Kariba South Power –Sation Automation Project

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: 18kV Switchgear panel To: New Relay Panel
Cable no: 4/18S (1) Cores: 19
Length: 55m Qty: 2 glands

Relay 4/18P 18kV Protection New Relay


Panel Panel
No Core Ferrule Term Ferrule Term Comments
numbe no no no no
r
R1 1 X62 X62 1 ACB Closed
R2 2 X63 X63 2 ACB Open
R3 3 X35 X35 3 isolator g4 closed
R4 4 X36 X36 4 isolator g4 open
R5 5 X37 X37 5 E /Switch G1A closed
R6 6 X38 X38 6 E /Switch G1A open
R7 7 X39 X39 7 E /Switch G1B closed
R8 8 X40 X40 8 E /Switch G1B open
R9 9 X54 X54 9 ACB low air pressure
R10 10 X55 X55 10 ACB trip supply fail
11 X31 X31 11 Common +ve
12 Spare Spare 12
13 Spare Spare 13
14 Spare Spare 14
15
16
17
18
19

1multicore cable schedules Page 1 of 16


Kariba South Power –Sation Automation Project

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: 18kV Protection panel To: New Relay Panel
Cable no: 4/18P (2) Cores: 19
Length: 48m Qty: 2 glands

Relay 4/18P 18kV Protection New Relay


Panel Panel
No Core Ferrule Term Ferr Term Comments
R11 1 X52 X52 15 Main protection operated
R12 2 X53 X53 16 Backup protection operated
R13 3 X57 X57 17 Unit Tx Buchholz
R14 4 X55 X55 18 Trip Circuit Fail Alarm
R15 5 19 Overvoltage
R16 6 20 Overcurrent
R17 7 21 Merz price
R18 8 22 Earth fault
X 9 X51 X51 23 Common +ve
X 10 X59 X59 24 Common -ve
11 Spare Spar 25
12 Spare Spar 26
13 Spare Spar 27
14 Spare Spar
15 Spare Spar
16 Spare Spar
17 Spare Spar
18 Spare Spar
19 Spare Spar

2multicore cable schedules Page 2 of 16


Kariba South Power –Sation Automation Project

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: Excitation Control Suite To: New Relay Panel
Cable no: 4/EP (3.1) Cores: 2 x 27
Length: 39m Qty: 2 glands

4/18P Excitation control suite New Relay Panel


Core no Ferrule no Term no Ferrule no Term no comments
TB11
1 U1001 U1001 28 Excitation build up failure
2 U1002 U1002 29
3 U1003 U1003 30 Rotor earth fault
4 U1004 U1004 31
5 U1005 U1005 32 Rotor temp high
6 U1006 U1006 33
7 U1009 U1009 34 Electronic power pack fail
8 U1010 U1010 35
9 U1011 U1011 36 Converter line fuse fail
10 U1012 U1012 37
11 U1013 U1013 38 Converter surge circuit fail
12 U1014 U1014 39
13 U1015 U1015 40 Excitation Tx high temp
14 U1016 U1016 41
15 U1021 U1021 42 Air flow fail
16 U1022 U1022 43
17 U1023 U1023 44 Electronic power supply
18 U1024 U1024 45 fail
19 U1025 U1025 46 Thyristor fault
20 U1026 U1026 47
21 U1027 U1027 48 AC S/by power supply fail
22 U1028 U1028 49
23 U1029 U1029 50 DC aux power supply fail
24 U1030 U1030 51
25 U1035 U1035 52 Under excitation limit
26 U1036 U1036 53
27 Spare spare 54

3multicore cable schedules Page 3 of 16


Kariba South Power –Sation Automation Project

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: Excitation Control Suite To: New Relay Panel
Cable no: 4/EP (3.2) Cores: 2 x 27
Length: 39m Qty: 2 glands

