G0-L0AS-7A20120-101-A

To: Hong Phong 1 Energy Joint Stock Company

Technical Specification

1500V 5.1MVA SOLAR WARE STATION


(for Manufacturing)

HONG PHONG 1A SOLAR POWER PLANT


G0-L0AS-7A20120-101-A

Toshiba Mitsubishi-Electric Industrial Systems Corporation


Technology Marketing Team
Global Renewable Energy Business Unit
Renewable Energy & New Technology Division

1
TMEIC Confidential
G0-L0AS-7A20120-101-A

General specification

This specification describes the general data of the proposed 1500V 5.1MVA SOLAR WARE
STATION (SOLAR WARE STATION) utilized TMEIC’s large scale PV inverter, type PVH-L2550E.

The detail specifications of the SOLAR WARE STATION are describes in other documents. The
reference numbers of them can be found below.

1. Project Name: HONG PHONG 1A SOLAR POWER PLANT


2. Capacity: ■ 5.1MW/5.1MVA
3. Type of inverter: ■ PVH-L2550E (input: 1500Vdc, output: 2550kW/2550kVA)
4. Numbers of Station:

Type of Station Inverters Qty

5.1MW/5.1MVA station 2 sets of PVH-L2550E 30

5. AC Frequency: ■ 50Hz / □ 60Hz


6. AC nominal voltage: □ 11kV / ■ 22kV/ □ 34.5kV /(□ Other: kV)
7. Type of MV switchgear (RMU): ■ 2L+V(Circuit Breaker) / □ 2L+P(Fuse)
8. Auxiliary Transformer : ■ Standard 10kVA / □ Non Standard ... capacity: __ kVA
9. UPS: □ No / ■ Yes
10. DC input monitoring: □ No / ■ Yes (sensor per input)
11. Night Var Compensator : ■ No / □ Yes
12. Negative Grounding: □ No / ■ Yes
13. Insulation monitoring: □ No / ■ Yes
14. RMU
I. RMU remote on/off: □ No / ■ Yes
II. Short Circuit current: 20kA(3s): □ No / ■ Yes

2
TMEIC Confidential
G0-L0AS-7A20120-101-A

1. General

1-1. Technical specification of SOLAR WARE STATION

This electrical equipment technical specification describes our proposed 1500V 5.1MVA SOLAR
WARE STATION with PVH-L2550E Inverter for photovoltaic power plant.

Table 1 lists the scope of SOLAR WARE STATION. Please refer to attachment A for the single line
diagram. All the necessary cables, cabling works within SOLAR WARE STATION and
commissioning works are included in this proposal.

Table 1 BOM of 1500V 5.1MVA SOLAR WARE STATION with PVH-L2550E

No. Item Description Qty Section

1 Package ISO standard size 40’HC container 1pc Section 2-1

2 PVH-L2550E 2550kW/2550kVA inverter (including DC box) 2pcs Section 2-2

Three-phase, 50Hz, Dy11y11, 5.1MVA


3 MV transformer 1pc Section 2-3
630V-630V, 22kV

4 MV Switchgear 50Hz, 22kV, 630A, 2L+V(Circuit Breaker) 1pc Section 2-4

Low voltage distribution panels, outlets(Type depends on Refer to


5 LV panels 1set
the requirements) Attachment A
Connection / cabling between LV panels, Inverter, MV
6 Cables 1set Section 2-1
transformer and MV Switchgear is included
Ventilation
7 Louvers, inverter fans, exhaust fan and filters 1set Section 2-6
Systems
Auxiliary
8 Three-phase, 50Hz, Dyn11, 10kVA, 220V 1pc -
transformer

9 Lighting Lamps fitted with light bulbs and emergency light 1set -

Safety
10 Gloves, insulated stool 1set -
equipment

11 UPS 300W_8mins, 220Vac, 50Hz 1 set

Note: Fire alarm systems (smoke detector, heat detector, control box, fire distinguisher, etc.) are out of
TMEIC’s scope. Cable and cable duct inside of container are TMEIC’s scope.

3
TMEIC Confidential
G0-L0AS-7A20120-101-A

1-2. Installation and Operation Environment

When installing or operating the SOLAR WARE STATION and related devices, ensure that the
installation and operation environment complies with Table 2.
Failing to observe these standards may deteriorate insulation, causing short life and malfunctions.
Before installation, measure and evaluate the environment of the installing location. If the standards
are not satisfied, it is recommended to take necessary action before installing or operating the
SOLAR WARE STATION. The SOLAR WARE STATION must be protected from marine
environment and must be sealed from corrosive gas and salty air in accordance with Table 2.

