QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
1 Earth work.
1.1 Site clearence works: Clearing the
site with cutting grass, levelling
humps, uprootings and clearing
surface grass upto 15 cms and
disposing in specified places all
complete as per instructions of site
engineer

Total land area 1 12962.60 Area 12962.60


Total 12962.60 Sft.
1.2 Earthwork in excavation of
foundation in Boulder mix soil up
to size 30 cms, lead 10m and lift 2.0
m all complete
COLUMN FOUNDATIONS
F1 15 8.33 8.33 5.00 5204.17
F2 14 6.33 6.33 5.00 2804.82
F3 7 5.67 5.67 5.00 1125.21
CF1 1 10.00 7.92 5.00 50.00
CF2 1 11.25 7.67 5.00 431.44
CF3 1 8.83 5.58 5.00 246.36
WALL FOUNDATIONS
Grid - A ( 1 - 5 ) 1 38.17 2.00 3.41 260.32
Grid - B ( 1 - 5 ) 1 35.51 2.00 3.41 242.18
Grid - C ( 1 - 5 ) 1 31.51 2.00 3.41 214.90
Grid - D ( 1 - 5 ) 1 29.51 2.00 3.41 201.26
Grid - E ( 1 - 5 ) 1 34.25 2.00 3.41 233.59
Grid - 1 ( A - E ) 1 28.68 2.00 3.41 195.60
Grid - 2 ( A - E ) 1 26.93 2.00 3.41 183.63
Grid - 3 ( A - E ) 1 37.18 2.00 3.41 253.53
Grid - 4 ( A - E ) 1 27.18 2.00 3.41 185.33
Grid - 5 ( A - E ) 1 29.68 2.00 3.41 202.42

Grid - E ( 6 - 8 ) 1 25.58 2.00 3.41 174.42


Grid - F ( 6 - 13 ) 1 48.02 2.00 3.41 327.50
Grid - G ( 6 - 13 ) 1 41.92 2.00 3.41 285.86
Grid - 6 ( E - G ) 1 16.49 2.00 3.41 112.46
Grid - 7 ( E - G ) 1 18.67 2.00 3.41 127.30

Estimated by: Checked by: Approved by:


2 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
Grid - 9 ( E - G ) 1 15.83 2.00 3.41 107.96
Grid - 10 ( F - G ) 1 9.75 2.00 3.41 66.50
Grid - 11 ( E - G ) 1 16.71 2.00 3.41 113.96
Grid - 12 ( E - G ) 1 16.71 2.00 3.41 113.96
Grid - 13 ( E - G ) 1 18.71 2.00 3.41 127.60

Total 13592.26 Cft.


1.3 Earth work in filling in foundation,
floors etc in 15 cms layers and
compaction by water spray all
complete

Total E/W 1 13592.26 13592.26


Less Footing RCC -1 3730.76 -3730.76
Less PCC -1 2408.19 -2408.19
Less Brick wall -1 2381.24 -2381.24
Building area filling 1 3978.67 1.00 3978.67
Total 9050.75 Cft.
1.4 Soling Works: Boulder soling with
sand compaction in foundations,
floors etc all complete

Total 0.00 Cft.


1.5 Soling Works: First class brick
soling (flat) with sand compaction
in foundations, floors etc all
complete

Building area, G/F 1 6497.23 Area 6497.23


COLUMN FOUNDATIONS
F1 15 8.33 8.33 1040.83
F2 14 6.33 6.33 560.96
F3 7 5.67 5.67 225.04
CF1 1 10.00 7.92 79.20
CF2 1 11.25 7.67 86.29
CF3 1 8.83 5.58 49.27
WALL FOUNDATIONS
Grid - A ( 1 - 5 ) 1 38.17 2.00 76.34
Grid - B ( 1 - 5 ) 1 35.51 2.00 71.02

Estimated by: Checked by: Approved by:


3 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
Grid - C ( 1 - 5 ) 1 31.51 2.00 63.02
Grid - D ( 1 - 5 ) 1 29.51 2.00 59.02
Grid - E ( 1 - 5 ) 1 34.25 2.00 68.50
Grid - 1 ( A - E ) 1 28.68 2.00 57.36
Grid - 2 ( A - E ) 1 26.93 2.00 53.85
Grid - 3 ( A - E ) 1 37.18 2.00 74.35
Grid - 4 ( A - E ) 1 27.18 2.00 54.35
Grid - 5 ( A - E ) 1 29.68 2.00 59.36

Grid - E ( 6 - 8 ) 1 25.58 2.00 51.15


Grid - F ( 6 - 13 ) 1 48.02 2.00 96.04
Grid - G ( 6 - 13 ) 1 41.92 2.00 83.83
Grid - 6 ( E - G ) 1 16.49 2.00 32.98
Grid - 7 ( E - G ) 1 18.67 2.00 37.33
Grid - 9 ( E - G ) 1 15.83 2.00 31.66
Grid - 10 ( F - G ) 1 9.75 2.00 19.50
Grid - 11 ( E - G ) 1 16.71 2.00 33.42
Grid - 12 ( E - G ) 1 16.71 2.00 33.42
Grid - 13 ( E - G ) 1 18.71 2.00 37.42

Total 9632.75 Sft.


2 Concrete Works
2.1 PCC Works M10
Plain cement concret PCC(1:3:6) in
foundation, floors etc. with cement,
sand and crussed aggregate of 10
mm to 38mm gauge including
mixing with mixture machine &
compaction by vibrator, laying in
line & level with curing all type of
works complete as per
specifications & instructions

Same as Brick soling area 1 9632.75 Area 0.25 2408.19

Total 2408.19 Cft.


2.2 RCC Works in PCC M20

Estimated by: Checked by: Approved by:


4 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit

RCC work: RCC work in PCC


(1:1.5:3) in foundation, floors,
columns, beams, slabs etc. with
cement,sand and crussed aggregate
of 10 mm to 38mm gauge including
mixing with mixture machine &
compaction by vibrator, laying in
line & level with curing all type of
works complete as per
specifications & instructions

COLUMN FOUNDATIONS
F1 15 8.33 8.33 1.00 1040.83
F2 14 6.33 6.33 1.00 560.96
F3 7 5.67 5.67 0.83 186.79
CF1 1 10.00 7.92 1.17 92.66
CF2 1 11.25 7.67 1.17 100.96
CF3 1 8.83 5.58 0.83 40.90
FOUNDATIONS BEAM
Grid - A ( 1 - 5 ) 1 58.15 0.75 1.00 43.61
Grid - B ( 1 - 5 ) 1 58.15 0.75 1.00 43.61
Grid - C ( 1 - 5 ) 1 58.15 0.75 1.00 43.61
Grid - D ( 1 - 5 ) 1 58.15 0.75 1.00 43.61
Grid - E ( 1 - 5 ) 1 56.98 0.75 1.00 42.74
Grid - 1 ( A - E ) 1 56.32 0.75 1.00 42.24
Grid - 2 ( A - E ) 1 56.32 0.75 1.00 42.24
Grid - 3 ( A - E ) 1 56.32 0.75 1.00 42.24
Grid - 4 ( A - E ) 1 56.32 0.75 1.00 42.24
Grid - 5 ( A - E ) 1 56.32 0.75 1.00 42.24

Grid - E ( 6 - 8 ) 1 31.74 0.75 1.00 23.81


Grid - F ( 6 - 13 ) 1 82.65 0.75 1.00 61.99
Grid - G ( 6 - 13 ) 1 72.56 0.75 1.00 54.42
Grid - 6 ( E - G ) 1 25.49 0.75 1.00 19.12
Grid - 7 ( E - G ) 1 25.49 0.75 1.00 19.12
Grid - 9 ( E - G ) 1 25.50 0.75 1.00 19.13
Grid - 10 ( F - G ) 1 14.91 0.75 1.00 11.18
Grid - 11 ( E - G ) 1 25.49 0.75 1.00 19.12

Estimated by: Checked by: Approved by:


5 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
Grid - 12 ( E - G ) 1 25.49 0.75 1.00 19.12
Grid - 13 ( E - G ) 1 30.58 0.75 1.00 22.94
TIE BEAM
Grid - A ( 1 - 5 ) 1 58.15 0.75 1.00 43.61
Grid - B ( 1 - 5 ) 1 58.15 0.75 1.00 43.61
Grid - C ( 1 - 5 ) 1 58.15 0.75 1.00 43.61
Grid - D ( 1 - 5 ) 1 58.15 0.75 1.00 43.61
Grid - E ( 1 - 5 ) 1 56.98 0.75 1.00 42.74
Grid - 1 ( A - E ) 1 56.32 0.75 1.00 42.24
Grid - 2 ( A - E ) 1 56.32 0.75 1.00 42.24
Grid - 3 ( A - E ) 1 56.32 0.75 1.00 42.24
Grid - 4 ( A - E ) 1 56.32 0.75 1.00 42.24
Grid - 5 ( A - E ) 1 56.32 0.75 1.00 42.24

Grid - E ( 6 - 8 ) 1 31.74 0.75 1.00 23.81


Grid - F ( 6 - 13 ) 1 82.65 0.75 1.00 61.99
Grid - G ( 6 - 13 ) 1 72.56 0.75 1.00 54.42
Grid - 6 ( E - G ) 1 25.49 0.75 1.00 19.12
Grid - 7 ( E - G ) 1 25.49 0.75 1.00 19.12
Grid - 9 ( E - G ) 1 25.50 0.75 1.00 19.13
Grid - 10 ( F - G ) 1 14.91 0.75 1.00 11.18
Grid - 11 ( E - G ) 1 25.49 0.75 1.00 19.12
Grid - 12 ( E - G ) 1 25.49 0.75 1.00 19.12
Grid - 13 ( E - G ) 1 30.58 0.75 1.00 22.94
COLUMN, UP TO PLINTH Lvl.
Column 42 1.17 1.17 5.41 311.04
FIRST BASEMENT, SLAB
COLUMN
Column 26 1.17 1.17 10.58 376.56
BEAMS
Grid - A ( 1 - 5 ) 1 58.15 0.75 0.75 32.71
Grid - B ( 1 - 5 ) 1 58.15 0.75 0.75 32.71
Grid - C ( 1 - 5 ) 1 58.15 0.75 0.75 32.71
Grid - D ( 1 - 5 ) 1 58.15 0.75 0.75 32.71
Grid - E ( 1 - 5 ) 1 56.98 0.75 0.75 32.05