4/18P Excitation control suite New Relay Panel


Core no Ferrule no Term no Ferrule no Term no comments
1 U1037 U1037 55 Over excitation limit
2 U1038 U1038 56
Common Positive for digital ****** 57
inputs
3 U1039 U1039 58 Thyristor high temp trip
4 U1040 U1040 59
TB12
5 U1041 U1041 60 Thyristor high temp alarm
6 U1042 U1042 61
7 62 Excitation in auto
8 63
9 U1059 U1059 64 Stator current limit
10 U1060 U1060 65
11 66
12 67
13 W1121 W1121 68 Field contactor closed
14 W1123 W1123 69
15 W1125 W1125 70 Field contactor open
16 W1127 W1127 71
17 U1057 U1057 72 Standby control
18 U1058 U1058 73
19 U1045 U1045 74 Trip to S/by manual
20 U1046 U1046 75
21 Spare Spare 76
22 Spare Spare 77
23 Spare Spare 78
24 Spare Spare
25 Spare Spare
26 Spare Spare
27 Spare Spare

4multicore cable schedules Page 4 of 16


Kariba South Power –Sation Automation Project

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: Sequencer Panel To: New Relay Panel
Cable no: 4/SP (4.1) (19core) Cores: 1x 27, 1 x 19
Length: 10m Qty: 2 glands

4/18P Sequencer Panel New Relay Panel


Core number Ferrule no Term no Ferrule no Term no Comments
1 1801 Tb2/70T 1801 79 Sequencer failure
2 1802 Tb2/70B 1802 80
3 1803 Tb2/71T 1803 81 Incomplete sequence
4 1804 Tb2/71B 1804 82
5 1805 TB2/72T 1805 83 Auto sync on
6 1806 TB2/72B 1806 84
7 1807 TB2/73T 1807 85 Ready to sync
8 1808 TB2/73B 1808 86
9 1809 TB2/74T 1809 87 Unit in operation
10 1810 TB2/74B 1810 88
11 1689 TB2/45T 1689 89 Unit at rest available for
12 1690 TB2/45B 1690 90 start
13 1691 TB2/46T 1691 91 Unit start in progress
14 1692 TB2/46B 1692 92
15 1693 TB2/47T 1693 93 Unit start-up auxiliaries
16 1694 TB2/47B 1694 94
Common for digital 95
inputs
17 1695 TB2/48T 1695 96 Unit start-up to SNL
18 1696 TB2/48B 1696 97
19 SpaRE SpaRE 98

5multicore cable schedules Page 5 of 16


Kariba South Power –Sation Automation Project

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: Sequencer Panel To: New Relay Panel
Cable no: 4/SP (4.2)(27core) Cores: 1x 27, 1 x 19
Length: 10m Qty: 2 glands

4/18P SEQ PANELl New Relay Panel


Core number Ferrule no Term no Ferrule no Term no Comments
1 1697 TB2/49T 1697 99 Unit at SNL
2 1698 TB2/49B 1698 100
3 1699 TB2/50T 1699 101 Unit synchronising
4 1700 TB2/50B 1700 102 sequence
5 1701 TB2/51T 1701 103 Turbine to governor setting
6 1702 TB2/51B 1702 104 generator ready to load
VARS
7 1703 TB2/52T 1703 105 Unit stop in Progress
8 1704 TB2/52B 1704 106
9 1705 TB2/53T 1705 107 Turbine at rest
10 1706 TB2/53B 1706 108
11 1707 TB2/54T 1707 109 Speed signal faulty
12 1708 TB2/54B 1708 110
13 1709 TB2/55T 1709 111 Caution Test mode enabled
14 1710 TB2/55B 1710 112
15 1711 TB2/56T 1711 113 Unit isolated
16 1712 TB2/56B 1712 114
17 1713 TB2/57T 1713 115 Battery faulty
18 1714 TB2/57B 1714 116
19 1715 TB2/58T 1715 117 Self test
20 1716 TB2/58B 1716 118
21 Spare Spare 119
22 Spare Spare 120
23 Spare Spare 121
24 Spare Spare 122
25 Spare Spare 123
26 Spare Spare 124
27 Spare Spare 124

6multicore cable schedules Page 6 of 16


Kariba South Power –Sation Automation Project

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: Turbine Panel To: New Relay Panel
Cable no: 4/AP (5.1) Cores: 27
Length: 8m Qty: 2 glands

