CD 5/0 +10

Kupasan m2
= -
Stripping
Galian
= 3.775 m2 CL
Excavation
Timbunan
649
= 2.097 m2
Embankment 0.30 3.00 0.30
Pas. Batu 647.734
= 2.700 m2
Stone Masonry 1.20 647.206

646.534
0.30
0.30
0.60 3.00 0.60

645
bidang persamaan
reference level
643,00

647,268

647,261
647,388
0,70 647,388
0,70 646,738

646,738

646,738

648,188

648,378

646,660

647,080
ELEVASI TANAH ASLI

1,40
0,20

1,00
JARAK / DISTANCE (m') 2,00 2,00 1,50 4,50 3,00

CD 5/1
Kupasan m2
= -
Stripping
Galian
Excavation
= 5.979 m2 CL
Timbunan
649
= 3.547 m2
Embankment 0.30 3.00 0.30
Pas. Batu 647.618
= 2.700 m2
Stone Masonry
1.20 647.090

646.418
0.30
0.30
0.60 3.00 0.60

645
bidang persamaan
reference level
643,00
647,261
648,149

646,849

646,683

646,795
647,257

647,364
0,70 646,834

646,703
646,255
646,255
0,50 646,856
646,847
ELEVASI TANAH ASLI
1,20

1,20
JARAK / DISTANCE (m') 2,00 1,80 1,80 1,50 3,30
CD 5/2
Kupasan m2
= -
Stripping
Galian m2
= 8.098
Excavation
649 CL
Timbunan m2
= 3.429
Embankment
0.30 3.00 0.30
Pas. Batu
= 2.700 m2 647.452
Stone Masonry
1.20 646.924

646.252
0.30
0.30
0.60 3.00 0.60
645
bidang persamaan
reference level
643,00

647,388

648,855

646,855

646,541

646,619
647,029

647,143
0,80 646,214

646,308
ELEVASI TANAH ASLI

2,84
JARAK / DISTANCE (m') 1,70 1,80 1,50 1,50 1,50

CD 5/3
Kupasan m2
= -
Stripping
Galian m2
= 6.292
Excavation
649 CL
Timbunan m2
= 2.633
Embankment
Pas. Batu 0.30 3.00 0.30
= 2.700 m2
Stone Masonry 647.308

1.20 646.780

646.108
0.30
0.30
0.60 3.00 0.60
645
bidang persamaan
reference level
643,00
647,388

646,544

646,527

646,571
647,069

647,236
646,194

646,368
ELEVASI TANAH ASLI

JARAK / DISTANCE (m') 1,80 1,50 1,50 1,70 3,33


CD 5/4

Kupasan m2
= 0.377
Stripping 649 CL
Galian m2
= 7.185
Excavation
Timbunan 0.30 3.00 0.30
= 5.648 m2
Embankment 647.268

Pas. Batu 1.20 646.740


= 2.700 m2
Stone Masonry
646.068
0.30
0.30
0.60 3.00 0.60
645

bidang persamaan
reference level
642,00

646,538

646,631

646,624

646,761

647,119
0,60 645,858

646,074

646,074
ELEVASI TANAH ASLI

1,25

1,40

1,48
JARAK / DISTANCE (m') 1,65 1,75 1,75

CD 5/5

651
650
Kupasan m2
= 0.280
Stripping
Galian
CL
= 6.199 m2
Excavation
Timbunan m2 0.30 3.00 0.30
= 3.452
Embankment 647.123
Pas. Batu
= 2.700 m2 1.20 646.595
Stone Masonry
645.923
0.30
0.30

645 0.60 3.00 0.60

bidang persamaan
reference level
642,00
646,538

648,575

646,575

646,518

646,601
647,000

646,780
0,60 645,719

645,990

645,990
ELEVASI TANAH ASLI
1,40

1,40

1,00

1,61
JARAK / DISTANCE (m') 1,60 1,50 1,50
BCD 6

Kupasan m2
= -
Stripping 649
Galian m2
= -
Excavation
Timbunan m2
= -
Embankment
Pas. Batu
= - m2
Stone Masonry