Estimated by: Checked by: Approved by:


6 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
Grid - 1 ( A - E ) 1 56.32 0.75 0.75 31.68
Grid - 2 ( A - E ) 1 56.32 0.75 0.75 31.68
Grid - 3 ( A - E ) 1 56.32 0.75 0.75 31.68
Grid - 4 ( A - E ) 1 56.32 0.75 0.75 31.68
Grid - 5 ( A - E ) 1 56.32 0.75 0.75 31.68
Shear Wall 1 56.98 0.75 9.83 420.09
SLAB
Slab area 1 3978.67 Area 0.42 1671.04
GROUND FLOOR, SLAB
COLUMN
Column 35 1.17 1.17 10.58 506.90
BEAMS
Grid - A ( 1 - 5 ) 1 58.15 0.75 0.75 32.71
Grid - B ( 1 - 5 ) 1 58.15 0.75 0.75 32.71
Grid - C ( 1 - 5 ) 1 58.15 0.75 0.75 32.71
Grid - D ( 1 - 5 ) 1 58.15 0.75 0.75 32.71
Grid - E ( 1 - 5 ) 1 56.98 0.75 0.75 32.05
Grid - 1 ( A - E ) 1 56.32 0.75 0.75 31.68
Grid - 2 ( A - E ) 1 56.32 0.75 0.75 31.68
Grid - 3 ( A - E ) 1 56.32 0.75 0.75 31.68
Grid - 4 ( A - E ) 1 56.32 0.75 0.75 31.68
Grid - 5 ( A - E ) 1 56.32 0.75 0.75 31.68

Grid - F ( 9 - 13 ) 1 49.48 0.75 0.75 27.83


Grid - G ( 10 - 13 ) 1 33.24 0.75 0.75 18.70
Grid - 9 ( E - F ) 1 10.58 0.75 0.75 5.95
Grid - 10 ( F - G ) 1 14.91 0.75 0.75 8.39
Grid - 11 ( E - G ) 1 25.49 0.75 0.75 14.34
Grid - 12 ( E - G ) 1 25.49 0.75 0.75 14.34
Grid - 13 ( E - G ) 1 30.58 0.75 0.75 17.20
SLAB
Slab area 1 6076.66 Area 0.42 2552.20
Less Staircase -1 233.63 Area 0.42 -98.12
STAIRCASE
Beam 1 10.58 0.75 0.75 5.95
Landing 1 10.92 5.75 0.42 26.37

Estimated by: Checked by: Approved by:


7 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
West slab 2 11.42 5.00 0.42 47.96
Riser / Tread 11 5.00 1.00 0.50 27.50
Slab 1 10.92 5.75 0.42 26.37
FIRST FLOOR, SLAB
COLUMN
Column 27 1.17 1.17 10.58 391.04
BEAMS
Grid - D ( 1 - 5 ) 1 58.15 0.75 0.75 32.71
Grid - E ( 6 - 13 ) 1 88.73 0.75 0.75 49.91
Grid - F ( 6 - 13 ) 1 82.65 0.75 0.75 46.49
Grid - G ( 6 - 13 ) 1 72.56 0.75 0.75 40.82

Grid - 6 ( E - G ) 1 25.41 0.75 0.75 14.29


Grid - 7 ( E - G ) 1 25.41 0.75 0.75 14.29
Grid - 9 ( D - G ) 1 40.24 0.75 0.75 22.64
Grid - 10 ( F - G ) 1 14.92 0.75 0.75 8.39
Grid - 10' ( D - E ) 1 14.83 0.75 0.75 8.34
Grid - 11 ( E - G ) 1 25.41 0.75 0.75 14.29
Grid - 11' ( D - E ) 1 15.08 0.75 0.75 8.48
Grid - 12 ( E - G ) 1 25.41 0.75 0.75 14.29
Grid - 12' ( D - E ) 1 14.83 0.75 0.75 8.34
Grid - 13 ( D - G ) 1 46.66 0.75 0.75 26.25
SLAB
Slab area 1 4073.68 Area 0.42 1710.95
Less Staircase -1 233.63 Area 0.42 -98.12
STAIRCASE
Beam 1 10.58 0.75 0.75 5.95
Landing 1 10.92 5.75 0.42 26.37
West slab 2 11.42 5.00 0.42 47.96
Riser / Tread 11 5.00 1.00 0.50 27.50
Slab 1 10.92 5.75 0.42 26.37
TOP FLOOR, SLAB
COLUMN
Column 9 1.17 1.17 10.58 130.35
BEAMS
Grid - E ( 9 - 11 ) 1 20.41 0.75 0.75 11.48
Grid - F ( 9 - 11 ) 1 18.99 0.75 0.75 10.68

Estimated by: Checked by: Approved by:


8 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
Grid - G ( 9 - 11 ) 1 18.99 0.75 0.75 10.68

Grid - 9 ( E - G ) 1 25.50 0.75 0.75 14.34


Grid - 10 ( E - G ) 1 25.62 0.75 0.75 14.41
Grid - 11 ( E - G ) 1 25.41 0.75 0.75 14.29
SLAB
Slab area 1 659.07 Area 0.42 276.81

Total 12973.51 Cft.


3 Steel Reinforcement works
Tor /TMT Reinforcement work for
R.C.C work including supply,
straighting, cutting, bending,
binding and laying of different
diameter steel rod in all types of
R.C.C work as per design
,drawing ,specification and
instruction all complete work
8/10/12 /16 & 20 mm Diameter

Total Kg. 57349.60 Kg


Total 57.35 Mt.
Formworks and scaffoldings
4
works
Form work for Foundation, beams,
column, slab etc. all types of
concrete with 19 mm plyboard with
steel props centering & shuttering
including promping wedging,
scafolding, proping, stagging
inclusive of utilization till the
support is fully unyielding net as
per design ,drawing specification
and instruction

COLUMN FOUNDATIONS
F1 15 33.32 0.83 414.83
F2 14 25.32 0.83 294.22
F3 7 22.68 0.67 106.37
CF1 1 35.84 1.17 41.93
CF2 1 37.84 1.17 44.27
CF3 1 28.82 0.83 23.92
FOUNDATIONS BEAM

Estimated by: Checked by: Approved by:


9 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
Grid - A ( 1 - 5 ) 1 58.15 2.00 116.30
Grid - B ( 1 - 5 ) 1 58.15 2.00 116.30
Grid - C ( 1 - 5 ) 1 58.15 2.00 116.30
Grid - D ( 1 - 5 ) 1 58.15 2.00 116.30
Grid - E ( 1 - 5 ) 1 56.98 2.00 113.96
Grid - 1 ( A - E ) 1 56.32 2.00 112.64
Grid - 2 ( A - E ) 1 56.32 2.00 112.64
Grid - 3 ( A - E ) 1 56.32 2.00 112.64
Grid - 4 ( A - E ) 1 56.32 2.00 112.64
Grid - 5 ( A - E ) 1 56.32 2.00 112.64

Grid - E ( 6 - 8 ) 1 31.74 2.00 63.48


Grid - F ( 6 - 13 ) 1 82.65 2.00 165.30
Grid - G ( 6 - 13 ) 1 72.56 2.00 145.12
Grid - 6 ( E - G ) 1 25.49 2.00 50.98
Grid - 7 ( E - G ) 1 25.49 2.00 50.98
Grid - 9 ( E - G ) 1 25.50 2.00 51.00
Grid - 10 ( F - G ) 1 14.91 2.00 29.82
Grid - 11 ( E - G ) 1 25.49 2.00 50.98
Grid - 12 ( E - G ) 1 25.49 2.00 50.98
Grid - 13 ( E - G ) 1 30.58 2.00 61.16
TIE BEAM
Grid - A ( 1 - 5 ) 1 58.15 2.00 116.30
Grid - B ( 1 - 5 ) 1 58.15 2.00 116.30
Grid - C ( 1 - 5 ) 1 58.15 2.00 116.30
Grid - D ( 1 - 5 ) 1 58.15 2.00 116.30
Grid - E ( 1 - 5 ) 1 56.98 2.00 113.96
Grid - 1 ( A - E ) 1 56.32 2.00 112.64
Grid - 2 ( A - E ) 1 56.32 2.00 112.64
Grid - 3 ( A - E ) 1 56.32 2.00 112.64
Grid - 4 ( A - E ) 1 56.32 2.00 112.64
Grid - 5 ( A - E ) 1 56.32 2.00 112.64

Grid - E ( 6 - 8 ) 1 31.74 2.00 63.48


Grid - F ( 6 - 13 ) 1 82.65 2.00 165.30

Estimated by: Checked by: Approved by:


10 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
Grid - G ( 6 - 13 ) 1 72.56 2.00 145.12
Grid - 6 ( E - G ) 1 25.49 2.00 50.98
Grid - 7 ( E - G ) 1 25.49 2.00 50.98
Grid - 9 ( E - G ) 1 25.50 2.00 51.00
Grid - 10 ( F - G ) 1 14.91 2.00 29.82
Grid - 11 ( E - G ) 1 25.49 2.00 50.98
Grid - 12 ( E - G ) 1 25.49 2.00 50.98
Grid - 13 ( E - G ) 1 30.58 2.00 61.16
COLUMN, UP TO PLINTH Lvl.
Column 42 4.68 5.41 1063.39
FIRST BASEMENT, SLAB
COLUMN
Column 26 4.68 10.58 1287.37
BEAMS
Grid - A ( 1 - 5 ) 1 58.15 2.25 130.84
Grid - B ( 1 - 5 ) 1 58.15 2.25 130.84
Grid - C ( 1 - 5 ) 1 58.15 2.25 130.84
Grid - D ( 1 - 5 ) 1 58.15 2.25 130.84
Grid - E ( 1 - 5 ) 1 56.98 2.25 128.21
Grid - 1 ( A - E ) 1 56.32 2.25 126.72
Grid - 2 ( A - E ) 1 56.32 2.25 126.72
Grid - 3 ( A - E ) 1 56.32 2.25 126.72
Grid - 4 ( A - E ) 1 56.32 2.25 126.72
Grid - 5 ( A - E ) 1 56.32 2.25 126.72
Shear Wall 2 56.98 9.83 1120.23
SLAB
Slab area 1 3978.67 Area 3978.67
Slab sides 1 252.33 0.42 105.98
GROUND FLOOR, SLAB
COLUMN
Column 35 4.68 10.58 1733.00
BEAMS
Grid - A ( 1 - 5 ) 1 58.15 2.25 130.84
Grid - B ( 1 - 5 ) 1 58.15 2.25 130.84
Grid - C ( 1 - 5 ) 1 58.15 2.25 130.84
Grid - D ( 1 - 5 ) 1 58.15 2.25 130.84

Estimated by: Checked by: Approved by:


11 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
Grid - E ( 1 - 5 ) 1 56.98 2.25 128.21
Grid - 1 ( A - E ) 1 56.32 2.25 126.72
Grid - 2 ( A - E ) 1 56.32 2.25 126.72
Grid - 3 ( A - E ) 1 56.32 2.25 126.72
Grid - 4 ( A - E ) 1 56.32 2.25 126.72
Grid - 5 ( A - E ) 1 56.32 2.25 126.72

Grid - F ( 9 - 13 ) 1 49.48 2.25 111.33


Grid - G ( 10 - 13 ) 1 33.24 2.25 74.79
Grid - 9 ( E - F ) 1 10.58 2.25 23.81
Grid - 10 ( F - G ) 1 14.91 2.25 33.55
Grid - 11 ( E - G ) 1 25.49 2.25 57.35
Grid - 12 ( E - G ) 1 25.49 2.25 57.35
Grid - 13 ( E - G ) 1 30.58 2.25 68.81
SLAB
Slab area 1 6076.66 Area 6076.66
Slab sides 1 318.33 0.42 133.70
Less Staircase -1 233.63 Area -233.63
Void sides 1 65.67 0.42 27.58
STAIRCASE
Beam 1 10.58 2.25 23.81
Landing 1 10.92 5.75 62.79
West slab 2 11.42 5.00 114.20
West slab sides 4 11.42 1.00 45.68
Riser 22 5.00 0.50 55.00
Slab 1 10.92 5.75 62.79
FIRST FLOOR, SLAB
COLUMN
Column 27 4.68 10.58 1336.89
BEAMS
Grid - D ( 1 - 5 ) 1 58.15 2.25 130.84
Grid - E ( 6 - 13 ) 1 88.73 2.25 199.64
Grid - F ( 6 - 13 ) 1 82.65 2.25 185.96
Grid - G ( 6 - 13 ) 1 72.56 2.25 163.26

Grid - 6 ( E - G ) 1 25.41 2.25 57.17


Grid - 7 ( E - G ) 1 25.41 2.25 57.17

Estimated by: Checked by: Approved by:


12 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
Grid - 9 ( D - G ) 1 40.24 2.25 90.54
Grid - 10 ( F - G ) 1 14.92 2.25 33.57
Grid - 10' ( D - E ) 1 14.83 2.25 33.37
Grid - 11 ( E - G ) 1 25.41 2.25 57.17
Grid - 11' ( D - E ) 1 15.08 2.25 33.93
Grid - 12 ( E - G ) 1 25.41 2.25 57.17
Grid - 12' ( D - E ) 1 14.83 2.25 33.37
Grid - 13 ( D - G ) 1 46.66 2.25 104.99
SLAB
Slab area 1 4073.68 Area 4073.68
Slab sides 1 289.92 0.42 121.77
Less Staircase -1 233.63 Area -233.63
Void sides 1 65.67 0.42 27.58
STAIRCASE
Beam 1 10.58 2.25 23.81
Landing 1 10.92 5.75 62.79
West slab 2 11.42 5.00 114.20
West slab sides 4 11.42 1.00 45.68
Riser 22 5.00 0.50 55.00
Slab 1 10.92 5.75 62.79
TOP FLOOR, SLAB
COLUMN
Column 9 4.68 10.58 445.63
BEAMS
Grid - E ( 9 - 11 ) 1 20.41 2.25 45.92
Grid - F ( 9 - 11 ) 1 18.99 2.25 42.73
Grid - G ( 9 - 11 ) 1 18.99 2.25 42.73

Grid - 9 ( E - G ) 1 25.50 2.25 57.38


Grid - 10 ( E - G ) 1 25.62 2.25 57.65
Grid - 11 ( E - G ) 1 25.41 2.25 57.17
SLAB
Slab area 1 659.07 Area 659.07
Slab sides 1 104.33 0.42 43.82

S. Total 31685.17 Sft.

Estimated by: Checked by: Approved by:


13 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
5 First class local chimney made
exposed fair face brick wall work in
cement sand mortar (1:4)
superstructure in perfect line and
level including wetting the brick,
packing the joints and curing all
types of works as per specification
and instruction by Engineer (fair
faced brick work)

5.1 Brick work 9" th ( c:s 1:6 )


WALL, UP TO PLINTH Lvl.
Grid - A ( 1 - 5 ) 1 58.15 0.75 3.41 148.72
Grid - B ( 1 - 5 ) 1 58.15 0.75 3.41 148.72
Grid - C ( 1 - 5 ) 1 58.15 0.75 3.41 148.72
Grid - D ( 1 - 5 ) 1 58.15 0.75 3.41 148.72
Grid - E ( 1 - 5 ) 1 56.98 0.75 3.41 145.73
Grid - 1 ( A - E ) 1 56.32 0.75 3.41 144.04
Grid - 2 ( A - E ) 1 56.32 0.75 3.41 144.04
Grid - 3 ( A - E ) 1 56.32 0.75 3.41 144.04
Grid - 4 ( A - E ) 1 56.32 0.75 3.41 144.04
Grid - 5 ( A - E ) 1 56.32 0.75 3.41 144.04

Grid - E ( 6 - 8 ) 1 31.74 0.75 3.41 81.18


Grid - F ( 6 - 13 ) 1 82.65 0.75 3.41 211.38
Grid - G ( 6 - 13 ) 1 72.56 0.75 3.41 185.57
Grid - 6 ( E - G ) 1 25.49 0.75 3.41 65.19
Grid - 7 ( E - G ) 1 25.49 0.75 3.41 65.19
Grid - 9 ( E - G ) 1 25.50 0.75 3.41 65.22
Grid - 10 ( F - G ) 1 14.91 0.75 3.41 38.13
Grid - 11 ( E - G ) 1 25.49 0.75 3.41 65.19
Grid - 12 ( E - G ) 1 25.49 0.75 3.41 65.19
Grid - 13 ( E - G ) 1 30.58 0.75 3.41 78.21
FIRST BASEMENT
Grid - 1 ( A - D ) 1 14.83 0.75 9.50 105.66
Less D3 -1 4.00 0.75 7.50 -22.50
Staircase, Wall 1 10.67 0.75 9.50 76.02
" 1 15.42 0.75 9.50 109.87

Estimated by: Checked by: Approved by:


14 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
L. Rest Room
Wall 1 60.16 0.75 9.50 428.64
Less V -1 7.67 0.75 2.00 -11.51
Less D1 -1 3.00 0.75 7.00 -15.75
G. Rest Room
Wall 2 15.50 0.75 9.50 220.88
Less V -1 7.50 0.75 2.00 -11.25
Less D1 -1 3.00 0.75 7.00 -15.75
Less D -1 2.50 0.75 7.00 -13.13
Chainging Room
Wall 1 27.75 0.75 9.50 197.72
GROUND FLOOR
Grid - E ( 6 - 9 ) 1 31.75 0.75 14.00 333.38
Less D3 -1 4.00 0.75 8.00 -24.00
Less W2 -2 7.00 0.75 4.50 -47.25
Grid - 6 ( E - G ) 1 25.42 0.75 14.00 266.91
Less W1 -1 10.50 0.75 4.50 -35.44
Less W2 -1 7.00 0.75 4.50 -23.63
Less W3 -1 3.00 0.75 4.50 -10.13
Grid - G ( 6 - 13 ) 1 72.40 0.75 14.00 760.20
Less D0 -1 6.00 0.75 8.00 -36.00
Less SD -1 7.00 0.75 8.00 -42.00
Grid - 13 ( E - G ) 1 32.75 0.75 14.00 343.88
Less W4 -3 2.00 0.75 4.50 -20.25
Staircase
Wall 1 23.50 0.75 14.00 246.75
Wall 2 14.92 0.75 14.00 313.32
FIRST FLOOR
Staircase
Wall 1 20.42 0.75 9.83 150.55
Wall 1 21.17 0.75 9.83 156.08
Wall 1 17.17 0.75 9.83 126.59
Less D3 -3 4.00 0.75 8.00 -72.00
L. + G. Rest Room
Wall 1 16.83 0.75 9.83 124.08

