2.
3
Bitumen
...........-
(Packed)
,...
:VG-10 (80/100)
~iturT1~n(~ulk.):yC;~~Q(?017q)
- , -_ " , .
MT
. -
...MT - +
30260.00
27960.00 ············1
...
•••
··1· ·················································1····........
39320.00
1··································
36820.00
...............
...
1
MT 31060.00 ••• 40120.00 •••
4. Bitumen (Packed) :VG-30 (60/70)
5. ~it~~~ri(~~lkL:YQ~4Q(~Qj4Qj . MT 28560.00 ••• 38660.00
...+MT ... ••• ••• ••• •••
219 6 ~i~~I!l~~{E?~~~_g):YQ~4Q{~Ql4Q) . ...........
.
7.
8.
Penetrationgr. Bitumen 10120 (Packed)
. $ii~~iri9~~g~~js_i9ri($~f~fM$fyp~:
MT
.. - MT .....
•••
23250.00
34290.00
... 29840.00
•••
...
41780.00
•••
__~:_
10.
_~it~l!li~~~.s.~rT1l!I~i~~(P_?~~~g)fy1~Iyp~_ MT
9~fy1~:??J~~I~) . MT
•••
29790.00
29000.00
... 37760.00
34746.00
•••
11. CRMB-55 (Packed) MT·······1 41300.00
. .. 33140.00
... +............................. 1············································
I
Step -2 Add: Costof Steel = Quantity of Steel x Basic Priceof Steel (vide Item no.2, Column -5, Table 1- ~(B)
1 of this Schedule of Rates).
Step-3 Add: Cost of Carriage including necessaryloading - unloading from nearest Company Outlets
/Stack yard/Godown to the site of execution (excludingOverheadCharges & Contractor's Profit) ~ (C)
= (Costof Carriageincluding loading - unloading charges)/ 1.15
Add: OverheadCharges@5%/15% /30% of (B+C)as the case may be (vide SI. 3 of PREMBlE). ~(O)
Step -4
1
1st Addenda &Corrigenda to PWD (WB), SOR: 2018 Volume III : Road & Bridge Works
SI. Items
No
Unit
2 3 4 5 6 7 8 9
1 Stone chips 26.5 mm 601 *** 563 655 595
2 Stone chips 22.4 mm 622 *** 628 833 660
3 Stone chips 13.2 mm 645 *** 616 942 611
4 Stone chips 11.2 mm 506 *** 411 519 611
5 Stone chips 5.6 mm 253 *** 216 319 319
6 Stone Grit 153 *** 205 246 ***
7 Stone dust mixed with grit 139 351 92 92 ***
8 40 mm Nominal graded Stone 510 *** 551 *** 603
aggregate
9 20 mm Nominal graded Stone 561 *** 566 *** 639
aggregate
10 10 mm Nominal graded Stone 430 *** 393 *** 556
aggregate
11 Grade- I (63 - 45mm) Stone 530 368 460 *** 400
Aggregates
12 Grade- II (53 - 22.4 mm) 552 411 519 *** 595
Stone Aggregates
13 Stone ScreeningType- A 335 *** 335 *** ***
14 Stone ScreeningType- B 141 *** 91 *** ***
15 Stone aggregates 37.5 mm 548 411 519 *** 595
16 Shingles 63 mm *** *** *** *** 206
17 Shingles 37.5 mm *** *** *** *** 238
18 Bajree 22.4 mm *** *** *** *** 325
19 Broken Bajree 22.4 mm *** *** *** *** 346
20 Bajree 13.2 mm *** *** *** *** 351
21 Bajree 11.2 mm *** *** *** *** 325
22 Boulder above 225 mm *** *** 260 216 292
23 Boulder 225 - 150 mm *** *** 216 *** 211
24 Boulder 30 / 45 kg 332 *** *** ***
25 RiverBed Material *** *** *** *** 113
26 RiverGrit *** *** *** *** 249
2
1st Addenda &Corrigenda to PWD (WB), SOR: 2018 Volume III : Road & Bridge Works
4 . po,
0 II ounnq Correctione are to be made to the Item as shown below:
In Place of To be read as
All districts of W.B. &
Page Item No.1 SI. All districts of W.B. & Darjeeling Darjeeling Hill Darjeeling Hill
Darjeeling Plain of Siliguri
No. No. Plain of Siliguri Sub-Division Area Area
Sub-Division
Rate (Rs) Rate (Rs) Rate (Rs)
Rate (Rs)
4.08 B (i) 214.00 266.00 221.00 281.00
(ii) 203.00 281.00 214.00 308.00
(iii) 198.00 237.00 202.00 247.00
246
(iv) 199.00 244.00 204.00 256.00
(v) 208.00 252.00 212.00 262.00
(vi) 201.00 269.00 210.00 290.00
1.General Specification:
Cement (Sl.No-2.1.4, Page-9)
i) Composite cement conforming to IS: 16415: 2015.
~~' ~
111Qll~
(GAUT AM ADAK)
..J)
(DEBASH S
h'
"'I rJt-vOlg
R
Y)
a U..-1
'(j~d"-,,,-.)
9-L/'.rr(
(TAPAS MUKHOPADHYAY)
-r
(TAPA~H KR. DEY)
Superintending Engineer Superintending Engineer Superintending Engineer Engineer·in·Chief
Bridge Planning Circle Survey& Design Circle Planning & Monitoring Circle Public Works Department
Memberof the Combined Member of the Combined Member Convener of the Chairman of the Combined
Schedule Committee Schedule Committee Combined Schedule Committee ScheduleCommittee
PW Ote.& PW (Roads) Ote. PW Ote.& PW (Roads) Ote. PW Ote. & PW (Roads) Ote. PW Ote. & PW (Roads) Ote.