645

bidang persamaan
reference level
642,00

646,538

647,206
646,022

646,053
0,50 647,213
0,75 645,998
645,998
0,75 645,998
647,207

647,230
645,835
ELEVASI TANAH ASLI

JARAK / DISTANCE (m') 3,00 2,00 2,20

CD 6/1
Kupasan m2
= -
Stripping
Galian CL
= 7.798 m2
Excavation
Timbunan
648
= 3.418 m2 0.30 3.00 0.30
Embankment 647.023
Pas. Batu
= 2.700 m2 1.20 646.494
Stone Masonry
645.823
0.30
0.30
645 0.60 3.00 0.60

bidang persamaan
reference level
642,00
0,50 648,188

647,149

646,510

646,465

646,465

647,368
0,80 647,336

647,030
645,544
645,452

645,452
648,449

ELEVASI TANAH ASLI


1,00

1,20

1,00
0,30
1,20

1,57
JARAK / DISTANCE (m') 1,50 1,50 1,50
CD 6/2

Kupasan m2
= 0.559
Stripping 649
Galian
= 6.647 m2
CL
Excavation
Timbunan m2
= 5.109 0.30 3.00 0.30
Embankment
646.957
Pas. Batu
= 2.700 m2 646.428
Stone Masonry 1.20

645.757
0.30
0.30
645 0.60 3.00 0.60

bidang persamaan
reference level
642,00

648,378
646,735

646,352

646,370
646,938
647,006

645,394

644,634
ELEVASI TANAH ASLI

1,10

0,30
1,00

1,20
JARAK / DISTANCE (m') 1,50 1,50 4,81

CD 6/3

650
Kupasan m2
= 0.455
Stripping
Galian
= 8.437 m2
CL
Excavation
Timbunan m2
= 5.221 0.30 3.00 0.30
Embankment
646.985
Pas. Batu
= 2.700 m2 1.20 646.456
Stone Masonry
645.785
0.30
0.30
645 0.60 3.00 0.60

bidang persamaan
reference level
642,00
646,660

646,389

646,363

646,506
646,908

646,960
0,60 646,036

646,012
ELEVASI TANAH ASLI

1,40
JARAK / DISTANCE (m') 2,20 1,50 1,50 2,50
CD 6/4

Kupasan m2
= 0.758
Stripping 649
Galian
= 6.685 m2 CL
Excavation
Timbunan m2
= 6.544
Embankment 0.30 3.00 0.30

Pas. Batu 646.792


= 2.700 m2
Stone Masonry 1.20 646.263

645.592
0.30
0.30
645 0.60 3.00 0.60

bidang persamaan
reference level
642,00

645,942
647,080

648,362

646,162

646,260

646,284
646,784

646,887

645,919

645,919
ELEVASI TANAH ASLI

0,20
JARAK / DISTANCE (m') 1,80 1,70 1,50 1,50 1,60 1,70 2,45

CD 6/5
Kupasan m2
= -
Stripping
Galian
= 5.326 m2 CL
Excavation
Timbunan
648
= 2.486 m2
Embankment 0.30 3.00 0.30
Pas. Batu 646.768
= 2.700 m2
Stone Masonry 1.20 646.239

645.568
0.30
0.30
645 0.60 3.00 0.60

bidang persamaan
reference level
642,00
648.342

646,142

646,042

646,214
0,80 647,498

647,482
ELEVASI TANAH ASLI

JARAK / DISTANCE (m') 2,60 1,90 1,90 2,30


CD 6/6
Kupasan m2
= 0.408
Stripping
Galian
Excavation
= 7.428 m2 CL
Timbunan
648
= 4.034 m2
Embankment 0.30 3.00 0.30
Pas. Batu 646.667
= 2.700 m2
Stone Masonry 646.138
1.20

