Construction of Container Site Office

Drawing No : 1011-A-0004
UNIT RATE (IDR) AMOUNT
S/N. DESCRIPTION UNIT QUANTITY
Material Labor (IDR)
I Preliminaries
Mobilization of all personnel, plants, crane and any other required equipment and materials to
1 Ls 1.00 -
carry out the work and to maintain them till job completion.

Establish and maintain during the entire period of stay at site Contractors' all temporary facilities
2 Included
such as office, workshop, fabrication area, store, sanitary facilities, etc.

Demobilization of all personnel, plant and equipment and materials upon completion of the
3 Included
works, with the approval from the Engineer

Removal of all contractor's temporary facilities after completion of the works and make the
4 Included
complete area clean before leaving the site, with the approval from the Engineer

Provide all required tools & equipments such as truck/trailer, forklift, scaffolding material and
5 Included
crane below 50 ton.
6 Provide skill and unskill manpower for execution of the work Included

7 Provide 1 person Quality Control and Safety Officer as per requirement of the services Included

8 Temporary site office and fabrication workshop Included


9 Site supervision Included
10 Local transport, accomodations and meals Included
Loading and unloading material from Logistic to contractor's fabrication workshop and to job site
11 Included
location
12 Provide proper safety equipment Included
13 Safety standard Included
14 Security of contractor's tools and equipment in scope of contractor Included
15 Jamsostek like health insurance during this contract period Included
16 Cleaning the area during and after completion of the works Included
SUB TOTAL I -
II Construction
1 Shifting Container Excl. Container Price ( Sz. 40' : 2 Units ) Lot - -

Placing reinforced cement concrete in footings, foundations, drains and pits, columns, beams,
2 slabs kerbs, walls, staircase, etc. including finishing to the required line and level, curing
forming construction joints, etc. complete

K 175 M3 - -

Unloading, transporting , bending, cutting, placing and fixing in position at all levels
3 reinforcement including labour, binding wire, cutting tools, etc. complete as per design drawings
and directions of the Engineer / site supervisor.

BRC Mesh M8 - 150 M2 - -

4 Roofing Works: supply & install light steel frame (C75) including metal roof (t=0.25mm) M2 193.32 -

Fixing noninsulated cladding, TR40SP or TR22SP RAL 6019, c/w fastner (Rate to include all
5 M2 39.47 -
labor, cutting, bending, supply of SS fasteners, etc. complete)
6 Electrical installation including wiring & install the fixtures for:
(All materials to be supplied by Owner)
a. Fluorescent lamp Nos 15.00 -
b. Single Switch Nos 3.00 -
c. Receptacle Nos 9.00 -
d. Panel Box Nos 1.00 -
7 Supply & install AC (LG 1 PK) Unit 4.00 -
8 Exhaust Fan 12" Unit - -
9 Wall & Ceiling
a. Wooden frame including plywood (t=4mm) for wall M2 131.10 -
b. Gipsum 9 mm with metal frame and painted finish M2 59.34 -
10 Cutting container wall for door & windows frame Nos 8.00 -
11 Supply & install door & windows:
a. Door 2.1m x 0.9m: Wooden frame + Plywood t=4mm Nos 4.00 -
b. Window 1.2mx0.8m: Wooden frame + glass (clear) Nos 4.00 -
12 Painting
a. Plywood wall M2 131.10 -
b. Container M2 131.10 -
SUB TOTAL - II ( for 1 Unit ) -
GRAND TOTAL for 1 Unit -
Rate Per-Sq.m -
Note : - Actual quantity as per measurement at Site
- Excl. Supply and Installation of Power, and Cabling Power
- Excl. Supply and Installation of IT/IS
- Excl. Supply and Installation of Sanitary and Plumbing
- Rate will be negotiated by procurement

Page 1 of 2
Construction of Container Site Office

Drawing No : 1011-A-0005
UNIT RATE (IDR) AMOUNT
S/N. DESCRIPTION UNIT QUANTITY
Material Labor (IDR)
I Preliminaries
Mobilization of all personnel, plants, crane and any other required equipment and materials to
1 Ls 1.00 -
carry out the work and to maintain them till job completion.

Establish and maintain during the entire period of stay at site Contractors' all temporary facilities
2 Included
such as office, workshop, fabrication area, store, sanitary facilities, etc.

Demobilization of all personnel, plant and equipment and materials upon completion of the
3 Included
works, with the approval from the Engineer

Removal of all contractor's temporary facilities after completion of the works and make the
4 Included
complete area clean before leaving the site, with the approval from the Engineer

Provide all required tools & equipments such as truck/trailer, forklift, scaffolding material and
5 Included
crane below 50 ton.
6 Provide skill and unskill manpower for execution of the work Included

7 Provide 1 person Quality Control and Safety Officer as per requirement of the services Included

8 Temporary site office and fabrication workshop Included


9 Site supervision Included
10 Local transport, accomodations and meals Included
Loading and unloading material from Logistic to contractor's fabrication workshop and to job site
11 Included
location
12 Provide proper safety equipment Included
13 Safety standard Included
14 Security of contractor's tools and equipment in scope of contractor Included
15 Jamsostek like health insurance during this contract period Included
16 Cleaning the area during and after completion of the works Included
SUB TOTAL I -
II Construction
1 Shifting Container Excl. Container Price ( Sz. 40' : 3 Units ) Lot - -

Placing reinforced cement concrete in footings, foundations, drains and pits, columns, beams,
2 slabs kerbs, walls, staircase, etc. including finishing to the required line and level, curing
forming construction joints, etc. complete

K 175 M3 - -

Unloading, transporting , bending, cutting, placing and fixing in position at all levels
3 reinforcement including labour, binding wire, cutting tools, etc. complete as per design drawings
and directions of the Engineer / site supervisor.

BRC Mesh M8 - 150 M2 - -

4 Roofing Works: supply & install light steel frame (C75) including metal roof (t=0.25mm) M2 128.87 -

Fixing noninsulated cladding, TR40SP or TR22SP RAL 6019, c/w fastner (Rate to include all
5 M2 32.82 -
labor, cutting, bending, supply of SS fasteners, etc. complete)
6 Electrical installation including wiring & install the fixtures for:
(All materials to be supplied by Owner)
a. Fluorescent lamp Nos 10.00 -
b. LED E27 Nos 4.00 -
c. Single Switch Nos 1.00 -
d. Double Switch Nos 1.00 -
e. Receptacle Nos 6.00 -
f. Panel Box Nos 1.00 -
7 Supply & install AC (LG 1 PK) Unit - -
8 Exhaust Fan 12" Unit - -
9 Wall & Ceiling
a. Wooden frame including plywood (t=4mm) for wall M2 85.52 -
b. Gipsum 9 mm with metal frame and painted finish M2 89.01 -
10 Cutting
a. Cutting container wall for door & windows frame Nos 7.00 -
b. Cutting container wall M2 118.68 -
11 Supply & install door & windows:
a. Door 2.1m x 1.9m: Wooden frame + Plywood t=4mm Nos 1.00 -
b. Window 1.2mx0.8m: Wooden frame + glass (clear) Nos 6.00 -
12 Painting
a. Plywood wall M2 85.52 -
b. Container M2 85.52 -
SUB TOTAL - II ( for 1 Unit ) -
GRAND TOTAL for 1 Unit -
Rate Per-Sq.m -
Note : - Actual quantity as per measurement at Site
- Excl. Supply and Installation of Power, and Cabling Power
- Excl. Supply and Installation of IT/IS
- Excl. Supply and Installation of Sanitary and Plumbing
- Rate will be negotiated by procurement