Relay 4/18P 18kV New Relay Panel


No Core Ferrule Term Ferrule Term Comments
R19 1 L2 TB2 L2 127 High Bearing Temp
R20 2 L3 TB2 L3 128 Gov Oil Pressure Low
R21 3 L6 TB2 L6 129 Gv Fail To Close
R22 4 L10 TB2 L10 130 Brake Air Pressure Low
R23 5 L12 TB2 L12 131 Cooling Water Failure
R24 6 L19 TB2 L19 132 S/By Gop Running
R25 7 L21 TB2 L21 133 Guide Vanes Fail To Open
R26 8 L40 TB2 L40 134 Shear-Pin Failure
R27 9 L24 TB2 L24 135 Stator Air Temp
R28 10 L22 TB2 L22 136 Governor Oil Level Low
R29 11 L23 TB2 L23 137 Brakes Fail To Operate
R30 12 L25 TB2 L25 138 Co2 Released
R31 13 L26 TB2 L26 139 Fail To Start
R32 14 L27 TB2 L27 140 Overspeed
R33 15 L28 TB2 L28 141 Exciter Trip To Manual /Sby
R34 16 L30a TB2 L30a 142 Gen Guide Bering Oil Level
R35 17 L30 TB2 L30 143 TGB And GTB Oil Level
R36 18 L31 TB2 L31 144 Filters Clogged
R37 19 L38a TB2 L38a 145 Tchwl Trip
R38 20 L35 TB2 L35 146 Brake Interlock Failure
R39 21 L33 TB2 L33 147 Urgent Excitation Trouble
R40 22 L29/L34 TB2 L34 148 STN/TCWDrain Sump Hwl
R41 23 4L5 TB1 L5 149 Governor Fail *
R42 24 L4 TB1 L4 150 Governor Fault*
25 L37 TB2 L37 151 Common Negative
26 Spare Spare 152
27 Spare Spare 153

*See wiring modes for Governor

7multicore cable schedules Page 7 of 16


Kariba South Power –Sation Automation Project

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: Turbine Panel To: New Relay Panel
Cable no: 4/TP 5.2 Cores: 19
Length: 10m Qty: 2 glands

Relay 4/18P Turbine Panel New Relay Panel


No Core Ferrul Term no Ferrul Term Comments
R43 1 L200 TB2 t/panel L200 154 C/S supply available (L)
2 L201 TB2 t/panel L201 155 N
R44 3 L202 TB2 t/panel L202 156 Unit Tx supply available
4 L204 TB2 t/panel L204 157
R45 5 L114 TB2 t/panel L114 158 C/S supply on
6 L116 TB2 t/panel L116 159
R46 7 L115 TB2 t/panel L115 160 Unit Tx supply on
8 L116 TB2 t/panel L116 161
XX 9 Ax1 TB1 t/panel Ax1 162 Auto manual
XX 10 Ax2 TB1 t/panel Ax2 163
XX 11 Ax3 TB1 t/panel Ax3 164 Remote/Local
XX 12 Ax4 TB1 t/panel Ax4 165
R47 13 L43 TB2 t/panel L43 166 Intake gate closed
14 L44 TB2 t/panel L44 167 Intak Gate Ind.common
R48 15 L42 TB2 t/panel L42 168 Intake Gate Open
16 Ax5 TB2 t/panel Ax5 169 Tchwl Alarm
17 Ax6 TB2 t/panel Ax6 170
18 Spare Spare 171
19 Spare Spare 172