645.467
0.30
645 0.30
0.60 3.00 0.60

bidang persamaan
reference level
642,00

646,399

646,095

646,211
646,650

646,977

646,038
646,054
ELEVASI TANAH ASLI

1,40

1,40

0,20
JARAK / DISTANCE (m') 2,80 3,00 2,00

CD 6/7

Kupasan m2
= 0.194
Stripping 649
Galian
Excavation
= 8.522 m2 CL
Timbunan m2
= 5.462
Embankment 0.30 3.00 0.30
Pas. Batu 646.634
= 2.700 m2
Stone Masonry
1.20 646.105

645.434
0.30
645 0.30
0.60 3.00 0.60

bidang persamaan
reference level
642,00
647,611

646,111

646,147

646,105
0,80 646,325
646,761

646,903
0,50 647,611

647,611
ELEVASI TANAH ASLI
1,20

1,20

1,00
JARAK / DISTANCE (m') 2,30 1,50 1,50
BCD 7
sqm
Kupasan m2
= -
Stripping
sqm
Galian m2
= -
Excavation
Timbunan
sqm 648
= - m2
Embankment
Pas. Batu
m
= - m2
Stone Masonry

645

bidang persamaan
reference level
642,00

646,391

646,043

645,812

645,581
646,441

646,289
0,80 645,354
645,354
ELEVASI TANAH ASLI

1,10
JARAK / DISTANCE (m') 2,00 1,50 1,50 3,00

Kupasan
Stripping
= 0.131 m2 CD 7/1
Galian m2
= 5.644
Excavation CL
Timbunan m2
= 2.175
Embankment
Pas. Batu 647 0.30 3.00 0.30
= 2.700 m2
Stone Masonry 646.361

1.20 645.832

645.161
645 0.30
0.30
0.60 3.00 0.60
bidang persamaan
reference level
642,00
645,526
0,70 645,394

645,331
645,136
646,174

646,148

645,987

645,987
0,20 645,298

645,991
ELEVASI TANAH ASLI
1,00

0,30
1,20

0,10
0,90

0,90
JARAK / DISTANCE (m') 1,80
CD 7/2
Kupasan m2
= 0.193
Stripping
Galian
CL
= 6.959 m2
Excavation
Timbunan
647
0.30 3.00 0.30
= 5.335 m2
Embankment 646.147
Pas. Batu 645.618
= 2.700 m2 1.20
Stone Masonry
645 0.30
644.947
0.30
0.60 3.00 0.60

bidang persamaan
reference level
641,00

645,288

645,198

645,302

645,657
0,50 646,292

646,261
0,20 645,294
0,70 645,143
ELEVASI TANAH ASLI

0,90

1,10
JARAK / DISTANCE (m') 1,50 1,60 1,50

BCD 8

Kupasan m2
= -
Stripping 648
Galian m2
= -
Excavation
Timbunan m2
= -
Embankment
Pas. Batu
= - m2
Stone Masonry
645

bidang persamaan
reference level
641,00

0,50 645,256
645,256
645,389

644,988
644,973
0,70 646,046
0,70 645,473
0,70 644,970
644,970

644,874
644,872

644,872
ELEVASI TANAH ASLI
1,00

1,00

1,00
JARAK / DISTANCE (m') 3,50
CD 8/2
Kupasan m2
= 0.048
Stripping
Galian
= 5.968 m2 CL
Excavation
Timbunan
647
= 2.562 m2 0.30 3.00 0.30
Embankment
645.896
Pas. Batu
= 2.700 m2 645.367
Stone Masonry 1.20
645 644.696
0.30
0.30
0.60 3.00 0.60