Table 2 Power Conditioning System installation and operation environment

No. Item Environment standard

1 Installation location Outdoor


o o
-20 C to +45 C
2 Ambient temperature range
Temperature rise in container shall be within 5 ℃.

3 Relative humidity The relative humidity must be held between 15 and 95%.

4 Altitude Up to 1000 m above sea level. 2000m as an option

5 Vibration Static acceleration 1.0G (Horizontal)

6 IP IP54 (Equivalent)

7 Salt Area No Salt area (More than 10km away from sea.)

8 Flammability There should be no inflammable/explosive gas.

1500mm for left and right, 1000mm for front and rear.
9 Maintenance space
Refer to section 4-1.

4
TMEIC Confidential
G0-L0AS-7A20120-101-A

2. Specification of the equipment

2-1. SOLAR WARE STATION

The SOLAR WARE Station is a fully integrated 5.1MVA power station. It is designed based on the
principle of “plug and play”, The inverter, Transformer, RMU and the auxiliary equipment are all
integrated, installed, tested and shipped as a complete unit.

The system consists of an ISO standard size 40ft High Cube container with an external dimension
of 12m x 2.4m x 2.8m. The inside of the container and the layout are shown in Figure 1(for
reference) and attachment A-3.
Cable entry is from the bottom of the container (refer to attachment B.).

RMU (IP3XC)
Transformer
Inverter (IP21)

Inverter (IP21)

Container (IP 54)

Figure 1. Layout of 5.1MW SOLAR WARE STATION (For reference)

Please refer to the Single Line Diagram in attachment A-1/2.

5
TMEIC Confidential
G0-L0AS-7A20120-101-A

Control Circuit for supplied equipment


SLD is shown in attachment A.

Communication Wiring
- Communication cabling in SOLAR WARE STATION is not included.
- (Optical) cable to the outside of SOLAR WARE STATION is not included.
- TMEIC provide control, signal cable from RMU, Transformer, Inverter to RTU panel as per M-JGC-
JVC-TMEIC-FRA-0003(10-May)

Cable
Cable and cabling work for outside of the SOLAR WARE STATION is not included.
-Both DC and AC cable entry of inverter are bottom entry.
-Cable and cabling work from PV panels to Inverter is not included.
-Cable and cabling work from SWGR to High voltage system is not included.

DC cable termination details are shown in Figure 2.

Figure 2. DC cable termination drawing

Customer Furnished Equipment (CFE)


SCADA, DAS and site data controller are not the scope of supply.

Stairs and Safety Railings


If the package(s) are to be mounted on piers requiring stairs and safety railings, the stairs and
safety railings are not scope of supply and should be supplied by others.

Cooling Method
Forced air cooling.

6
TMEIC Confidential
G0-L0AS-7A20120-101-A

2-2. Inverter and DC box

2 sets of PVH-L2550E inverter are integrated in SOLAR WARE STATION. Refer to Technical
Specifications of PVH-L2550E.
DC-Box is integrated in each PV inverter. Number of input is 16 inputs as standard.

2-3. MV 3-Phase Transformer

Specification of transformer for PVH-L2550E is described in below Table 3.

Table 3 Transformer for PVH-L2550E

No. Items Specification

1 Standard IEC60076

2 Rated Voltage 22kV

3 Rated Frequency 50Hz


o
4 Ambient Temperature Max 45 C.

5 Number of phases 3

6 Number of winding 3

7 kVA 5100/2550/2550kVA

8 Vector group symbol Dy11y11

9 Cooling Class ONAN


Mineral oils (biodegradable oil can be supplied as an optio
10 Insulating fluid
n)
11 Low Voltage 630-630V

12 Tap changer (off circuit) HV : +/-2x2.5%

13 Impedance Minimum 5.75±7.5%

14 Power frequency withstand voltage HV : 50kV LV : 3kV

15 Lightning impulse withstand voltage HV : 125kV

16 Temperature Rise Oil 55 deg. C, Winding 60 deg. C

17 Winding material Aluminum


Designed for operation at 1000 m above sea level
18 Elevation
(Over 1000m above sea level can be supplied as an option)
19 Corrosivity category C3

7
TMEIC Confidential
G0-L0AS-7A20120-101-A

2-4. MV Switchgear

Specification of switchgears is described in below table 4.