8multicore cable schedules Page 8 of 16


Kariba South Power –Sation Automation Project

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: Turbine Panel To: New Relay Panel
Cable no: 4/18S (5.3) Control commands Cores: 19
Length: 55m Qty: 2 glands
4/18P Turbine Panel New Relay Panel
Core Ferrule no Term no Ferrule no Term no comments
1 W1153 Seq- tb2/86B 655 173 Unit start
2 W1155 Seq- tb2/85B 656 174
3 W1157 Seq- tb2/85t 657 175 Unit stop
4 W1159 Seq- tb2/86t 658 176
5 W1205 Seq- tb1/33t 659 177 Unit Synchronise
6 W1207 Seq- tb1/33b 660 178
7 1515 661&663 179 Volt control common
8 1516 Seq- tb2/89B 662 180 Raise volts
9 1518 Seq- tb2/90B 664 181 Lower volts
10 L200 Seq- tb2/112t L200 182 Open ACB
11 W11 Seq- tb2/112b W11 183
12 W13a Seq- tb2/24t W13a 184
13 L201 Seq- tb2/24b L201 185
14 Z165 T/panel Tb2 Z165 186 Trip Intake gate
15 Z161 T/panel Tb2 Z161 187
16 Z164 T/panel Tb2 Z164 188
17 Earth T/panel Tb2 189
18 Spare 190
19 Spare 191

9multicore cable schedules Page 9 of 16


Kariba South Power –Sation Automation Project

MULTICORE CABLE SCHEDULE


( Existing Cable) Use Spare cores

Date: 28/08/2001
From: Machine Remote junction box To: Annanciator
Cable no: Cores: 37
Length: Qty:

4/18P Rem Control Juntion Box Annanciator Panel


Core number Ferrule no Term no Ferrule no Term no comments
1 Unit Tx C02 operated
2 X60 X60 Unit Tx C02 released
3 X56 X56 Unit Tx 380V earth fault
Common +ve

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: Annanciator To: New Relay box
Cable no: (6) Cores: 10
Length: Qty:

Relay 4/18P Annanciator Panel New Relay Panel


No Core Ferrule no Term no Ferrule Term no Comments
No no
R49 1 X?? 192 Unit Tx C02 Isolated
R50 2 X60 X60 193 Unit Tx C02 released
R51 3 X56 X56 194 Unit Tx 380V earth
fault
4 Z79 TB1 195 SDR operated
5 Z100 TB1 196
6 Ax7 DCF/9 Ax7 197 Alarm supply fail
7 Ax8 DCF/11 Ax8 198

8 Ax9 EDPRR /9 Ax9 199 EDP Running ( No 6


9 Ax10 EDPRR/11 Ax10 200 Only)
10 +ve 201 Common +ve

10multicore cable schedules Page 10 of 16


Kariba South Power –Sation Automation Project

SCREENED CABLE SCHEDULE

Date: 28/08/2001
From: Transducers To: New Relay Panel
Cable no: 4/TP1-14 Cores: Twisted pair
Length: Qty:

Cable 4/18 From Transducers New Relay Panel


No. Core Ferrule Term no Ferrule no Term Comments
4T/P1 + 505 505 Stator air temp 1
- 506 506
4T/P2 + 507 507 Stator air temp 2
- 508 508
4T/P3 + 509 509 TGB temp
- 510 510
4T/P4 + 511 511 GTB temp
- 512 512
4T/P5 + 513 513 GGB
- 514 514
4T/P6 + 515 515 Stator temp
- 516 516
4T/P7 + 517 517 Rotor temp
- 518 518
4T/P8 + 519 519 Rotor current
- 520 520
4T/P9 + 24E50+ 24E50+ Spiral Casing pressure
- 522 522
4T/P10 + 24E50+ 24E50+ Governor oil pressure
- 524 524
4T/P11 + 24E50+ 24E50+ Governor Air vessel
- 526 526 Pressure
4T/P12 + 527 527 Stator current
- 258 258
4T/P13 + 529 529 Volts
- 530 530
4T/P14 + 531 531 Water flow
- 532 532
4T/P15 + 24E50+ 24E50+ Lake Level
- 534 534
4T/p16 + 24E50+ 24E50+ Tail–Race Level
_ 536 536

NB Lake level and tail race level connected to Unit one Only

11multicore cable schedules Page 11 of 16


Kariba South Power –Sation Automation Project

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: S8000 Panel To: New Relay Panel
Cable no: 4/SP (7.1) (37) Cores: 1x 37,
Length: 10m Qty: 2 glands

