW and front yards. What is
the angle of angular plane for structure without projections of the project the
RROW is 14.00 meters?
a. 60 degrees c. 65.5 degrees
b. 63.6 degrees d. 61.7 degrees
15. Based on PD1096, under Rule VIII, what is the minimum percentage of open
space by occupancy type of the project for proposed development with
firewalls?
a, 80 % c. 90%
b. 30% d. 75%
15. Based on PD1096, under Rule VIII, what is the minimum percentage of open
space by occupancy type of the project for proposed development with
firewalls?
a, 80 % c. 90%
b. 30% d. 75%