MODEL : BELLIS AZALEA EDELWEISS DAFFODIL CATTLEYA
AREA : 56.00 SQ.M. 66.00 SQ.M. 64.00 SQ.M. 70.00 SQ.M. 84.00 SQ.M.
CONTRACT AMOUNT PER SQ.M. : PHP 5,900.00 PHP 5,900.00 PHP 5,900.00 PHP 5,900.00 PHP 5,900.00
TOTAL CONTRACT AMOUNT : PHP 330,400.00 PHP 389,400.00 PHP 377,600.00 PHP 413,000.00 PHP 495,600.00
CONTRACT DURATION : 3.00 month/s 3.50 month/s 4.00 month/s 4.50 month/s 5.00 month/s
AVERAGE NO. OF MANPOWER : 8 8 8 8 8
AVERAGE RATE : PHP 529.49 PHP 534.89 PHP 453.85 PHP 441.24 PHP 476.54
FLORA
87.00 SQ.M.
PHP 5,700.00
PHP 495,900.00
6.00 month/s
8
PHP 397.36
FLORA
87.00 SQ.M.
PHP 5,400.00
PHP 469,800.00
6.00 month/s
8
PHP 376.44
PROJECT: DEVV - FSTN PROJECT:
LOCATION: LOCATION
AMOUNT PER SQ.M.: 4,400.00 AMOUNT
AREA: 70.00 AREA:
TCP: 308,000.00 TCP:
EARTHWORKS 2.30% WT
Trimming of Wall Footing 0.50%
Backfilling and Compaction 0.80%
Septic Tank Fabrication 1.00%
STRUCTURAL 42.00%
Column Footing
Rebars (Fabrication/Installation) 0.50%
Concrete Works 1.00%
Wall Footing
Rebars (Fabrication/Installation) 0.50%
Concrete Works 1.00%
Column ( Ftg to 2F)
Rebars (Fabrication/Installation) 1.00%
Formworks (Fabrication / Installation /Dismantling) 1.00%
Concrete Works 1.50%
Beam
Rebars (Fabrication/Installation) 1.50%
Formworks (Fabrication / Installation /Dismantling) 1.00%
Concrete Works 1.50%
Column ( 2F to Roof Beam)
Rebars (Fabrication/Installation) 2.00%
Formworks (Fabrication / Installation /Dismantling) 1.50%
Concrete Works 1.50%
Roof Beam
Rebars (Fabrication/Installation) 2.00%
Formworks (Fabrication / Installation /Dismantling) 1.50%
Concrete Works 2.00%
Column ( Roof Beam to Parapet)
Rebars (Fabrication/Installation) 2.00%
Formworks (Fabrication / Installation /Dismantling) 1.50%
Concrete Works 1.50%
Second Floor Slab
Rebars (Fabrication/Installation) - One-way Slab 1.00%
Formworks (Fabrication / Installation /Dismantling) 0.25%
Steel Decking Installation 1.00%
Concrete Works 2.50%
Stairs
Rebars (Fabrication/Installation) 0.75%
Formworks (Fabrication / Installation /Dismantling) 1.50%
Concrete Works 1.50%
Slab-on-Fill / Slab-on-Grade
Preparation (Backfilling / Gravel Bedding) 0.25%
Rebar Works 0.75%
Concrete Works 1.50%
Kitchen Counter Top
Rebars (Fabrication/Installation) 0.25%
Formworks (Fabrication / Installation /Dismantling) 0.10%
Concrete Works 1.00%
Laundry Countertop
Rebars (Fabrication/Installation) 0.10%
Formworks (Fabrication / Installation /Dismantling) 0.05%
Concrete Works 0.50%
Erection of Scaffoldings 3.00%
MASONRY WORKS 14.75%
Wall Footing Concrete Hollow Blocks
Reinforcement 0.20%
Installation 0.50%
GF Concrete Hollow Blocks
Reinforcement 0.20%
Installation 1.00%
2F Concrete Hollow Blocks
Reinforcement 0.20%
Installation 1.00%
Parapet Concrete Hollow Blocks
Reinforcement 0.20%
Installation 0.75%
Partition Concrete Hollow Blocks