S800 panel New relay


panel
Core Ferrul Terminal Term ferrul Term I/O No Designation
numbe e no block e
r
1 572 +B16.DI2 3/1 572 29 DI19 Excitation Build up failure
2 573 +B16.DI2 4/1 573 31 20 Rotor earth fault
3 574 +B16.DI2 5/1 574 33 21 Rotor high temp
4 575 +B16.DI2 6/1 575 35 22 Electronic power pack failure
5 576 +B16.DI2 7/1 576 37 23 Convertor line fuse failed
6 577 +B16.DI2 8/1 577 39 24 Convertor surge circuit failure
7 578 +B16.DI2 9/1 578 41 25 Excitation tx high temp
8 579 +B16.DI2 10/1 579 43 26 Air flow failure
9 580 +B16.DI2 11/1 580 45 27 Electronic power supply failure
10 581 +B16.DI2 12/1 581 47 28 Thyristor fault
11 582 +B16.DI2 13/1 582 49 29 AC standby power sup.failure
12 583 +B16.DI2 14/1 583 51 30 DC auxiliary power sup.failure
13 584 +B16.DI2 15/1 584 53 31 Under excitation limit
14 585 +B16.DI2 16/1 585 56 32 Over excitation limit
15 586 +B16.DI2 17/1 586 57 Common +ve for DI’s 17-32
16 587 +B16.DI3 1/1 587 59 33 Thyristor high temp. trip
17 588 +B16.DI3 2/1 588 61 34 Thyristor high temp.alarm
18 589 +B16.DI3 3/1 589 63 35 Excitation in Auto
19 590 +B16.DI3 4/1 590 65 36 Stator current limit
20 +B16.DI3 5/1 67
21 591 +B16.DI3 6/1 591 69 37 Field contactor closed
22 592 +B16.DI3 7/1 592 71 38 Field contactor open
23 593 +B16.DI3 8/1 593 73 39 Manual/Standby control
24 594 +B16.DI3 9/1 594 75 40 Sequencer failure
25 595 +B16.DI3 10/1 595 80 41 Incomplete sequence
26 596 +B16.DI3 11/1 596 82 42 Auto synch on
27 597 +B16.DI3 12/1 597 84 43 Ready to synch
28 598 +B16.DI3 13/1 598 86 44 Unit in operation
29 599 +B16.DI3 14/1 599 88 45 Unit at rest available for Start
30 600 +B16.DI3 15/1 600 90 46 Unit start in progress
31 601 +B16.DI3 16/1 601 92 47 Unit Isolated
32 602 +B16.DI3 17/1 602 94 48 Unit start up Auxiliaries
33 603 +B24.DI4 1/1 603 95 Common +ve for DI’s 33-48
34 604 +B24.DI4 2/1 604 97 49 Unit Start up to speed-no load
35 605 +B24.DI4 3/1 605 100 50 Commissioning in progress -Do not
Operate
36 606 +B24.DI4 4/1 606 102 51 Unit at speed no load
37 607 B24.DI4 5/1 607 104 52 Unit Synchronising sequence

12multicore cable schedules Page 12 of 16


Kariba South Power –Sation Automation Project

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: S800 Panel To: New Relay Panel
Cable no: 4/SP (7.2) (37) Cores: 1x 37,
Length: 10m Qty: 2 glands