Estimated by: Checked by: Approved by:


15 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
Wall 2 14.92 0.75 9.83 220.00
Less V -2 5.00 0.75 2.00 -15.00
Confrence Hall
Wall 1 70.50 0.75 9.83 519.76
Less W4 -6 2.00 0.75 4.50 -40.50
Less W -1 7.00 0.75 4.50 -23.63

S. Total 6601.81 Cft


5.2 Brick work 4" th ( c:s 1:4 )
FIRST BASEMENT
Staircase, Wall 1 14.25 9.50 135.38
G. Rest Room
Wall 1 30.92 10.58 327.13
Less D1 -1 3.00 7.00 -21.00
Chainging Room
Wall 2 10.25 10.58 216.89
Wall 1 11.08 10.58 117.23
Wall 1 6.50 10.58 68.77
Less D1 -2 3.00 7.00 -42.00
Less D2 -1 2.50 7.00 -17.50
GROUND FLOOR
Dance Floor
Wall 1 55.42 14.00 775.88
Less D1 -1 3.00 7.00 -21.00
Less SD -1 5.00 7.00 -35.00
Staircase
Wall 1 20.42 14.00 285.88
Changing + Bath Room
Wall 1 9.50 14.00 133.00
Wall 3 4.33 14.00 181.86
Less D2 -2 2.50 7.00 -35.00
FIRST FLOOR
L. + G. Rest Room
Wall 1 26.59 9.83 261.38
Less D2 -2 2.50 7.00 -35.00

Estimated by: Checked by: Approved by:


16 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit

S. Total 2296.89 Sft


5.3 Cement Board partations walls.
FIRST BASEMENT
L. Rest Room
Wall 1 11.09 10.58 117.33
Wall 3 8.91 10.58 282.80
Wall 1 0.75 10.58 7.94
Less D2 -4 2.50 7.00 -70.00
Less D1 -1 3.00 7.00 -21.00
G. Rest Room
Wall 2 9.00 10.58 190.44
Less D2 -2 2.50 7.00 -35.00
GROUND FLOOR
FIRST FLOOR
L. + G. Rest Room
Wall 1 21.25 10.58 224.83
Less D2 -3 2.50 7.00 -52.50
Confrence Hall
Truss
Wall 1 194.00 10.58 2052.52

S. Total 2697.36 Sft


6 12.5 / 20 mm thick (1:4) c/s plaster
work on floors, walls etc. with
proper curing all complete

6.1 Plaster work External ( c:s 1:4)


FIRST BASEMENT
O/S All Wall 1 117.50 11.00 1292.50
Less D3 -0.5 4.00 7.50 -15.00
Less V -0.5 7.67 2.00 -7.67
O/S All Wall 1 71.59 10.58 757.42
Less D1 -1.0 3.00 7.00 -21.00
Less D2 -0.5 2.50 7.00 -8.75
Less V -0.5 7.67 2.00 -7.67

Estimated by: Checked by: Approved by:


17 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
SECOND BASEMENT
O/S All Wall 1 66.33 11.00 729.63
GROUND FLOOR
O/S All Wall 1 177.33 14.00 2482.62
Less D3 -0.5 4.00 8.00 -16.00
Less W2 -1.0 7.00 4.50 -31.50
Less W1 -0.5 10.50 4.50 -23.63
Less W2 -0.5 7.00 4.50 -15.75
Less W3 -0.5 3.00 4.50 -6.75
Less D0 -0.5 6.00 8.00 -24.00
Less SD -0.5 7.00 8.00 -28.00
Less W4 -2 2.00 4.50 -13.50
O/S All Wall 1 49.33 13.58 669.90
Column 26 4.68 13.58 1652.41
FIRST FLOOR
O/S All Wall 1 124.40 11.00 1368.40
Less V -1.0 5.00 2.00 -10.00
Less W4 -3.0 2.00 4.50 -27.00
Less W -0.5 7.00 4.50 -15.75
Column 6 4.68 13.58 381.33

S. Total 9062.25 Sft.


6.2 Plaster work Internal ( c:s 1:4)

FIRST BASEMENT
Staircase
Wall 1 43.92 10.58 464.67
L. Rest Room
Wall 1 62.25 10.58 658.61
Less D1 -0.5 3.00 7.00 -10.50
Less V -0.5 7.67 2.00 -7.67
G. Rest Room
Wall 1 64.66 10.58 684.10
Wall 2 16.84 10.58 356.33
Less D1 -1.5 3.00 7.00 -31.50
Less D -0.5 2.50 7.00 -8.75

Estimated by: Checked by: Approved by:


18 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
Less V -0.5 7.50 2.00 -7.50
Chainging Room
Wall 1 58.00 10.58 613.64
Wall 2 30.50 10.58 645.38
Wall 1 36.50 10.58 386.17
Less D1 -2.0 3.00 7.00 -42.00
Less D2 -1.5 2.50 7.00 -26.25
SECOND BASEMENT
RCC Wall 1 64.00 10.58 677.12
Column Copla 10 0.42 10.58 44.44
GROUND FLOOR
Kitchen Hall
Wall 1 125.18 13.58 1699.94
Less W2 -1.5 7.00 4.50 -47.25
Less D3 -0.5 4.00 8.00 -16.00
Less W1 -0.5 10.50 4.50 -23.63
Less W3 -0.5 3.00 4.50 -6.75
Staircase
Wall 1 50.09 13.58 680.22
Wall 2 18.00 13.58 488.88
Wall 1 6.00 13.58 81.48
Less D0 -0.5 6.00 8.00 -24.00
Stage for Reception
Wall 1 53.67 13.58 728.84
Wall 1 17.00 13.58 230.86
Wall 1 18.66 13.58 253.40
Less D2 -2.0 2.50 7.00 -35.00
Lobby
Wall 1 38.33 13.58 520.52
Less D1 -0.5 3.00 7.00 -10.50
Less SD -0.5 5.00 7.00 -17.50
Toilet
Wall 1 24.00 13.58 325.92
Less D1 -0.5 3.00 7.00 -10.50
Dance Floor

Estimated by: Checked by: Approved by:


19 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
Wall 1 86.34 13.58 1172.50
Less SD -0.5 5.00 7.00 -17.50
Less W4 -1.5 2.00 4.50 -13.50
FIRST FLOOR
Staircase
Wall 1 66.68 10.58 705.47
Less D3 -1.5 4.00 8.00 -48.00
L. + G. Rest Room
Wall 1 43.34 10.58 458.54
Wall 1 47.34 10.58 500.86
Wall 1 26.84 10.58 283.97
Less V -1.0 5.00 2.00 -10.00
Less D2 -2.0 2.50 7.00 -35.00
Confrence Hall A
Wall 1 86.60 10.58 916.23
Less W4 -3.0 2.00 4.50 -27.00
Less D3 -1.0 4.00 8.00 -32.00
Confrence Hall B
Wall 1 17.16 10.58 181.55
Less W -0.5 7.00 4.50 -15.75
Confrence Hall C
Wall 1 23.92 10.58 253.07
Less D3 -0.5 4.00 8.00 -16.00

S. Total 13472.67 Sft


7 Wood Works.
7.1 Supplying and fixing ready made
solid core panel shutter for doors,
32mm thick with necessary tower
bolts, hinges, handle, screws,
locking set all compete work as per
specification and instructions
(Frame less door shutter works)

FIRST BASEMENT
Grid - 1 ( A - D )
D3 1 4.00 7.50 30.00
L. Rest Room

Estimated by: Checked by: Approved by:


20 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
D1 1 3.00 7.00 21.00
D2 4 2.50 7.00 70.00
D1 1 3.00 7.00 21.00
G. Rest Room
D1 1 3.00 7.00 21.00
D 1 2.50 7.00 17.50
D1 1 3.00 7.00 21.00
D2 2 2.50 7.00 35.00
Chainging Room
D1 2 3.00 7.00 42.00
D2 1 2.50 7.00 17.50
GROUND FLOOR
D3 1 4.00 14.00 56.00
Grid - E ( 6 - 9 )
D3 1 4.00 8.00 32.00
Grid - G ( 6 - 13 )
D0 1 6.00 8.00 48.00
SD 1 7.00 8.00 56.00
Dance Floor
D1 1 3.00 7.00 21.00
SD 1 5.00 7.00 35.00
Changing + Bath Room
D2 2 2.50 7.00 35.00
FIRST FLOOR
Staircase
D3 3 4.00 8.00 96.00
L. + G. Rest Room
D2 2 2.50 7.00 35.00
D2 3 2.50 7.00 52.50

Total 762.50 Sft

Estimated by: Checked by: Approved by:


21 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
7.2 Supplying and fixing ready made
UPVC frame for windows, 8mm
thick single layer glass with
necessary tower bolts, hinges,
handle, screws, locking set all
compete work as per specification
and instructions

FIRST BASEMENT
L. Rest Room
V 1 7.67 2.00 15.34
G. Rest Room
V 1 7.50 2.00 15.00
GROUND FLOOR
( Grid A ) W5 1 58.16 14.00 814.24
( Grid 1 ) W5 1 52.33 14.00 732.62
( Grid 1 ) D3 1 4.00 14.00 56.00
( Grid 5 ) W5 1 56.33 14.00 788.62
Grid - E ( 6 - 9 )
W2 2 7.00 4.50 63.00
Grid - 6 ( E - G )
W1 1 10.50 4.50 47.25
W2 1 7.00 4.50 31.50
W3 1 3.00 4.50 13.50
Grid - 13 ( E - G )
W4 3 2.00 4.50 27.00
FIRST FLOOR
( Grid A ) W5 1 58.16 9.83 571.71
( Grid 1 ) W5 1 14.83 9.83 145.78
L. + G. Rest Room
V 2 5.00 2.00 20.00