Reinforcement 0.20%
Installation 1.00%
Plastering (Exterior) 5.00%
Plastering (Interior) 3.00%
Plastering (Parapet/Firewall) 1.50%
ELECTRICAL WORKS 3.25%
Rough-ins
Installation of Electrical Pipes 1.00%
Installation of Electrical Wires & Cables 0.50%
Electrical Fixtures and Equipment
Installation of Panel Box & Circuit Breaker 0.75%
Installation of Convenience Outlet & Switches 1.00%
PLUMBING & SANITARY WORKS 2.35%
Rough-ins
Installation of Sanitary Pipes and Fittings 1.25%
Installation of Water Pipes and Fittings 0.75%
Plumbing Fixtures
Installation of Water Closets 0.10%
Installation of Lavatories 0.10%
Installation of Floor Drains 0.05%
Installation of Shower Heads 0.10%
WOOD WORKS 7.85%
Ceiling
Ceiling Framing (Installation) 1.25%
Ceiling Boards (Installation) 1.50%
Doors and Door Jambs
Door (Installation) 1.00%
Door Jamb (Installation) 1.50%
Cabinet Door (Installation) 1.00%
Cabinet Door Jamb (Installation / Fabrication) 0.75%
Door Knob / Cabinet Handle (Installation) 0.10%
PVC Door and Jamb (Installation) 0.50%
Stair Railings (Wood-Installation) 0.25%
TILE WORKS 5.90%
Waterproofing (CR Second Floor) 0.50%
Floor Tiles
Ground Floor 0.50%
Second Floor 0.50%
CR - Ground Floor 0.25%
CR - Second Floor 0.25%
Balcony 0.20%
Stair 0.20%
Wall Tiles
CR - Ground Floor 1.00%
CR - Second Floor 1.00%
Kitchen Counter Top ( Granite / Tiles ) 0.75%
Wall Cladding 0.75%
RAILINGS 0.85%
Stair Railings
Fabrication 0.35%
Installation 0.50%
Balcony 0.80%
Fabrication 0.58%
Installation 0.22%
ROOFING WORKS
Roof Framing 1.00%
Fabrication/Installation 1.00%
Roof Sheet and Accessories 1.30%
Gutter (Fabrication/Installation) 0.60%
Roof Sheet (Installation) 0.25%
Roofing Accessories (Installation) 0.45%
PAINTING WORKS 14.75%
Exterior Paint
Skimcoating White 1.60%
Sanding 1.30%
Primer 0.70%
Final Painting 0.75%
Interior Paint
Skimcoating Grey 1.25%
Skimcoating White 1.40%
Sanding 1.30%
Primer 0.70%
Final Painting 0.75%
Doors , Jambs, Cabinet Doors & Stair Railings Varnishing
Preparation 2.50%
Final Coating 0.50%
Ceiling
Preparation 1.50%
Final Coating 0.50%
FINISHING WORKS 2.90%
Ground Preparation
Garage
Preparation 0.30%
Rebar Works 0.50%
Concrete Works 0.50%
Laundry
Preparation 0.30%
Rebar Works 0.50%
Concrete Works 0.50%
Punchlisting 0.30%
Total % per week 100.00%
To Date %
PROJECT: DEVV - FSTN PROJECT:
LOCATION: LOCATION:
AMOUNT PER SQ.M.: 4,000.00 AMOUNT PER
AREA: 64.00 AREA:
TCP: 256,000.00 TCP:
ARTHWORKS 2.30% WT
Trimming of Wall Footing 0.50%
Backfilling and Compaction 0.80%
Septic Tank Fabrication 1.00%
TRUCTURAL 42.00%
Column Footing
Rebars (Fabrication/Installation) 0.50%
Concrete Works 1.00%
Wall Footing
Rebars (Fabrication/Installation) 0.50%
Concrete Works 1.00%
Column ( Ftg to 2F)
Rebars (Fabrication/Installation) 1.00%
Formworks (Fabrication / Installation /Dismantling) 1.00%