S800 panel New relay


panel
Core Ferrul Terminal Term Ferru Term I/O No Designation
numbe e no blok le
r
1 608 +B24.DI4 6/1 608 106 DI53 Turbine to governor power setting-
generator ready to load vars
2 609 +B24.DI4 7/1 609 108 DI54 Unit Stop in progress( Includes speed
bar gragh)
3 610 +B24.DI4 8/1 610 110 DI55 Turbine at rest
4 611 +B24.DI4 9/1 611 112 DI56 Speed signal fault
5 612 B24.DI4 10/1 612 114 DI57 Caution Test mode Enabled
6 613 +B24.DI4 11/1 613 116 DI58 Battery Faulty
7 614 +B24.DI4 12/1 614 118 DI59 Self test
8 645 +B24.DI6 8/1 645 163 DI88 Auto/manual
9 646 +B24.DI6 9/1 646 165 DI89 Remote/local
10 649 +B24.DI6 12/1 649 170 DI92 TChwl alarm
11 655 +B24.DO 1/1 655 173 DO1 Unit Start
1
12 656 +B24.DO 2/1 656 174 DO1
1
13 657 +B24.DO 3/1 657 175 DO2 Unit Stop
1
14 658 +B24.DO 4/1 658 176 DO2
1
15 659 +B24.DO 5/1 659 177 DO3 Unit Sycnronise
1
16 660 +B24.DO 6/1 660 178 DO3
1
17 661& +B24.DO 7/1&9 661& 179 Do4& Common for DO4 &DO5
663 1 /1 663 do5
18 662 +B24.DO 8/1 662 180 DO4 volts raise
1
19 664 +B24.DO 10/1 664 181 DO5 volts lower
1
20 653 +B24.DI6 16/1 653 196 DI96 Shutdown relay operated
21 TBA +B24.DI7 1/1 537 198 DI97 Alarm supply fail
22 TBA +B24.DI7 2/1 538 200 DI98 EDP running (Unit 6 only)
23 654 +B24.DI6 17/1 654 202 Common for DI6
24 553 +B16.DI1 1/1 553 206 DI1 ACB Closed
25 554 +B16.DI1 2/1 554 208 DI2 ACB Open
26 555 +B16.DI1 3/1 555 210 DI3 Isolator g4 closed
27 556 +B16.DI1 4/1 556 212 DI4 Isolator g4 open
28 557 +B16.DI1 5/1 557 214 DI5 E /Switch G1A closed
29 558 +B16.DI1 6/1 558 216 DI6 E /Switch G1A open

13multicore cable schedules Page 13 of 16


Kariba South Power –Sation Automation Project

30 559 +B16.DI1 7/1 559 218 DI7 E /Switch G1B closed


31 560 +B16.DI1 8/1 560 220 DI8 E /Switch G1B open
32 561 +B16.DI1 9/1 561 222 DI9 ACB Low Air pressure
33 562 +B16.DI1 10/1 562 224 DI10 ACB trip supply fail
34 563 +B16.DI1 11/1 563 226 DI11 Main Protection Operated
35 564 +B16.DI1 12/1 564 228 DI12 Backup Protection Operated
36 565 +B16.DI1 13/1 565 230 DI13 Unit Tx bucholz
37 566 +B16.DI1 14/1 566 232 DI14 Trip CCT fail Alarm

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: S800 Panel To: New Relay Panel
Cable no: 4/SP (7.3) (37) Cores: 1x 37,
Length: 10m Qty: 2 glands

S800 panel New relay


panel
Core Ferrul Terminal Term Ferru Term I/O No Designation
numbe e no blok le
r
1 567 +B16.DI1 15/1 234 DI15 Overvolatge
2 568 +B16.DI1 16/1 236 DI16 Over current
3 569 237 Common For DI 1-DI16
4 570 +B16.DI2 1/1 239 DI17 Merz price
5 571 +B16.DI2 2/1 241 DI18 Earth fault
6 615 +B24.DI4 12/1 243 DI60 High bearing temp
7 616 +B24.DI4 13/1 245 DI61 Gov Low oil Pressue
8 617 +B24.DI4 14/1 247 DI62 Gv fail to close
9 618 +B24.DI4 15/1 249 DI63 brake air pressure low
10 619 +B24.DI4 16/1 251 DI64 cooling water failure
11 620 +B24.DI4 17/1 252 L2+ COMMON FOR DI 49-64
12 621 +B24.DI5 1/1 254 DI65 S/By G.O.P running
13 622 +B24.DI5 2/1 256 DI66 Gv fail to open
14 623 +B24.DI5 3/1 258 DI67 shear-pin failure
15 624 +B24.DI5 4/1 260 DI68 Stator air temp
16 625 +B24.DI5 5/1 262 DI69 Gov oil level low
17 626 +B24.DI5 6/1 264 DI70 Brakes fail to operate
18 627 +B24.DI5 7/1 266 DI71 co2 released
19 628 +B24.DI5 8/1 268 DI72 fail to start
20 629 +B24.DI5 9/1 270 DI73 Overspeed
21 630 +B24.DI5 10/1 272 DI74 Exciter trip to Stand by manual
22 631 +B24.DI5 11/1 274 DI75 gen guide bearing oil level
23 632 +B24.DI5 12/1 276 DI76 TGB and GTB oil level
24 633 +B24.DI5 13/1 278 DI77 filters clogged/gov problem
25 634 +B24.DI5 14/1 280 DI78 Tchwl trip
26 635 +B24.DI5 15/1 282 DI79 Brake interlock failure
27 636 +B24.DI5 16/1 284 DI80 Urgent Excitation trouble
28 637 +B24.DI5 17/1 285 L2+ COMMON FOR DI 65-80
29 638 +B24.DI6 1/1 287 DI81 Tcw/Stn Drain sump hwl * Tcw (2,4,6)
Stn-(1,3,5)
30 639 +B24.DI6 2/1 289 DI82 Governor failure
31 640 +B24.DI6 3/1 291 DI83 Governor fault

