Step Specific Hazard Assessment

Area: SWRO-1

Equipment Descript/ KKS: CO2 DCS Room DE-HUMIDIFIER Unit

Replacement of defective boiler,


Presently spares were under
Task Description: procurement. So please keep unit under Page 1 of 1 JHA Number - 001
isolation and once we get the spares we
will replace the same

Task Step # Task Step Description Potential Hazard Steps Taken to Avoid Hazard PPE Required
Hand Protection, Chemical Suit, Leather
Impact, Chemical, Penetration, Compression,
Racked out, Isolated, Drained, Purged, Area Apron, Nomex Suit, Face Shield (Clear -
Electrical, Thermal, Light-Non-Ionizing Radiation
Barricaded, Flushed, Welding Curtains, Tie-Off, ect. Smoked), Harness, Respirator, Breathing
(Welding Flash), Falls, Atmospheric, Mechanical
Air, ect.

Use regular PPE Like Gloves, Goggles,


1 Isolation permit to be accepted Electrical Hazard Use appropriate tools (Say Insulated)
Helmet Safety Shoes and Insulated tools

Opening false ceiling covers and dehumidifier covers if Inspected ladder and tools, Cotton Gloves
2 required
Slip Hazard, Sharp Edges, tool slipping Second person support while opening and holding
and regular PPE

Checking electrical circuit and Dehumidifier functional


checks along with regular inspections and replacement of
3 defective boiler if spares available. NOTE: If spares not Electrical Hazard use insulated tools and proper PPE Cotton Gloves and regular PPE
availbale kept the system under isolation and till we
get the spares

Checking electrical circuit and Dehumidifier functional


4 checks along with regular inspections
Electrical Hazard use insulated tools and proper PPE Cotton Gloves and regular PPE

Inspected tools, Cotton Gloves and regular


5 Closing of all opened covers Slip Hazard, Sharp Edges, tool slipping Second person support while opening and holding
PPE

6 House keeping Environmental Hazard Remove all tools & tackles from the workspot Cotton Gloves and regular PPE

Tools Needed: Insulated tools, Inspected ladder, britools, Required PPE

HA Written/ Revised By: A.R.Chowdary JHA Reviewed By CRE : JHA Reviewed By AE: Date of Revision: 03/01/2016