bidang persamaan
reference level
641,00

646,338

645,188

645,119

645,103
645,628

645,614

644,923
644,958
ELEVASI TANAH ASLI

1,40

1,10

1,10

1,40

0,30
JARAK / DISTANCE (m') 1,50 3,45

CD 8/3

Kupasan m2
= -
Stripping 648
Galian
= 5.885 m2 CL
Excavation
Timbunan m2
= 3.062 0.30 2.50 0.30
Embankment
Pas. Batu 645.807
= 2.550 m2
Stone Masonry 1.20 645.278
645
644.607
0.30
0.30
0.60 2.50 0.60

bidang persamaan
reference level
641,00
645,256

645,002

645,021
645,327

645,578
0,70 644,444

644,322
ELEVASI TANAH ASLI
1,20

JARAK / DISTANCE (m') 1,50 1,50 2,00 2,85


BG 8/4

Kupasan m2
= -
Stripping 648
Galian
= 5.281 m2 CL
Excavation
Timbunan m2
= 4.004 0.30 2.50 0.30
Embankment
Pas. Batu 645.863
= 2.550 m2
Stone Masonry 1.20 645.335
645 644.663
0.30
0.30
0.60 2.50 0.60

bidang persamaan
reference level
641,00

645,116

644,885

644,911
645,304

645,298
644,501

644,367
ELEVASI TANAH ASLI

1,25

0,25
JARAK / DISTANCE (m') 1,75 1,75 2,00 2,80

Kupasan
Stripping
= m2 CD 8/5
Galian
Excavation
= 4.941 m2 CL
Timbunan m2
= 1.975
Embankment 0.30 3.20 0.30
Pas. Batu 646 645.706
= 3.172 m2
Stone Masonry 645.134
645 1.24

644.463
0.30
0.30
0.90 2.00 0.90

bidang persamaan
reference level
641,00
645,206
0,70 645,266
0,60 644,651

644,681

645,016
0,60 645,173

645,166
0,50 643,831

643,773
ELEVASI TANAH ASLI
1,00

0,90

0,90

JARAK / DISTANCE (m') 1,50 1,50


Kupasan
Stripping
= m2 BCD 9A
Galian m2
= 4.611
Excavation
Timbunan m2
= 1.949
Embankment
Pas. Batu 646
= 3.172 m2
Stone Masonry
645

bidang persamaan
reference level
641,00

645,206
0,70 645,266
0,60 644,451

644,481

645,016
0,60 645,173

645,166
0,50 643,831

643,773

643,773
ELEVASI TANAH ASLI

1,00

0,90

0,90
JARAK / DISTANCE (m') 1,50 1,50 1,50

CD 9/1

Kupasan
= - m2 CL
Stripping 647
Galian m2
= 6.863
Excavation 0.30 2.50 0.30
Timbunan m2
= 4.184
Embankment
Pas. Batu 645 1.20

= 2.550 m2
Stone Masonry 0.30
0.30
0.60 2.50 0.60

bidang persamaan
reference level
640,00
647,426

645,126

644,766

644,890
645,350

645,826

645,789

643,089

642,939
ELEVASI TANAH ASLI

1,30

1,00
JARAK / DISTANCE (m') 1,50 2,20 1,50 1,50 2,00 2,00
CD 9/2
Kupasan
= - m2 CL
Stripping
Galian m2
= 4.611
Excavation 0.30 2.50 0.30
Timbunan
646 645.646
= 2.305 m2
Embankment 645.114
Pas. Batu 645 1.20
= 2.550 m2 644.446
Stone Masonry 0.30
0.30
0.60 2.50 0.60

bidang persamaan
reference level
640,00

644,844

644,732

644,696
645,386

645,354

643,812

643,761
ELEVASI TANAH ASLI

0,90

1,00
JARAK / DISTANCE (m') 1,50 1,50 1,50 1,60

BCD 9
Kupasan m2
= -
Stripping
Galian m2
= -
Excavation
Timbunan
647
= - m2
Embankment
Pas. Batu
= - m2
Stone Masonry
645

bidang persamaan
reference level
641,00
644,909
0,50 645,351

645,487

644,681
644,488

645,493
0,20 645,586
0,70 644,633
0,70 644,633
0,70 644,227
644,227
0,30 644,623
644,623