Table 4 Switchgear specification

No. Items Specifications

1 Standard IEC62271-200
3 Rated voltage 22kV
o
4 Ambient temperature -5 to 45 C
5 Type 2L+V (Breaker).

6 Power frequency withstand voltage 50kV


7 Lightning impulse withstand voltage 145kV
8 Rated currents 630A.
9 Short Circuit current 20kA(3s)
10 Rated frequency 50Hz
IP65 (Medium voltage compartment)
11 Protection Index IP3XC (Operating mechanism compartment)
IP3XC (Cable compartment)

① VCB
② 3 position disconnector
③ 3 position switch disconnector
④ Voltage indicator
⑤ Self power protection relay
⑥ CT Ring type
⑦ ZCT

① ⑤
③ ③

④ ④ ④

Figure 3. Single line diagram

8
TMEIC Confidential
G0-L0AS-7A20120-101-A

Interface within SOLAR WARE STATION

Figure 5. Interface within SOLAR WARE STATION for reference


(SCADA system and wiring is out of TMEIC’s scope)

Table 6 Signal interface


No. From Signal description To Signal type
Inverter status
Active energy
Active power P
Reactive power Q
Power factor
Grid frequency
Inverter1 / Grid voltage RTU Modbus / TCP
1
Inverter2 Inverter output current
DC input power
DC input voltage
DC input current
Alarms
Other
DC input monitoring RTU Modbus / TCP
OTI Alarm
Oil Level Low Alarm
2 Transformer RTU I/O signal (Alarm / Trip)
Buchholz Relay Alarm
Pressure Release Trip
OTI Trip
Oil level Low Trip
3 Transformer RMU I/O signal (Trip)
Buchholz Relay Trip
Pressure Release rip

9
TMEIC Confidential
G0-L0AS-7A20120-101-A

LBS1 Earthing ON
LBS1 ON
LBS1 remote
LBS2 Earthing ON
LBS2 ON
RTU I/O signal (Status)
LBS2 remote
4 RMU CB ON
CB remote
LS Earthing ON
LS ON
50/51 Trip RMU
Protectio I/O signal (Trip)
50/51G Trip n relay
SF6 Gas Alarm RTU I/O signal (Alarm)
LBS1 OPEN
LBS1 CLOSE
LBS2 OPEN
5 RTU RMU I/O signal (ON/OFF command)
LBS2 CLOSE
CB OPEN
CB CLOSE
6 Inverter station LV room temperature alarm RTU I/O signal (Alarm)
Smoke detector1 Smoke Alarm (Alarm)
7 Smoke detector2 Smoke Alarm Fire (Alarm)
Control
Smoke detector3 Smoke Alarm (Alarm)
box
8 Heat detector Heat Alarm (Alarm)

10
TMEIC Confidential
G0-L0AS-7A20120-101-A

3. COMMISSIONING

A Certified Field Engineer will perform all startup and commissioning services for SOLAR WARE
STATION.

Notes:
 Both cold commission and hot commissioning schedule have to be conduct according to the
agreed schedule with TMEIC and Client in advance.
 Both cold and hot commissioning is based on assumption that DC generators and AC side
are ready to be synchronized.
 Cold Commissioning : (For Package)
 TMEIC’s activity to set up the provided solution properly in order for the client to
terminate the DC and AC cable at site. (Example of the activity: remove the cover,
install the duct, etc.) Cable termination activity of the DC cabling, AC Cabling is not
TMEIC’s scope.
 Hot Commissioning : (For Inverter)
 TMEIC’s activity to confirm inverter is connected properly and works properly.
 Waiting time due to lack of readiness from either side is subject of additional charge.
 Pre-Commissioning or off-grid commissioning is not included.

11
TMEIC Confidential
G0-L0AS-7A20120-101-A

Attachment

Attachment A. Single Line Diagram

12
TMEIC Confidential
G0-L0AS-7A20120-101-A

Attachment B-1. Drawing of 1500V 5.1MVA SOLAR WARE STATION

13
TMEIC Confidential
G0-L0AS-7A20120-101-A

Attachment B-2. Drawing of 1500V 5.1MVA SOLAR WARE STATION for basement

14
TMEIC Confidential
G0-L0AS-7A20120-101-A

Revision Record

Revision Date Approved by Checked by Drafting by Remarks


th
A 14 Nov. 2018 S. Kadoya Z. Li Z. Li First issued

15