14multicore cable schedules Page 14 of 16


Kariba South Power –Sation Automation Project

32 641 +B24.DI6 4/1 293 DI84 C/S supply avail


33 642 +B24.DI6 5/1 295 DI85 Unit Tx supply avail
34 643 +B24.DI6 6/1 297 DI86 C/S supply on
35 644 +B24.DI6 7/1 299 DI87 Unit Tx supply on
36 647 +B24.DI6 10/1 301 DI90 Intake gate closed
37 648 +B24.DI6 11/1 303 DI91 Intake gate Open

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: S800 Panel To: New Relay Panel
Cable no: 4/SP (7.4) (37) Cores: 1x 37,
Length: 10m Qty: 2 glands

S800 panel New relay


panel
Core Ferrule Terminal Term Ferr Ter I/O No Designation
num no blok ule m
ber
1 650 +B24.DI6 13/1 650 305 DI93 co2 isolated
2 651 +B24.DI6 14/1 651 307 DI94 unit tx Co2 released
3 652 +B24.DI6 15/1 652 308 DI95 Unit Tx 380v earth fault
4 654 +B24.DI6 17/1 654 310 COMMON FOR DI 81-96
5 539 +B24.DI7 3/1 539 DI99 FUTURE
6 540 +B24.DI7 4/1 540 DI100 FUTURE
7 541 +B24.DI7 5/1 541 DI101 FUTURE
8 542 +B24.DI7 6/1 542 DI102 FUTURE
9 543 +B24.DI7 7/1 543 DI103 FUTURE
10 544 +B24.DI7 8/1 544 DI104 FUTURE
11 545 +B24.DI7 9/1 545 DI105 FUTURE
12 546 +B24.DI7 10/1 546 DI106 FUTURE
13 547 +B24.DI7 11/1 547 DI107 FUTURE
14 548 +B24.DI7 12/1 548 DI108 FUTURE
15 549 +B24.DI7 13/1 549 DI109 FUTURE
16 550 +B24.DI7 14/1 550 DI110 FUTURE
17 551 +B24.DI7 15/1 551 DI111 FUTURE
18 552 +B24.DI7 16/1 552 DI112 FUTURE
19 +B24.DI7 17/1 COMMON FOR DI 97-112
20 :24E50- +24 v power supply for interposing relay
21 666 B24.DO1 12/1 DO6 Open ACB
22 :24E50- +24 v power supply for interposing relay
23 668 B24.DO1 14/1 DO7 Trip intake gate
24 Spare
25 Spare
26 Spare
27 Spare
28 Spare
29 Spare
30 Spare

15multicore cable schedules Page 15 of 16


Kariba South Power –Sation Automation Project

31 Spare
32 Spare
33 Spare
34 Spare
35 Spare
36 Spare
37 Spare

16multicore cable schedules Page 16 of 16