643,384
0

ELEVASI TANAH ASLI


1,00
0,20

0,20

1,00
JARAK / DISTANCE (m') 1,80 2,00
CD 9/3

Kupasan m2
= 0.213
Stripping 648
Galian m2
= 4.828
Excavation CL
Timbunan m2
= 2.687
Embankment
0.30 2.50 0.30
Pas. Batu
= 2.550 m2 645.492
Stone Masonry
645 1.20 644.960

644.292
0.30
0.30
0.60 2.50 0.60

bidang persamaan

0,35 644,125 644,125


0,100,30 644,473 644,473
reference level
641,00

645,103

644,733

644,694
645,015

645,343

644,471
644,471
643,763
643,710
ELEVASI TANAH ASLI

1,20

1,00

0,90

1,00
JARAK / DISTANCE (m') 2,00 1,50

CD 9/4
Kupasan m2
Stripping
= 0.152 CL
Galian m2
= 6.133
Excavation
Timbunan
646 0.30 2.50 0.30
= 3.758 m2 645.454
Embankment
Pas. Batu 645 1.20 644.922
= 2.550 m2
Stone Masonry 644.254
0.30
0.30
0.60 2.50 0.60

bidang persamaan

0,30 643,941 643,941


reference level
640,00
645,707
0,30 645,420

644,569

644,535
644,976

645,017
0,70 643,865

643,865
0,45 643,333
643,177
643,109
ELEVASI TANAH ASLI
1,00

1,20

1,30

1,40

1,00
JARAK / DISTANCE (m') 1,90
CD 9/5

648
Kupasan m2
Stripping
= - CL
Galian m2
= 5.288
Excavation
0.30 2.50 0.30
Timbunan m2
= 3.645 645.430
Embankment
Pas. Batu 645 1.20 644.898
= 2.550 m2
Stone Masonry 644.230
0.30
0.30
0.60 2.50 0.60

bidang persamaan

0,40 642,708 642,708


0,30 643,308 643,308
reference level
640,00

646.445
0,85 645,295

644,613
0,30 644,489

644,465

644,441
0,40 645,223

645,218

643,316

642,799
642,754

642.692
ELEVASI TANAH ASLI

1,25

1,25

1,00
JARAK / DISTANCE (m') 2,00 2,00 1,90

CD 9/6

649

Kupasan m2
= -
Stripping CL
Galian m2
= 5.272
Excavation
0.30 2.50 0.30
Timbunan m2
= 2.111 645.348
Embankment
Pas. Batu 645 1.20 644.816
= 2.550 m2
Stone Masonry 644.148
0.30
0.30
0.60 2.50 0.60

bidang persamaan
reference level
640,00
645.874
644,574

644,465

644,422
644,857

644,941

644,229

647,129
ELEVASI TANAH ASLI
1,20

1,20

1,20

1,30

JARAK / DISTANCE (m') 1,50 3,00


CD 9/7
Kupasan m2
= -
Stripping
Galian m2
= 6.536
Excavation
Timbunan
647 CL
= 3.258 m2
Embankment
Pas. Batu 0.30 2.50 0.30
= 2.550 m2
Stone Masonry 645.286
645 1.20 644.754

644.086
0.30
0.30
0.60 2.50 0.60
bidang persamaan
reference level
641,00

644,733

644,292

644,383
0,40 645,095
0,80 645,066

644,049

643,915
ELEVASI TANAH ASLI

1,30

1,00
JARAK / DISTANCE (m') 1,70 1,50 1,50

Kupasan
Stripping
= - m2 CD 9/8 (BCD 10A)
Galian m2
= 4.478
Excavation
Timbunan
CL
= 3.310 m2
Embankment
Pas. Batu 646 0.30 1.60 0.30
= 2.280 m2
Stone Masonry 645.276
645 1.20 644.744