S. Total 3341.56 Sft


7.3 Supplying and fixing ready made
UPVC frame for windows, 8mm
thick Double layer glass with
necessary tower bolts, hinges,
handle, screws, locking set all
compete work as per specification
and instructions

Estimated by: Checked by: Approved by:


22 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit

S. Total Sft
7.4 Supplying & fixing Structure
glazing with laminated safety glass
6.38 mm thick all complete
(Toughened glass)

S. Total 0.00 Sft


8 Flooring works.
8.1 Supplying and fixing Ceramic
glazed tiles (8"x8", 8"x6") in floors,
walls etc.on toilets 1:4 c/s mortar all
complete

FIRST BASEMENT
L. Rest Room
Floor 1 107.04 area 107.04
Wall 1 44.42 7.00 310.94
Floor 1 27.95 area 27.95
Wall 1 22.25 7.00 155.75
Floor 3 16.24 area 48.72
Wall 3 16.50 7.00 346.50
Floor 1 25.62 area 25.62
Wall 1 22.58 7.00 158.06
Less D1 -1.5 3.00 7.00 -31.50
Less D2 -4.0 2.50 7.00 -70.00
Less V -0.5 7.67 2.00 -7.67
G. Rest Room
Floor 1 181.79 area 181.79
Wall 1 64.08 7.00 448.56
Floor 1 18.26 area 18.26
Wall 1 17.33 7.00 121.31
Floor 2 17.59 area 35.18
Wall 2 17.08 7.00 239.12
Less D1 -1.5 3.00 7.00 -31.50
Less D2 -2.0 2.50 7.00 -35.00
Less V -0.5 7.67 2.00 -7.67
Chainging Room

Estimated by: Checked by: Approved by:


23 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
Floor 2 13.25 15.75 417.38
Skarting 1 58.00 58.00
Toilet, Floor 1 4.00 5.50 22.00
Wall 1 19.00 7.00 133.00
Less D2 -0.5 2.50 7.00 -8.75
SECOND BASEMENT
GROUND FLOOR
Kitchen Hall
Floor 1 35.17 27.42 964.36
Wall 1 125.18 12.00 1502.16
Less W2 -1.5 7.00 4.50 -47.25
Less D3 -0.5 4.00 8.00 -16.00
Less W1 -0.5 10.50 4.50 -23.63
Less W3 -0.5 3.00 4.50 -6.75
Stage for Reception
BATH ROOM Floor 1 5.00 4.33 21.65
Wall 1 18.66 7.00 130.62
Less D2 -0.5 2.50 7.00 -8.75
Lobby
Floor 1 437.99 area 437.99
Skarting 1 87.42 87.42
Toilet
Floor 1 8.58 3.42 29.34
Wall 1 24.00 7.00 168.00
Less D1 -0.5 3.00 7.00 -10.50
Dining Hall
Floor 1 62.50 60.67 3791.88
Skarting 1 246.34 246.34
FIRST FLOOR
L. + G. Rest Room
Floor 1 3.17 5.42 17.18
Wall 1 17.18 7.00 120.26
Floor 2 3.25 6.00 39.00
Wall 2 18.50 7.00 259.00
Floor 1 72.60 Area 72.60

Estimated by: Checked by: Approved by:


24 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
Wall 1 36.33 7.00 254.31
Floor 1 4.50 8.92 40.14
Wall 1 26.84 7.00 187.88
Floor 1 14.08 6.00 84.48
Wall 1 40.16 7.00 281.12
Less V -1.0 5.00 2.00 -10.00
Less D2 -3.0 2.50 7.00 -52.50
Less D1 -2.0 3.00 7.00 -42.00
Truss Area
Floor 1 62.42 60.67 3787.02
Skarting 1 246.18 246.18

S. Total 15214.64 Sft


8.2 Supplying and fixing 13 mm thick
Granite on 20 mm thick c/s mortar
(1:4) on staircase, steps, floors,
walls etc. with cutting, grooving,
rubbing, washing with oxalic acid
and wax polish etc. all complete

FIRST BASEMENT
STAIRCASE
Landing 1 10.92 5.75 62.79
Riser 22 5.00 0.50 55.00
Tread 20 5.00 1.00 100.00
Slab 1 10.92 5.75 62.79
Skarting 1 44.84 44.84
L. Rest Room
Basin Counter 1 7.83 2.00 15.66
Counter Patty 1 9.83 9.83
G. Rest Room
Basin Counter 1 7.67 2.00 15.34
Counter Patty 1 7.67 7.67
SECOND BASEMENT
GROUND FLOOR
STAIRCASE -1
Landing 1 10.92 5.75 62.79
Riser 22 5.00 0.50 55.00
Tread 20 5.00 1.00 100.00
Slab 1 10.92 5.75 62.79

Estimated by: Checked by: Approved by:


25 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
Skarting 1 44.84 44.84
STAIRCASE -2
Riser 9 6.17 0.50 27.77
Tread 8 6.17 1.00 49.36
Floor 1 6.17 8.08 49.85
Skarting 1 34.66 34.66
FIRST FLOOR
STAIRCASE
Landing 1 10.92 5.75 62.79
Riser 22 5.00 0.50 55.00
Tread 20 5.00 1.00 100.00
Slab 1 10.92 5.75 62.79
Skarting 1 44.84 44.84

S. Total 1186.40 Sft


8.3 Carpet Works.
GROUND FLOOR
STAGE Floor 1 171.57 area 171.57
Dance Floor
Floor 1 372.35 area 372.35
FIRST FLOOR
Confrence Hall A
Floor 1 617.92 area 617.92
Confrence Hall B
Floor 1 858.03 area 858.03
Confrence Hall C
Floor 1 355.44 area 355.44

S. Total 2375.31 Sft

8.4 IPS Flooring works.(n 3mm thick


fine cement smoothening works) Same as carpet area 2375.31

S. Total 2375.31 Sft


9 Painting works.

Estimated by: Checked by: Approved by:


26 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
9.1 Supplying and applying two coats
of plastic emulsion paint with
primar base with good finishing as
per instructions and specifications
all complete (inner suface)

Plaster area ( I/S ) 1 13472.67 Area 13472.67


1st basement, Celing area 1 3978.67 Area 3978.67
G/F Celing area 1 6076.66 Area 6076.66
1st F. Celing area 1 4073.68 Area 4073.68
Top F. Celing area 1 659.07 Area 659.07
Truss Celing area 1 5680.53 Area 5680.53

S. Total 33941.28 Sft


9.2 Supplying and applying weather
proof Apex paint two coat with
astar with good finishing as per
instructions and specifications all
complete (Exterior surfaces)

Plaster area ( O/S ) 1 9062.25 Area 9062.25

S. Total 9062.25 Sft


9.3 Supplying and applying 2mm thick
plain white putty plaster on walls,
ceilings etc. in perfect line and level
as per instructions and
specifications all complete

Plaster area ( I/S ) or ( O/S ) 1 43003.53 Area 43003.53

S. Total 43003.53 Sft


10 Stainless steel works: Supplying
and fixing stainless steel staircase
railing of height upto 0.9m, hand
rail of 50mm dia , balusters 50mm
dia in 2 m distance and three line of
25mm dia intermediate rails in
between stair steps/ floors and top
rail with painting all complete

Staircase, Railing
1st Basement Floor 1 25.00 25.00
G/Floor 1 25.00 25.00
" 2 9.50 19.00
1st Floor 1 25.00 25.00
Parking Area

Estimated by: Checked by: Approved by:


27 of 92

QUANTITY ESTIMATE
Client :-
Project :- Commercial Building
Location :-Sanepa
S.No. Description of works No. Length Breadth Height Quantity Unit
1st Basement Floor 1 190.25 190.25

S. Total 284.25 Rft


11 Supplying and fitting Designed
Gypsum Board False Ceiling on
iron angle frame (design approved
by project engineer) all complete

G/F Celing area 1 6076.66 Area 6076.66


1st F. Celing area 1 4073.68 Area 4073.68
Top F. Celing area 1 659.07 Area 659.07
Truss Celing area 1 3787.02 Area 3787.02

S. Total 21894.65 Sft

Estimated by: Checked by: Approved by:


28 of 92

Remarks

Estimated by: Checked by: Approved by:


29 of 92

Remarks

Estimated by: Checked by: Approved by:


30 of 92

Remarks

Estimated by: Checked by: Approved by:


31 of 92

Remarks

Estimated by: Checked by: Approved by:


32 of 92

Remarks

3730.76

Estimated by: Checked by: Approved by:


33 of 92

Remarks

Estimated by: Checked by: Approved by:


34 of 92

Remarks

Estimated by: Checked by: Approved by:


35 of 92

Remarks

Estimated by: Checked by: Approved by:


36 of 92

Remarks

Estimated by: Checked by: Approved by:


37 of 92

Remarks

Estimated by: Checked by: Approved by:


38 of 92

Remarks

Estimated by: Checked by: Approved by:


39 of 92

Remarks

Estimated by: Checked by: Approved by:


40 of 92

Remarks

2381.24

Estimated by: Checked by: Approved by:


41 of 92

Remarks

Estimated by: Checked by: Approved by:


42 of 92

Remarks

Estimated by: Checked by: Approved by:


43 of 92

Remarks

Estimated by: Checked by: Approved by:


44 of 92

Remarks

Estimated by: Checked by: Approved by:


45 of 92

Remarks

Estimated by: Checked by: Approved by:


46 of 92

Remarks

Estimated by: Checked by: Approved by:


47 of 92

Remarks

Estimated by: Checked by: Approved by:


48 of 92

Remarks

Estimated by: Checked by: Approved by:


49 of 92

Remarks

Estimated by: Checked by: Approved by:


50 of 92

Remarks

Estimated by: Checked by: Approved by:


51 of 92

Remarks

Estimated by: Checked by: Approved by:


52 of 92

Remarks

Estimated by: Checked by: Approved by:


53 of 92

Remarks

Estimated by: Checked by: Approved by:


54 of 92

Remarks

Estimated by: Checked by: Approved by:


55 of 92

Client :-
Project :- Commercial Building
Location :-Sanepa

ABSTRACT OF COST
Item Rate Amount
Description of Works Unit Quantity
No. (NPR) (NPR)
1 Earth work.
1.1 Site clearence works: Clearing the site with cutting
grass, levelling humps, uprootings and clearing
surface grass upto 15 cms and disposing in
Sft 12,962.60 3.72 48,220.87
specified places all complete as per instructions of
site engineer

1.2 Earthwork in excavation of foundation in Boulder


mix soil up to size 30 cms, lead 10m and lift 2.0 m Cft 13,592.26 15.57 211,631.55
all complete
1.3 Earth work in filling in foundation, floors etc in 15
cms layers and compaction by water spray all Cft 9,050.75 9.50 85,982.12
complete
1.4 Soling Works: Boulder soling with sand
compaction in foundations, floors etc all complete Sft - 140.00 -

1.5 Soling Works: First class brick soling (flat) with


sand compaction in foundations, floors etc all Sft 9,632.75 122.32 1,178,277.89
complete

2 Concrete Works
2.1
Plain cement concret PCC(1:3:6) in foundation,
floors etc. with cement, sand and crussed
aggregate of 10 mm to 38mm gauge including
Cft 2,408.19 324.23 780,806.58
mixing with mixture machine & compaction by
vibrator, laying in line & level with curing all type
of works complete as per specifications &
instructions
2.2 RCC work: RCC work in PCC (1:1.5:3) in
foundation, floors, columns, beams, slabs etc. with
cement,sand and crussed aggregate of 10 mm to
38mm gauge including mixing with mixture
machine & compaction by vibrator, laying in line Cft 12,973.51 500.00 6,486,754.26
& level with curing all type of works complete as
per specifications & instructions

3 Tor /TMT Reinforcement work for R.C.C work


including supply, straighting, cutting, bending,
binding and laying of different diameter steel rod
in all types of R.C.C work as per design Kg 71,687.00 112.00 8,028,943.78
,drawing ,specification and instruction all
complete work

4 Form work for Foundation, beams, column, slab


etc. all types of concrete with 19 mm plyboard
with steel props centering & shuttering including
promping wedging, scafolding, proping, stagging
inclusive of utilization till the support is fully Sft 31,685.17 70.00 2,217,961.97
unyielding net as per design ,drawing specification
and instruction
56 of 92

Client :-
Project :- Commercial Building
Location :-Sanepa

ABSTRACT OF COST
Item Rate Amount
Description of Works Unit Quantity
No. (NPR) (NPR)
5 First class local chimney made exposed fair face
brick wall work in cement sand mortar (1:4)
superstructure in perfect line and level including
wetting the brick, packing the joints and curing all
types of works as per specification and instruction
by Engineer (fair faced brick work)

5.1 Brick work 9" th ( c:s 1:6 ) Cft 6,601.81 411.50 2,716,643.69
5.2 Brick work 4" th ( c:s 1:4 ) Sft 2,296.89 290.00 666,099.46
5.3 Cement Board partations walls. Sft 2,697.36 225.00 606,905.01
6 12.5 / 20 mm thick (1:4) c/s plaster work on
floors, walls etc. with proper curing all complete

6.1 Plaster work External ( c:s 1:4) Sft 9,062.25 45.00 407,801.22
6.2 Plaster work Internal ( c:s 1:4) Sft 13,472.67 38.00 511,961.60
7 Wood Works.
7.1 Supplying and fixing ready made solid core panel
shutter for doors, 32mm thick with necessary
tower bolts, hinges, handle, screws, locking set all
compete work as per specification and instructions
Sft 762.50 850.00 648,125.00
(Frame less door shutter works)

7.2
Supplying and fixing ready made UPVC frame
for windows, 8mm thick single layer glass with
necessary tower bolts, hinges, handle, screws, Sft 3,341.56 650.00 2,172,015.11
locking set all compete work as per specification
and instructions
7.3 Supplying and fixing ready made UPVC frame
for windows, 8mm thick Double layer glass with
necessary tower bolts, hinges, handle, screws, Sft
1,200.00 -
locking set all compete work as per specification
and instructions

7.4 Supplying & fixing Structure glazing with


laminated safety glass 6.38 mm thick all complete Sft - 3,500.00 -
(Toughened glass)
8 Flooring works.
8.1 Supplying and fixing Ceramic glazed tiles (8"x8",
8"x6") in floors, walls etc.on toilets 1:4 c/s mortar Sft 15,214.64 300.00
all complete
4,564,392.84
8.2 Supplying and fixing 13 mm thick Granite on 20
mm thick c/s mortar (1:4) on staircase, steps,
floors, walls etc. with cutting, grooving, rubbing, Sft 1,186.40 550.00
washing with oxalic acid and wax polish etc. all
complete
652,519.23
8.3 Carpet Works. Sft 2,375.31 300.00 712,593.00
8.4 IPS Flooring works.(n 3mm thick fine cement
smoothening works) Sft 2,375.31 72.58 172,400.00

9 Painting works.
57 of 92

Client :-
Project :- Commercial Building
Location :-Sanepa

ABSTRACT OF COST
Item Rate Amount
Description of Works Unit Quantity
No. (NPR) (NPR)
9.1 Supplying and applying two coats of plastic
emulsion paint with primar base with good
finishing as per instructions and specifications all Sft 33,941.28 29.00 984,297.23
complete (inner suface)
9.2
Supplying and applying weather proof Apex paint
two coat with astar with good finishing as per Sft 9,062.25 34.00 308,116.48
instructions and specifications all complete
(Exterior surfaces)
9.3 Supplying and applying 2mm thick plain white
putty plaster on walls, ceilings etc. in perfect line
and level as per instructions and specifications all Sft 43,003.53 14.00 602,049.46
complete
10 Stainless steel works: Supplying and fixing
stainless steel staircase railing of height upto 0.9m,
hand rail of 50mm dia , balusters 50mm dia in 2 m
distance and three line of 25mm dia intermediate Rft 284.25 1,524.39 433,307.93
rails in between stair steps/ floors and top rail with
painting all complete

11 Supplying and fitting Designed Gypsum Board


False Ceiling on iron angle frame (design Sft 21,894.65 100.00 2,189,464.50
approved by project engineer) all complete

12 Boundary wall works


12.1 Boundary wall works: First class local chimney
made brick wall work in cement sand mortar (1:5)
foundation and superstructure in perfect line and
level including wetting the brick, Plaster, paint
both face of wall, RCC band on each 3ft. vertical
height with sufficient curing and MS grill fencing Job
(4ft.) as per drawings all types of works as per
specification and instruction by Engineer

Total amount 37,387,270.78


Sanitary and plumbing work ( 6% civil of cost ) 2,243,236.25
Electrical work ( 6% civil of cost ) 2,243,236.25
Mechannical and Fire fighting works (8% civil of cost ) 2,990,981.66
HVAC works (12% civil of cost ) 4,486,472.49
Interior design works ( 40% civil of cost ) 14,954,908.31
Land development works ( 5% civil of cost ) 1,869,363.54
Total amount 66,175,469.29
VAT 13 % 8,602,811.01
Sub Total amount 74,778,280.30
58 of 92

BSTRACT OF COST

Remarks
59 of 92

BSTRACT OF COST

Remarks

23,947,990.01
60 of 92

BSTRACT OF COST

Remarks
Bill of Quantity (BoQ)
Client :-
Project :- Commercial Building
Location :-Sanepa
Rate Amount
Item
Description of Works Unit Quantity
No. (NPR) In Figure (NPR)

1 Earth work.
Site clearence works: Clearing the site with
cutting grass, levelling humps, uprootings and
clearing surface grass upto 15 cms and disposing
1.1 Sft 12962.60
in specified places all complete as per
instructions of site engineer

Earthwork in excavation of foundation in


1.2 Boulder mix soil up to size 30 cms, lead 10m Cft 13592.26
and lift 2.0 m all complete
Earth work in filling in foundation, floors etc in
1.3 15 cms layers and compaction by water spray all Cft 9050.75
complete
Soling Works: Boulder soling with sand
1.4 compaction in foundations, floors etc all Sft 0.00
complete
Soling Works: First class brick soling (flat) with
1.5 sand compaction in foundations, floors etc all Sft 9632.75
complete
2 Concrete Works
Bill of Quantity (BoQ)
Client :-
Project :- Commercial Building
Location :-Sanepa
Plain cement concret PCC(1:3:6) in foundation,
floors etc. with cement, sand and crussed
aggregate of 10 mm to 38mm gauge including
mixing with mixture machine & compaction by
2.1 vibrator, laying in line & level with curing all Cft 2408.19
type of works complete as per specifications &
instructions

RCC work: RCC work in PCC (1:1.5:3) in


foundation, floors, columns, beams, slabs etc.
with cement,sand and crussed aggregate of 10
mm to 38mm gauge including mixing with
2.2 mixture machine & compaction by vibrator, Cft 12973.51
laying in line & level with curing all type of
works complete as per specifications &
instructions