Concrete Works 1.50%
Beam
Rebars (Fabrication/Installation) 1.50%
Formworks (Fabrication / Installation /Dismantling) 1.00%
Concrete Works 1.50%
Column ( 2F to Roof Beam)
Rebars (Fabrication/Installation) 2.00%
Formworks (Fabrication / Installation /Dismantling) 1.50%
Concrete Works 1.50%
Roof Beam
Rebars (Fabrication/Installation) 2.00%
Formworks (Fabrication / Installation /Dismantling) 1.50%
Concrete Works 2.00%
Column ( Roof Beam to Parapet)
Rebars (Fabrication/Installation) 2.00%
Formworks (Fabrication / Installation /Dismantling) 1.50%
Concrete Works 1.50%
Second Floor Slab
Rebars (Fabrication/Installation) - One-way Slab 1.00%
Formworks (Fabrication / Installation /Dismantling) 0.25%
Steel Decking Installation 1.00%
Concrete Works 2.50%
Stairs
Rebars (Fabrication/Installation) 0.75%
Formworks (Fabrication / Installation /Dismantling) 1.50%
Concrete Works 1.50%
Slab-on-Fill / Slab-on-Grade
Preparation (Backfilling / Gravel Bedding) 0.25%
Rebar Works 0.75%
Concrete Works 1.50%
Kitchen Counter Top
Rebars (Fabrication/Installation) 0.25%
Formworks (Fabrication / Installation /Dismantling) 0.10%
Concrete Works 1.00%
Laundry Countertop
Rebars (Fabrication/Installation) 0.10%
Formworks (Fabrication / Installation /Dismantling) 0.05%
Concrete Works 0.50%
Erection of Scaffoldings 3.00%
MASONRY WORKS 14.75%
Wall Footing Concrete Hollow Blocks
Reinforcement 0.20%
Installation 0.50%
GF Concrete Hollow Blocks
Reinforcement 0.20%
Installation 1.00%
2F Concrete Hollow Blocks
Reinforcement 0.20%
Installation 1.00%
Parapet Concrete Hollow Blocks
Reinforcement 0.20%
Installation 0.75%
Partition Concrete Hollow Blocks
Reinforcement 0.20%
Installation 1.00%
Plastering (Exterior) 5.00%
Plastering (Interior) 3.00%
Plastering (Parapet/Firewall) 1.50%
LECTRICAL WORKS 3.25%
Rough-ins
Installation of Electrical Pipes 1.00%
Installation of Electrical Wires & Cables 0.50%
Electrical Fixtures and Equipment
Installation of Panel Box & Circuit Breaker 0.75%
Installation of Convenience Outlet & Switches 1.00%
LUMBING & SANITARY WORKS 2.35%
Rough-ins
Installation of Sanitary Pipes and Fittings 1.25%
Installation of Water Pipes and Fittings 0.75%
Plumbing Fixtures
Installation of Water Closets 0.10%
Installation of Lavatories 0.10%
Installation of Floor Drains 0.05%
Installation of Shower Heads 0.10%
WOOD WORKS 7.85%
Ceiling
Ceiling Framing (Installation) 1.25%
Ceiling Boards (Installation) 1.50%
Doors and Door Jambs
Door (Installation) 1.00%
Door Jamb (Installation) 1.50%
Cabinet Door (Installation) 1.00%
Cabinet Door Jamb (Installation / Fabrication) 0.75%
Door Knob / Cabinet Handle (Installation) 0.10%
PVC Door and Jamb (Installation) 0.50%
Stair Railings (Wood-Installation) 0.25%
LE WORKS 5.90%
Waterproofing (CR Second Floor) 0.50%
Floor Tiles