644.076
0.30
0.30
0.60 1.60 0.60
bidang persamaan
reference level
641,00
644,733

644,292

644,383
0,40 645,095
0,80 645,066

644,049

643,915
ELEVASI TANAH ASLI
1,30

JARAK / DISTANCE (m') 1,70 1,50 1,50 2,50


CD 9/9

648
CL
Kupasan m2
= -
Stripping
0.30 2.50 0.30
Galian m2
= 5.300 645.224
Excavation
Timbunan
645 644.692
1.20
= 2.130 m2
Embankment 644.024
Pas. Batu 0.30
= 2.550 m2 0.30
Stone Masonry 0.60 2.50 0.60

bidang persamaan
reference level
639,00

644,509

644,440

644,384
0,40 645,006
645,408
645,350

645,350

642,150
ELEVASI TANAH ASLI

1,40

1,40

1,00

1,20
JARAK / DISTANCE (m') 1,80 3,00

CD 9/10
Kupasan m2
= 0.247
Stripping
Galian CL
= 6.292 m2
Excavation
Timbunan
646
= 4.822 m2 0.30 2.50 0.30
Embankment
Pas. Batu 645 645.046

= 2.550 m2 1.20 644.514


Stone Masonry
643.846
0.30
0.30
0.60 2.50 0.60

bidang persamaan
reference level
640,00
644,537

644,537

644,321

644,329
644,857

644,837

643,128
0,30 642,246

641,742
ELEVASI TANAH ASLI 1,10

1,10

1,40
JARAK / DISTANCE (m') 2,60 2,30 2,50 2,70
BCD 10
Kupasan m2
= -
Stripping
Galian m2
= -
Excavation
Timbunan
646
= - m2
Embankment
Pas. Batu 645
= - m2
Stone Masonry

bidang persamaan
reference level
640,00

645,757

644,253

644,111

644,147
0,80 645,225

645,261

644,367

643,639
0,85 643,137
643,145
643,545
ELEVASI TANAH ASLI

1,40

1,30

1,30
JARAK / DISTANCE (m') 2,30 1,60 1,50 1,50

CD 10/1
Kupasan m2
= -
Stripping
Galian
CL
= 5.514 m2
Excavation
Timbunan
646
m2 0.30 2.50 0.30
= 2.823
Embankment 645.136
Pas. Batu 645
= 2.550 m2 1.20 644.585
Stone Masonry
643.936
0.30
0.30
0.60 2.50 0.60

bidang persamaan
reference level
640,00
645,264
0,80 644,531

644,243

644,377
644,925

645,159

644,444
0,40 642,837

642,806
ELEVASI TANAH ASLI

1,10
JARAK / DISTANCE (m') 2,20 1,50 1,50 2,40 1,60
CD 10/2
Kupasan m2
= 0.195
Stripping
Galian
CL
= 4.229 m2
Excavation
Timbunan
646
= 2.117 m2 0.30 2.50 0.30
Embankment 645.096
Pas. Batu 645
= 2.550 m2 1.20 644.545
Stone Masonry
643.896
0.30
0.30
0.60 2.50 0.60

bidang persamaan
reference level
640,00

644,815
0,50 644,419

644,155

644,277
644,802

644,456

642,749

642,705
ELEVASI TANAH ASLI

1,40

1,40

1,30

1,20
JARAK / DISTANCE (m') 2,10 2,10

CD 10/3
Kupasan m2
= -
Stripping
Galian
CL
= 4.748 m2
Excavation
Timbunan
646
m2 0.30 2.50 0.30
= 2.505
Embankment 645.111
Pas. Batu 645
= 2.550 m2 1.20 644.560
Stone Masonry
643.911
0.30
0.30
0.60 2.50 0.60

bidang persamaan
reference level
640,00
644,679
0,30 644,211

644,067

644,341
644,677

644,713
0,30 643,721

643,703
642,400

642,298
ELEVASI TANAH ASLI
1,30

1,40

1,40

1,30
JARAK / DISTANCE (m') 2,00 3,00
CD 10/3+46
Kupasan m2
= -
Stripping
Galian
= 5.519 m2 CL
Excavation
Timbunan
646
= 3.081 m2
Embankment 0.20 0.20