Tor /TMT Reinforcement work for R.C.C work


including supply, straighting, cutting, bending,
binding and laying of different diameter steel rod
3 in all types of R.C.C work as per design Kg
,drawing ,specification and instruction all
complete work
Bill of Quantity (BoQ)
Client :-
Project :- Commercial Building
Location :-Sanepa
Form work for Foundation, beams, column, slab
etc. all types of concrete with 19 mm plyboard
with steel props centering & shuttering including
promping wedging, scafolding, proping, stagging
4 inclusive of utilization till the support is fully Sft 31685.17
unyielding net as per design ,drawing
specification and instruction

First class local chimney made exposed fair face


brick wall work in cement sand mortar (1:4)
superstructure in perfect line and level including
wetting the brick, packing the joints and curing
5 all types of works as per specification and
instruction by Engineer (fair faced brick work)

5.1 Brick work 9" th ( c:s 1:6 ) Cft 6601.81


5.2 Brick work 4" th ( c:s 1:4 ) Sft 2296.89
12.5 / 20 mm thick (1:4) c/s plaster work on
6 floors, walls etc. with proper curing all complete

6.1 Plaster work External ( c:s 1:4) Sft 9062.25


6.2 Plaster work Internal ( c:s 1:4) Sft 13472.67
7 Wood Works.
Bill of Quantity (BoQ)
Client :-
Project :- Commercial Building
Location :-Sanepa
Supplying and fixing ready made solid core
panel shutter for doors, 32mm thick with
necessary tower bolts, hinges, handle, screws,
7.1 locking set all compete work as per specification Sft 762.50
and instructions (Frame less door shutter works)

Supplying and fixing ready made UPVC frame


for windows, 8mm thick single layer glass with
necessary tower bolts, hinges, handle, screws,
7.2 Sft 3341.56
locking set all compete work as per specification
and instructions

Supplying and fixing ready made UPVC frame


for windows, 8mm thick Double layer glass
with necessary tower bolts, hinges, handle,
7.3 Sft 0.00
screws, locking set all compete work as per
specification and instructions

8 Flooring works. Sft


Supplying and fixing Ceramic glazed tiles
8.1 (8"x8", 8"x6") in floors, walls etc.on toilets 1:4 15214.64
c/s mortar all complete
Supplying and fixing 13 mm thick Granite on 20
mm thick c/s mortar (1:4) on staircase, steps,
floors, walls etc. with cutting, grooving, rubbing, Sft
8.2 1186.40
washing with oxalic acid and wax polish etc. all
complete

8.3 Carpet Works. Sft 2375.31


IPS Flooring works.(n 3mm thick fine cement
8.4 smoothening works) Sft 2375.31
Bill of Quantity (BoQ)
Client :-
Project :- Commercial Building
Location :-Sanepa
9 Painting works. Sft
Supplying and applying two coats of plastic
emulsion paint with primar base with good
9.1 finishing as per instructions and specifications 33941.28
all complete (inner suface)

Supplying and applying weather proof Apex


paint two coat with astar with good finishing as
9.2 per instructions and specifications all complete Sft 9062.25
(Exterior surfaces)

Supplying and applying 2mm thick plain white


putty plaster on walls, ceilings etc. in perfect line
9.3 and level as per instructions and specifications Sft 43003.53
all complete

Stainless steel works: Supplying and fixing


stainless steel staircase railing of height upto
0.9m, hand rail of 50mm dia , balusters 50mm
10 dia in 2 m distance and three line of 25mm dia Sft 284.25
intermediate rails in between stair steps/ floors
and top rail with painting all complete

Supplying and fitting Designed Gypsum Board


False Ceiling on iron angle frame (design
11 approved by project engineer) all complete Rft 21894.65
Bill of Quantity (BoQ)
Client :-
Project :- Commercial Building
Location :-Sanepa
Boundary wall works: First class local chimney
made brick wall work in cement sand mortar
(1:5) foundation and superstructure in perfect
line and level including wetting the brick,
Plaster, paint both face of wall, RCC band on
each 3ft. vertical height with sufficient curing
12 and MS grill fencing (4ft.) as per drawings all Job
types of works as per specification and
instruction by Engineer

TOTAL CONTRACT AMOUNT (without VAT and with Overhead) = Rs.


In words :

Name of Firm :-
Name of Proprietor :-
Regtd. No.
PAN No.:-
VAT Regd Date:-
Address :-
Contact No:-
uantity (BoQ)

Amount
Remarks
In Words (NPR)
uantity (BoQ)
uantity (BoQ)
uantity (BoQ)
uantity (BoQ)
uantity (BoQ)

-------------------------------
Contractor's Signature
5.1 Brick work 9" th ( c:s 1:6 )
WALL, UP TO PLINTH Lvl.
Grid - A ( 1 - 5 ) 1 58.15 0.75 3.41 148.72
Grid - B ( 1 - 5 ) 1 58.15 0.75 3.41 148.72
Grid - C ( 1 - 5 ) 1 58.15 0.75 3.41 148.72
Grid - D ( 1 - 5 ) 1 58.15 0.75 3.41 148.72
Grid - E ( 1 - 5 ) 1 56.98 0.75 3.41 145.73
Grid - 1 ( A - E ) 1 56.32 0.75 3.41 144.04
Grid - 2 ( A - E ) 1 56.32 0.75 3.41 144.04
Grid - 3 ( A - E ) 1 56.32 0.75 3.41 144.04
Grid - 4 ( A - E ) 1 56.32 0.75 3.41 144.04
Grid - 5 ( A - E ) 1 56.32 0.75 3.41 144.04

Grid - E ( 6 - 8 ) 1 31.74 0.75 3.41 81.18


Grid - F ( 6 - 13 ) 1 82.65 0.75 3.41 211.38
Grid - G ( 6 - 13 ) 1 72.56 0.75 3.41 185.57
Grid - 6 ( E - G ) 1 25.49 0.75 3.41 65.19
Grid - 7 ( E - G ) 1 25.49 0.75 3.41 65.19
Grid - 9 ( E - G ) 1 25.50 0.75 3.41 65.22
Grid - 10 ( F - G ) 1 14.91 0.75 3.41 38.13
Grid - 11 ( E - G ) 1 25.49 0.75 3.41 65.19
Grid - 12 ( E - G ) 1 25.49 0.75 3.41 65.19
Grid - 13 ( E - G ) 1 30.58 0.75 3.41 78.21
FIRST BASEMENT
Grid - 1 ( A - D ) 1 14.83 0.75 9.50 105.66
Less D3 -1 4.00 0.75 7.50 -22.50
Staircase, Wall 1 14.25 9.50 135.38
Staircase, Wall 1 10.67 0.75 9.50 76.02
" 1 15.42 0.75 9.50 109.87
L. Rest Room
Wall 1 60.16 0.75 9.50 428.64
Less V -1 7.67 0.75 2.00 -11.51
Less D1 -1 3.00 0.75 7.00 -15.75
Wall 1 11.09 10.58 117.33
Wall 3 8.91 10.58 282.80
Wall 1 0.75 10.58 7.94
Less D2 -4 2.50 7.00 -70.00
Less D1 -1 3.00 7.00 -21.00
G. Rest Room
Wall 2 15.50 0.75 9.50 220.88
Less V -1 7.50 0.75 2.00 -11.25
Less D1 -1 3.00 0.75 7.00 -15.75
Less D -1 2.50 0.75 7.00 -13.13
Wall 1 30.92 10.58 327.13
Less D1 -1 3.00 7.00 -21.00
Wall 2 9.00 10.58 190.44
Less D2 -2 2.50 7.00 -35.00
Chainging Room
Wall 1 27.75 0.75 9.50 197.72
Wall 2 10.25 10.58 216.89
Wall 1 11.08 10.58 117.23
Wall 1 6.50 10.58 68.77
Less D1 -2 3.00 7.00 -42.00
Less D2 -1 2.50 7.00 -17.50
GROUND FLOOR
( Grid A ) W5 1 58.16 14.00 814.24
( Grid 1 ) W5 1 52.33 14.00 732.62
( Grid 1 ) D3 1 4.00 14.00 56.00
( Grid 5 ) W5 1 56.33 14.00 788.62
Grid - E ( 6 - 9 ) 1 31.75 0.75 14.00 333.38
Less D3 -1 4.00 0.75 8.00 -24.00
Less W2 -2 7.00 0.75 4.50 -47.25
Grid - 6 ( E - G ) 1 25.42 0.75 14.00 266.91
Less W1 -1 10.50 0.75 4.50 -35.44
Less W2 -1 7.00 0.75 4.50 -23.63
Less W3 -1 3.00 0.75 4.50 -10.13
Grid - G ( 6 - 13 ) 1 72.40 0.75 14.00 760.20
Less D0 -1 6.00 0.75 8.00 -36.00
Less SD -1 7.00 0.75 8.00 -42.00
Grid - 13 ( E - G ) 1 32.75 0.75 14.00 343.88
Less W4 -3 2.00 0.75 4.50 -20.25
Dance Floor
Wall 1 55.42 14.00 775.88
Less D1 -1 3.00 7.00 -21.00
Less SD -1 5.00 7.00 -35.00
Staircase
Wall 1 20.42 14.00 285.88
Wall 1 23.50 0.75 14.00 246.75
Wall 2 14.92 0.75 14.00 313.32
Changing + Bath Room
Wall 1 9.50 14.00 133.00
Wall 3 4.33 14.00 181.86
Less D2 -2 2.50 7.00 -35.00
FIRST FLOOR
( Grid A ) W5 1 58.16 9.83 571.71
( Grid 1 ) W5 1 14.83 9.83 145.78
Staircase
Wall 1 20.42 0.75 9.83 150.55
Wall 1 21.17 0.75 9.83 156.08
Wall 1 17.17 0.75 9.83 126.59
Less D3 -3 4.00 0.75 8.00 -72.00
L. + G. Rest Room
Wall 1 26.59 9.83 261.38
Less D2 -2 2.50 7.00 -35.00
Wall 1 16.83 0.75 9.83 124.08
Wall 2 14.92 0.75 9.83 220.00
Less V -2 5.00 0.75 2.00 -15.00
Wall 1 21.25 10.58 224.83
Less D2 -3 2.50 7.00 -52.50
Confrence Hall
Wall 1 70.50 0.75 9.83 519.76
Less W4 -6 2.00 0.75 4.50 -40.50
Less W -1 7.00 0.75 4.50 -23.63
Truss
Wall 1 194.00 10.58 2052.52

S. Total 14705.03 Cft


2381.24

9" Wall

9" Wall

4" Wall

9" Wall

9" Wall

9" Wall

9" Wall

9" Wall

Cement B.