Ground Floor 0.50%
Second Floor 0.50%
CR - Ground Floor 0.25%
CR - Second Floor 0.25%
Balcony 0.20%
Stair 0.20%
Wall Tiles
CR - Ground Floor 1.00%
CR - Second Floor 1.00%
Kitchen Counter Top ( Granite / Tiles ) 0.75%
Wall Cladding 0.75%
AILINGS 0.85%
Stair Railings
Fabrication 0.35%
Installation 0.50%
Balcony 0.80%
Fabrication 0.58%
Installation 0.22%
OOFING WORKS
Roof Framing 1.00%
Fabrication/Installation 1.00%
Roof Sheet and Accessories 1.30%
Gutter (Fabrication/Installation) 0.60%
Roof Sheet (Installation) 0.25%
Roofing Accessories (Installation) 0.45%
AINTING WORKS 14.75%
Exterior Paint
Skimcoating White 1.60%
Sanding 1.30%
Primer 0.70%
Final Painting 0.75%
Interior Paint
Skimcoating Grey 1.25%
Skimcoating White 1.40%
Sanding 1.30%
Primer 0.70%
Final Painting 0.75%
Doors , Jambs, Cabinet Doors & Stair Railings Varnishing
Preparation 2.50%
Final Coating 0.50%
Ceiling
Preparation 1.50%
Final Coating 0.50%
NISHING WORKS 2.90%
Ground Preparation
Garage
Preparation 0.30%
Rebar Works 0.50%
Concrete Works 0.50%
Laundry
Preparation 0.30%
Rebar Works 0.50%
Concrete Works 0.50%
Punchlisting 0.30%
Total % per week 100.00%
To Date %
PROJECT: DEVV - FSTN
LOCATION:
Foreman Assigned:
Date Started:
Turn-over Date:
EARTHWORKS 1.25% WT
Clearing / Layouting 0.05%
Excavation 1.00%
Trimming of Wall Footing 0.15%
Backfilling and Compaction 0.50%
Septic Tank Fabrication 0.60%
STRUCTURAL 42.00%
Column Footing
Rebars (Fabrication/Installation) 0.50%
Concrete Works 1.00%
Wall Footing
Rebars (Fabrication/Installation) 0.50%
Concrete Works 1.00%
Column ( Ftg to 2F)
Rebars (Fabrication/Installation) 1.00%
Formworks (Fabrication / Installation /Dismantling) 1.00%
Concrete Works 1.50%
Beam
Rebars (Fabrication/Installation) 1.50%
Formworks (Fabrication / Installation /Dismantling) 1.00%
Concrete Works 1.50%
Column ( 2F to Roof Beam)
Rebars (Fabrication/Installation) 2.00%
Formworks (Fabrication / Installation /Dismantling) 1.50%
Concrete Works 1.50%
Roof Beam
Rebars (Fabrication/Installation) 2.00%
Formworks (Fabrication / Installation /Dismantling) 1.50%
Concrete Works 2.00%
Column ( Roof Beam to Parapet)
Rebars (Fabrication/Installation) 2.00%
Formworks (Fabrication / Installation /Dismantling) 1.50%
Concrete Works 1.50%
Second Floor Slab
Rebars (Fabrication/Installation) - One-way Slab 1.00%
Formworks (Fabrication / Installation /Dismantling) 0.25%
Steel Decking Installation 1.00%
Concrete Works 2.50%
Stairs
Rebars (Fabrication/Installation) 0.75%
Formworks (Fabrication / Installation /Dismantling) 1.50%
Concrete Works 1.50%
Slab-on-Fill / Slab-on-Grade
Preparation (Backfilling / Gravel Bedding) 0.25%
Rebar Works 0.75%
Concrete Works 1.50%
Kitchen Counter Top
Rebars (Fabrication/Installation) 0.25%
Formworks (Fabrication / Installation /Dismantling) 0.10%
Concrete Works 1.00%
