You are on page 1of 1

PROPOSED CALENDAR

Activities Output Note/s


NOVEMBER

2nd research and brainstroming on concepts, site criteria, 1. initial site criteria
planning considerations, etc.
week 2. what concepts to apply
3. what to break, speculate,
innovate

3rd finalize site criteria and do the selection process, more 1. additional concepts
research
outputs can be sketches and
drafts only
week 2. final criteria

3. site analysis
4. rough SDP, massing,
zoning, paths

4th site development and analysis 1. scaled massing of SDP diagrams should be "design
board material"
week 2. formal SDP diagrams e.g.
color-coded massing, traffic
flows, form evolution if any

DECEMBER

1st discuss space programming and requirements.


Determine the concept manifestations in plans
1. floor layouts of major
buildings
just drafts and sketches

week

2nd Finalize floor plans 1. final CAD plans outputs to be exported to


SketchUp for 3D modeling
week

3rd decide façade treatments and concept manifestations 1. final 3D model of the site
in elevations/sections if any and buildings
areas to be sown in boards,
in diagrams, concepts
week should be detailed enough
to be "board material"
2. png/pdf/psd files of
elevation and sections to be
shown in boards

4th (THIS IS CHRISTMAS SEASON) this can be a grace period


should we need to extend
week our working days, hopefully
not ahahaaha

JANUARY

1st finalize EVERYTHING


board layouts
2 design boards, A4 project
brief
week render perspectives, create axonometric diagrams,
anything board stuff
work on the A4 project brief.

2ND DEADLINE

week

You might also like