Abstract of Cost for Construction of Footpath for Datia Mini Smart City
S.
Work Details Cost in Lacs
No.
Construction of Footpath including excavation of earth (Soil), Levelling of excavated earth with
crusher stone dust, providing and laying of factory made cement concrete interlocking paver block
of M-30 grade reflective type rubber moduled glossy colour, providing kerb stone on both side of
the footpath, construction of shoulder in support of the paver block, painting work along with
placing of sign boards for direction and markings etc.
From Datia Jod to Peetambar Peeth Mandir (Old Collectorate Road) (Taking
1 Road length of 2040m and foothpath on both side of the road, Total Length 64.92
of Footpath- 4080m having width of 1.2m)
Levelling Course
Supplying and filling in plinth
UADD under floors including, watering,
2 Vol II ramming consolidating and dressing 2 2040 1.2 0.15 734.40 Cum 628 565.2 415083
2.27.1 complete.
Crusher Stone Dust
Ch 0 to 2040 m = 2040 m
Paver Block
Ch 0 to 2040 m = 2040 m
Ch 0 to 2040 m = 2040 m
On the Either Side of Road Ends
Kerb Stone
Painting
Painting two coats after filling the
surface with synthetic enamel paint
UADD in all shades on new plastered
6 Vol concrete surfaces and as per 2 2040 1.2 - 4896.00 SqM 44 39.6 193882
III 8.6 relevant clauses of section-800 &
I.R.C.-67 including cost of paint etc.
complete.
Ch 0 to 2040 m = 2040 m
Levelling Course
Supplying and filling in plinth
UADD under floors including, watering,
2 Vol II ramming consolidating and dressing 2 2600 1.2 0.15 936.00 Cum 628 565.2 529027
2.27.1 complete.
Crusher Stone Dust
Ch 0 to 2600.00 m = 2600 m
Paver Block
Ch 0 to 2600.00 m = 2600 m
Ch 0 to 2600.00 m = 2600 m
On the Either Side of Road Ends
Kerb Stone