Laundry Countertop
Rebars (Fabrication/Installation) 0.10%
Formworks (Fabrication / Installation /Dismantling) 0.05%
Concrete Works 0.50%
Erection of Scaffoldings 3.00%
MASONRY WORKS 14.75%
Wall Footing Concrete Hollow Blocks
Reinforcement 0.20%
Installation 0.50%
GF Concrete Hollow Blocks
Reinforcement 0.20%
Installation 1.00%
2F Concrete Hollow Blocks
Reinforcement 0.20%
Installation 1.00%
Parapet Concrete Hollow Blocks
Reinforcement 0.20%
Installation 0.75%
Partition Concrete Hollow Blocks
Reinforcement 0.20%
Installation 1.00%
Plastering (Exterior) 5.00%
Plastering (Interior) 3.00%
Plastering (Parapet/Firewall) 1.50%
ELECTRICAL WORKS 3.25%
Rough-ins
Installation of Electrical Pipes 1.00%
Installation of Electrical Wires & Cables 0.50%
Electrical Fixtures and Equipment
Installation of Panel Box & Circuit Breaker 0.75%
Installation of Convenience Outlet & Switches 1.00%
PLUMBING & SANITARY WORKS 2.35%
Rough-ins
Installation of Sanitary Pipes and Fittings 1.25%
Installation of Water Pipes and Fittings 0.75%
Plumbing Fixtures
Installation of Water Closets 0.10%
Installation of Lavatories 0.10%
Installation of Floor Drains 0.05%
Installation of Shower Heads 0.10%
WOOD WORKS 7.85%
Ceiling
Ceiling Framing (Installation) 1.25%
Ceiling Boards (Installation) 1.50%
Doors and Door Jambs
Door (Installation) 1.00%
Door Jamb (Installation) 1.50%
Cabinet Door (Installation) 1.00%
Cabinet Door Jamb (Installation / Fabrication) 0.75%
Door Knob / Cabinet Handle (Installation) 0.10%
PVC Door and Jamb (Installation) 0.50%
Stair Railings (Wood-Installation) 0.25%
TILE WORKS 5.90%
Waterproofing (CR Second Floor) 0.50%
Floor Tiles
Ground Floor 0.50%
Second Floor 0.50%
CR - Ground Floor 0.25%
CR - Second Floor 0.25%
Balcony 0.20%
Stair 0.20%
Wall Tiles
CR - Ground Floor 1.00%
CR - Second Floor 1.00%
Kitchen Counter Top ( Granite / Tiles ) 0.75%
Wall Cladding 0.75%
RAILINGS 0.85%
Stair Railings
Fabrication 0.35%
Installation 0.50%
Balcony 0.80%
Fabrication 0.58%
Installation 0.22%
ROOFING WORKS
Roof Framing 1.00%
Fabrication/Installation 1.00%
Roof Sheet and Accessories 1.30%
Gutter (Fabrication/Installation) 0.60%
Roof Sheet (Installation) 0.25%
Roofing Accessories (Installation) 0.45%
PAINTING WORKS 14.75%
Exterior Paint
Skimcoating White 1.60%
Sanding 1.30%
Primer 0.70%
Final Painting 0.75%
Interior Paint
Skimcoating Grey 1.25%
Skimcoating White 1.40%
Sanding 1.30%
Primer 0.70%
Final Painting 0.75%
Doors , Jambs, Cabinet Doors & Stair Railings Varnishing
Preparation 2.50%
Final Coating 0.50%
Ceiling
Preparation 1.50%
Final Coating 0.50%
FINISHING WORKS 2.90%
Ground Preparation
Garage
Preparation 0.30%
Rebar Works 0.50%
Concrete Works 0.50%
Laundry
Preparation 0.30%
Rebar Works 0.50%
Concrete Works 0.50%
Punchlisting 0.30%
Total % per week 100.00%
To Date %