Beton K-175 645 0.20


644.866
= 1.545 m2
Concrete 1.20
644.315

0.15
0.20 643.666
0.10

2.15
2.55
2.75

bidang persamaan
reference level
640,00

644,201
0,80 644,124
0,80 644,223
0,70 645,109

645,055

642,701

642,486
ELEVASI TANAH ASLI

JARAK / DISTANCE (m') 2,40 1,70 3,00 1,80

Kupasan
Stripping
= - m2 CD 10/5
Galian
= 8.218 m2 CL
Excavation
Timbunan m2
= 3.354
Embankment 0.30 2.50 0.30
Pas. Batu 645 644.774
= 2.550 m2
Stone Masonry 1.20 644.223

643.574
0.30
0.30
0.60 2.50 0.60

bidang persamaan
reference level
640,00
645,634

644,259

644,011

643,513

643,168

642,672
ELEVASI TANAH ASLI

JARAK / DISTANCE (m') 2,20 2,00 3,00 1,50 1,50 1,50


Kupasan
Stripping
= - m2 CD 10/6
Galian
Excavation
= 3.965 m2 CL
Timbunan m2
= 3.358
Embankment 0.30 2.50 0.30
Pas. Batu 645 644.674
= 2.550 m2
Stone Masonry 644.123
1.20

643.474
0.30
0.30
0.60 2.50 0.60

bidang persamaan
reference level
640,00

647,771

643,653

643,649

643,673
644,127

644,451

642,602
644,171
ELEVASI TANAH ASLI

0,30

1,40
JARAK / DISTANCE (m') 1,80 1,50 1,50 2,60 2,90

Kupasan
Stripping
= - m2 CD 10/7
Galian
Excavation
= 5.655 m2 CL
Timbunan m2
= 4.086
Embankment 0.30 2.50 0.30
Pas. Batu 645 644.634
= 2.550 m2
Stone Masonry
1.20 644.083

643.434
0.30
0.30
0.60 2.50 0.60

bidang persamaan
reference level
640,00
644,351

643,637

643,559

643,555
0,40 644,057

644,171

643,191

641,493

641,405
ELEVASI TANAH ASLI
1,30

1,00

1,00

1,30

1,00

1,30
JARAK / DISTANCE (m') 4,00 3,00
Kupasan
Stripping
= - m2 CD 10/8
Galian m2
Excavation
= 6.251 CL
Timbunan m2
= 2.648
Embankment
Pas. Batu 645 0.30 2.50 0.30
= 2.550 m2 644.541
Stone Masonry
1.20 643.990

643.341
0.30
0.30
0.60 2.50 0.60

bidang persamaan
reference level
640,00

642,114
645,109

643,897

643,823

643,876
644,469

644,350
644,014
641,914

642,114
642,114
642,414
ELEVASI TANAH ASLI

1,30

1,10

1,10

0,40
0,30
0,10
0,50
0,20
1,00
JARAK / DISTANCE (m') 1,60 1,90

Kupasan
Stripping
= - m2 CD 10/9
Galian
Excavation
= 4.995 m2 CL
Timbunan m2
= 1.489
Embankment
Pas. Batu 645 0.30 2.50 0.30