Cement B.

Cement B.

Cement B.

Cement B.
9" Wall

9" Wall

9" Wall

9" Wall

4" Wall

4" Wall

Cement B.

Cement B.

9" Wall

4" Wall

4" Wall

4" Wall

4" Wall

4" Wall

9" Wall

9" Wall

9" Wall

9" Wall

9" Wall

9" Wall

9" Wall

9" Wall

9" Wall

9" Wall

9" Wall

9" Wall

4" Wall

4" Wall

4" Wall
4" Wall

9" Wall

9" Wall

4" Wall

4" Wall

4" Wall

9" Wall

9" Wall

9" Wall

9" Wall

4" Wall

4" Wall

9" Wall

9" Wall
9" Wall

Cement B.

Cement B.

9" Wall

9" Wall

9" Wall

Cement B.
5.1 Door shutter
FIRST BASEMENT
Grid - 1 ( A - D )
D3 1 4.00 7.50 30.00
L. Rest Room
D1 1 3.00 7.00 21.00
D2 4 2.50 7.00 70.00
D1 1 3.00 7.00 21.00
G. Rest Room
D1 1 3.00 7.00 21.00
D 1 2.50 7.00 17.50
D1 1 3.00 7.00 21.00
D2 2 2.50 7.00 35.00
Chainging Room
D1 2 3.00 7.00 42.00
D2 1 2.50 7.00 17.50
GROUND FLOOR
D3 1 4.00 14.00 56.00
Grid - E ( 6 - 9 )
D3 1 4.00 8.00 32.00
Grid - G ( 6 - 13 )
D0 1 6.00 8.00 48.00
SD 1 7.00 8.00 56.00
Dance Floor
D1 1 3.00 7.00 21.00
SD 1 5.00 7.00 35.00
Changing + Bath Room
D2 2 2.50 7.00 35.00
FIRST FLOOR
Staircase
D3 3 4.00 8.00 96.00
L. + G. Rest Room
D2 2 2.50 7.00 35.00
D2 3 2.50 7.00 52.50

S. Total 762.50 Sft


5.2 Window shutter
FIRST BASEMENT
L. Rest Room
V 1 7.67 0.75 2.00 11.51
G. Rest Room
V 1 7.50 0.75 2.00 11.25
GROUND FLOOR
( Grid A ) W5 1 58.16 14.00 814.24
( Grid 1 ) W5 1 52.33 14.00 732.62
( Grid 1 ) D3 1 4.00 14.00 56.00
( Grid 5 ) W5 1 56.33 14.00 788.62
Grid - E ( 6 - 9 )
W2 2 7.00 4.50 63.00
Grid - 6 ( E - G )
W1 1 10.50 4.50 47.25
W2 1 7.00 4.50 31.50
W3 1 3.00 4.50 13.50
Grid - 13 ( E - G )
W4 3 2.00 4.50 27.00
FIRST FLOOR
( Grid A ) W5 1 58.16 9.83 571.71
( Grid 1 ) W5 1 14.83 9.83 145.78
L. + G. Rest Room
V 2 5.00 2.00 20.00

S. Total 3333.98 Sft


5.3 Cement Board partations.
FIRST BASEMENT
L. Rest Room
Wall 1 11.09 10.58 117.33
Wall 3 8.91 10.58 282.80
Wall 1 0.75 10.58 7.94
Less D2 -4 2.50 7.00 -70.00
Less D1 -1 3.00 7.00 -21.00
G. Rest Room
Wall 2 9.00 10.58 190.44
Less D2 -2 2.50 7.00 -35.00
GROUND FLOOR
FIRST FLOOR
L. + G. Rest Room
Wall 1 21.25 10.58 224.83
Less D2 -3 2.50 7.00 -52.50
Confrence Hall
Truss
Wall 1 194.00 10.58 2052.52

S. Total 2697.36 Sft


Cement B.

Cement B.

Cement B.

Cement B.

Cement B.

Cement B.

Cement B.
Cement B.

Cement B.

Cement B.
S.No. Description of works No. Length Breadth Height Quantity Unit Remarks

8.1 Tiles works.


FIRST BASEMENT
L. Rest Room
Floor 1 107.04 area 107.04
Wall 1 44.42 7.00 310.94
Floor 1 27.95 area 27.95
Wall 1 22.25 7.00 155.75
Floor 3 16.24 area 48.72
Wall 3 16.50 7.00 346.50
Floor 1 25.62 area 25.62
Wall 1 22.58 7.00 158.06
Less D1 -1.5 3.00 7.00 -31.50
Less D2 -4.0 2.50 7.00 -70.00
Less V -0.5 7.67 2.00 -7.67
G. Rest Room
Floor 1 181.79 area 181.79
Wall 1 64.08 7.00 448.56
Floor 1 18.26 area 18.26
Wall 1 17.33 7.00 121.31
Floor 2 17.59 area 35.18
Wall 2 17.08 7.00 239.12
Less D1 -1.5 3.00 7.00 -31.50
Less D2 -2.0 2.50 7.00 -35.00
Less V -0.5 7.67 2.00 -7.67
Chainging Room
Floor 2 13.25 15.75 417.38
Skarting 1 58.00 58.00
Toilet, Floor 1 4.00 5.50 22.00
Wall 1 19.00 7.00 133.00
Less D2 -0.5 2.50 7.00 -8.75
SECOND BASEMENT
GROUND FLOOR
Kitchen Hall
Floor 1 35.17 27.42 964.36
Wall 1 125.18 12.00 1502.16
Less W2 -1.5 7.00 4.50 -47.25
Less D3 -0.5 4.00 8.00 -16.00
Less W1 -0.5 10.50 4.50 -23.63
Less W3 -0.5 3.00 4.50 -6.75
Stage for Reception
BATH ROOM Floor 1 5.00 4.33 21.65
Wall 1 18.66 7.00 130.62
Less D2 -0.5 2.50 7.00 -8.75
Lobby
Floor 1 437.99 area 437.99
Skarting 1 87.42 87.42
Toilet
Floor 1 8.58 3.42 29.34
Wall 1 24.00 7.00 168.00
Less D1 -0.5 3.00 7.00 -10.50
Dining Hall
Floor 1 62.50 60.67 3791.88
Skarting 1 246.34 246.34
FIRST FLOOR
L. + G. Rest Room
Floor 1 3.17 5.42 17.18
Wall 1 17.18 7.00 120.26
Floor 2 3.25 6.00 39.00
Wall 2 18.50 7.00 259.00
Floor 1 72.60 Area 72.60
Wall 1 36.33 7.00 254.31
Floor 1 4.50 8.92 40.14
Wall 1 26.84 7.00 187.88
Floor 1 14.08 6.00 84.48
Wall 1 40.16 7.00 281.12
Less V -1.0 5.00 2.00 -10.00
Less D2 -3.0 2.50 7.00 -52.50
Less D1 -2.0 3.00 7.00 -42.00
Truss Area
Floor 1 62.42 60.67 3787.02
Skarting 1 246.18 246.18

S. Total 15214.64 Sft


8.2 Granites works.
FIRST BASEMENT
STAIRCASE
Landing 1 10.92 5.75 62.79
Riser 22 5.00 0.50 55.00
Tread 20 5.00 1.00 100.00
Slab 1 10.92 5.75 62.79
Skarting 1 44.84 44.84
L. Rest Room
Basin Counter 1 7.83 2.00 15.66
Counter Patty 1 9.83 9.83
G. Rest Room
Basin Counter 1 7.67 2.00 15.34
Counter Patty 1 7.67 7.67
SECOND BASEMENT
GROUND FLOOR
STAIRCASE -1
Landing 1 10.92 5.75 62.79
Riser 22 5.00 0.50 55.00
Tread 20 5.00 1.00 100.00
Slab 1 10.92 5.75 62.79
Skarting 1 44.84 44.84
STAIRCASE -2
Riser 9 6.17 0.50 27.77
Tread 8 6.17 1.00 49.36
Floor 1 6.17 8.08 49.85
Skarting 1 34.66 34.66
FIRST FLOOR
STAIRCASE
Landing 1 10.92 5.75 62.79
Riser 22 5.00 0.50 55.00
Tread 20 5.00 1.00 100.00
Slab 1 10.92 5.75 62.79
Skarting 1 44.84 44.84

S. Total 1186.40 Sft


8.3 Carpet works.
FIRST BASEMENT
SECOND BASEMENT
GROUND FLOOR
STAGE Floor 1 171.57 area 171.57
Dance Floor
Floor 1 372.35 area 372.35
FIRST FLOOR
Confrence Hall A
Floor 1 617.92 area 617.92
Confrence Hall B
Floor 1 858.03 area 858.03
Confrence Hall C
Floor 1 355.44 area 355.44

S. Total 2375.31 Sft


Granite 2 Tile 1 Carpet 3 IPS 4

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile
Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile

Tile
Granite
Granite
Granite
Granite
Granite

Granite
Granite

Granite
Granite

Granite
Granite
Granite
Granite
Granite

Granite
Granite
Granite
Granite

Granite
Granite
Granite
Granite
Granite

Carpet