= 2.550 m2 644.589
Stone Masonry
1.20 644.038

643.389
0.30
0.30
0.60 2.50 0.60

bidang persamaan
reference level
640,00
0,70 643,770

643,751

643,798
644,360

644,267

ELEVASI TANAH ASLI


1,10

1,10

JARAK / DISTANCE (m') 2,00


Kupasan
Stripping
= 0.205 m2 CD 10/10
Galian m2
= 7.291
Excavation CL
Timbunan m2
= 4.812
Embankment
Pas. Batu 645 0.30 2.50 0.30
= 2.550 m2 644.511
Stone Masonry
1.20 643.960

643.311
0.30
0.30
0.60 2.50 0.60

bidang persamaan
reference level
640,00

645,175
645,175

643,775

643,657

643,821
644,289

644,081

640,581
ELEVASI TANAH ASLI

1,00
0,30

1,10

1,10

0,90
JARAK / DISTANCE (m') 1,60 2,00

CD 10/10+27
Kupasan m2
= -
Stripping
Galian m2
= 5.323
Excavation
646 CL
Timbunan m2
= 3.143
Embankment
Pas. Batu 645 0.30 1.00 0.30
= 2.100 m2 644.442
Stone Masonry
1.30 643.891

643.242
0.30
0.30
0.60 1.00 0.60

bidang persamaan
reference level
640,00
645,531
0,70 643,631

643,647

643,794
644,204
644,841

644,745

643,388
643,397

ELEVASI TANAH ASLI


1,00

1,30

1,30

1,00

1,30
0,20

JARAK / DISTANCE (m') 3,00


CD 10/11+12
Kupasan m2
= -
Stripping
Galian m2
= 5.587
Excavation
646 CL
Timbunan m2
= 3.674
Embankment
Pas. Batu 645 0.30 1.80 0.30
= 2.340 m2 644.377
Stone Masonry
1.20 643.826

643.177
0.30
0.30
0.60 1.80 0.60
bidang persamaan
reference level
640,00

643,474

643,355

643,435
0,60 644,297

644,285

643,265
0,50 644,565
643,277
ELEVASI TANAH ASLI

1,00

1,00

1,10
0,20
JARAK / DISTANCE (m') 1,70 2,10

Kupasan
Stripping
= - m2 CD 10/12
Galian m2
= 12.000
Excavation CL
Timbunan m2
= 2.218
Embankment
Pas. Batu 645 0.30 2.50 0.30
= 2.550 m2 644.368
Stone Masonry
1.20 643.817

643.168
0.30
0.30
0.60 2.50 0.60
bidang persamaan
reference level
640,00
646,001
0,80 644,801

644,293

641,293

640,285
ELEVASI TANAH ASLI

JARAK / DISTANCE (m') 1,00


1,50 3,50 2,00
Kupasan
Stripping
= - m2 CD 10/13
Galian m2
= 7.789
Excavation
Timbunan
CL
= 2.845 m2
Embankment
Pas. Batu 645 0.30 2.50 0.30
= 2.550 m2
Stone Masonry 644.236

1.20 643.685

643.036
0.30
0.30
0.60 2.50 0.60
bidang persamaan
reference level
640,00

643,489

643,495

643,529
0,50 644,577

644,389
0,30 643,302

643,264
ELEVASI TANAH ASLI

1,20

1,20

1,00
JARAK / DISTANCE (m') 2,00 3,00

BCD 11
Kupasan m2
= -
Stripping
Galian
CL
= 5.460 m2
Excavation
Timbunan
645
= 3.368 m2 0.30 2.50 0.30
Embankment 644.096
Pas. Batu
= 2.550 m2 1.20 643.545
Stone Masonry
642.896
0.30
0.30
0.60 2.50 0.60

bidang persamaan

0,30 643,425643,425
0,40 644,271644,271
reference level
639,00
644,544
644,539
0,30 644,147
0,70 642,917

642,917

643,131

0,80 642,999
643,105
643,114
643,114
642,054
641,947
ELEVASI TANAH ASLI
1,00

1,10

0,90
JARAK / DISTANCE (m') 1,50 1,50